L. Lowering of Bracket and Form Frame1. When formwork and supporting post need to be removed, bracket and supporting post shall be lowered.a. Before lowering work, the contractor shall check whether bracket and supporting post may interfere with the structure, and thereby, take measures to prevent such problems during lowering work as damage.2. The bracket removal work for its lowering shall follow the sequences specified in the construction drawing. If the sequences or methods should be changed, the contract shall refer the change to the BRD engineer and the supervisor for approval.
đang được dịch, vui lòng đợi..