9.8 Grit BlastingAll grit blasting activities shall be under the permi dịch - 9.8 Grit BlastingAll grit blasting activities shall be under the permi Việt làm thế nào để nói

9.8 Grit BlastingAll grit blasting


9.8 Grit Blasting
All grit blasting activities shall be under the permit to work category due to the presence of several hazards. These activity can be considered critical works and SWMS and JSA must be approved prior PTW application be made.
Blasters must be competent to perform the work with sufficient training and carried out. Requirement under the approved Grit Blasting procedure (S-000-1654-0560V) must be complied and stipulated to JSA and SWMS.

9.9 Use of Man Basket

All Suspended man lifts by using the crane comes under the permit to work category due to the high risk / hazards presence. Prior to lifting, all check list need to done along with the approved permit forms which includes daily equipment checklist. Refer to JGCS Lifting and Rigging procedure: S-000-1654-0530V.


9.10 Floor, Grating, Hand Rail Removal

• Any work that removes fall protection and edge protection must be subject to PTW Approval to ensure that suitable alternative controls are in place to prevent falls from height.
• A separate Gratings Removal Form shall be completed and approved.
• Any modification to handrails that does not require the removal of that handrail and hence does not diminish the fall protection does not need a PTW.
• Grating & Handrail removal awareness training shall be conducted to the respective subcontractor’s engineers, supervisors, foreman involved in this activity.

9.11 Hydrostatic or Pneumatic Testing
All hydro testing and pneumatic testing needs an approved permit prior starting the work activity. All safety precautions and safe distance should be maintained as per the approved work method statements and job safety analysis. Pneumatic testing of Instrument tubing will not be


NSRP Complex Project Employer Doc. No.
Rev. 2

Title: PTW(Permit to Work) Procedure Contractor Doc. No.
S-000-1654-0200V
Page 21 of 40



subject to a Permit to Work but strict controls are to be implemented.

9.12 Lifting Category / All Crane Lifts Tower Crane, Mobile Crane




# Lift Categories
Load (tons) Lift Plan
(Prepared by) Approval by Accepted
Subcontractor JGCS NSRP/IPMT
1 Standard Lift (Load
< 10) Green Card for Lifting
(Crane Operator)
with JSA Construction Supervisor in Charge Safety Supervisor in Zone to support
SV NA
2 Any lifts (Load < 10) that requires tandem lift, unknown center
of gravity, etc. Lift Evaluation Sheet
& PTW with MS & JSA (Construction Supervisor) Rigging Supervisor Construction
Supervisor in Zone NA
2 Non-Standard Lift 10
> ; < 50 Lift Evaluation Sheet
& PTW with MS & JSA (Construction Supervisor) Rigging Supervisor Construction
Supervisor in Zone NA
3 Engineering Lift - I
50 > ; < 200 Engineering Lifting Plan PTW with MS & JSA (Planning Manager/Engineer) Nippon Express: Project Manager Construction Manager CHUNJO:
Site Manager Construction Manager Others if any:
Persons authorized by
Subcontractors
Representative Heavy Lift Manager Heavy Lift Supervisor designated by Heavy Lift Manager




NA




4



Engineered Lift – II
200 >


Engineering Lifting Plan PTW with MS & JSA (Planning Manager/Engineer) Nippon Express: Project Manager Construction Manager CHUNJO:
Site Manager
Construction Manager Heavy Lift Manager Heavy Lift Supervisor designated by Heavy Lift Manager Resident Construction Manager or Zone Construction managers designated by Resident Construction
Manager
Refer to Lifting and Rigging Operation procedures S-000-1654-0530V


0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
9.8 Grit BlastingAll grit blasting activities shall be under the permit to work category due to the presence of several hazards. These activity can be considered critical works and SWMS and JSA must be approved prior PTW application be made.Blasters must be competent to perform the work with sufficient training and carried out. Requirement under the approved Grit Blasting procedure (S-000-1654-0560V) must be complied and stipulated to JSA and SWMS.9.9 Use of Man BasketAll Suspended man lifts by using the crane comes under the permit to work category due to the high risk / hazards presence. Prior to lifting, all check list need to done along with the approved permit forms which includes daily equipment checklist. Refer to JGCS Lifting and Rigging procedure: S-000-1654-0530V.9.10 Floor, Grating, Hand Rail Removal• Any work that removes fall protection and edge protection must be subject to PTW Approval to ensure that suitable alternative controls are in place to prevent falls from height.• A separate Gratings Removal Form shall be completed and approved.• Any modification to handrails that does not require the removal of that handrail and hence does not diminish the fall protection does not need a PTW.• Grating & Handrail removal awareness training shall be conducted to the respective subcontractor’s engineers, supervisors, foreman involved in this activity.9.11 Hydrostatic or Pneumatic TestingAll hydro testing and pneumatic testing needs an approved permit prior starting the work activity. All safety precautions and safe distance should be maintained as per the approved work method statements and job safety analysis. Pneumatic testing of Instrument tubing will not be


NSRP Complex Project Employer Doc. No.
Rev. 2

Title: PTW(Permit to Work) Procedure Contractor Doc. No.
S-000-1654-0200V
Page 21 of 40



subject to a Permit to Work but strict controls are to be implemented.

9.12 Lifting Category / All Crane Lifts Tower Crane, Mobile Crane




# Lift Categories
Load (tons) Lift Plan
(Prepared by) Approval by Accepted
Subcontractor JGCS NSRP/IPMT
1 Standard Lift (Load
< 10) Green Card for Lifting
(Crane Operator)
with JSA Construction Supervisor in Charge Safety Supervisor in Zone to support
SV NA
2 Any lifts (Load < 10) that requires tandem lift, unknown center
of gravity, etc. Lift Evaluation Sheet
& PTW with MS & JSA (Construction Supervisor) Rigging Supervisor Construction
Supervisor in Zone NA
2 Non-Standard Lift 10
> ; < 50 Lift Evaluation Sheet
& PTW with MS & JSA (Construction Supervisor) Rigging Supervisor Construction
Supervisor in Zone NA
3 Engineering Lift - I
50 > ; < 200 Engineering Lifting Plan PTW with MS & JSA (Planning Manager/Engineer) Nippon Express: Project Manager Construction Manager CHUNJO:
Site Manager Construction Manager Others if any:
Persons authorized by
Subcontractors
Representative Heavy Lift Manager Heavy Lift Supervisor designated by Heavy Lift Manager




NA




4



Engineered Lift – II
200 >


Engineering Lifting Plan PTW with MS & JSA (Planning Manager/Engineer) Nippon Express: Project Manager Construction Manager CHUNJO:
Site Manager
Construction Manager Heavy Lift Manager Heavy Lift Supervisor designated by Heavy Lift Manager Resident Construction Manager or Zone Construction managers designated by Resident Construction
Manager
Refer to Lifting and Rigging Operation procedures S-000-1654-0530V


đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!

9,8 Grit Nổ mìn
Tất cả các hoạt động nổ mìn grit phải theo giấy phép làm việc loại do sự hiện diện của một vài mối nguy hiểm. Các hoạt động có thể được coi là tác phẩm quan trọng và SWMS và JSA phải được phê chuẩn đơn xin PTW trước khi được thực hiện.
Blasters phải có thẩm quyền để thực hiện các công việc có đủ đào tạo và thực hiện. Yêu cầu theo các thủ tục phun cát Grit đã được phê duyệt (S-000-1654-0560V) phải tuân thủ quy định và để JSA và SWMS. 9.9 Sử dụng Man Basket Tất cả người đàn ông treo nâng bằng cần cẩu đi kèm theo giấy phép lao động do các loại cao rủi ro / nguy hiểm hiện diện. Trước khi nâng, tất cả các danh sách kiểm tra cần thiết để thực hiện cùng với các hình thức giấy phép đã được phê duyệt bao gồm danh sách kiểm tra thiết bị hàng ngày. Tham khảo JGCS nâng và Rigging thủ tục:. S-000-1654-0530V 9.10 Floor, Song cửa, Hand Rail diệt • Bất kỳ công việc mà loại bỏ bảo vệ mùa thu và bảo vệ cạnh phải chịu PTW phê duyệt để đảm bảo rằng việc kiểm soát thay thế thích hợp được đưa ra để Ngăn ngừa té ngã từ trên cao. • Một cách tử Form Removal riêng biệt sẽ được hoàn thành và phê duyệt. • Bất kỳ sửa đổi để tay vịn mà không đòi hỏi việc loại bỏ các lan can đó và do đó không làm giảm đi sự bảo vệ mùa thu không cần một PTW. • Grating & Tay vịn loại bỏ đào tạo nâng cao nhận thức sẽ được tiến hành để các nhà thầu phụ tương ứng của các kỹ sư, giám sát, quản đốc tham gia vào hoạt động này. 9,11 thủy tĩnh hoặc kiểm tra khí nén thử nghiệm Tất cả thủy và thử nghiệm khí nén cần giấy phép chấp thuận trước khi bắt đầu các hoạt động công việc. Tất cả biện pháp phòng ngừa an toàn và khoảng cách an toàn nên được duy trì theo các báo cáo phương pháp đã được phê duyệt và phân tích an toàn công việc. Thử nghiệm khí nén của Instrument ống sẽ không được tuyển dụng Dự án NSRP Complex Doc. Số Rev. 2 Tiêu đề: PTW (Giấy phép để làm việc) Thủ tục thầu Doc. Số S-000-1654-0200V Trang 21 của 40 đối tượng của một giấy phép để làm việc nhưng kiểm soát chặt chẽ được thực thi. 9.12 Nâng Category / Tất cả Crane Thang máy cẩu tháp, cẩu di động # Lift Categories Load (tấn) Kế hoạch Lift (Chuẩn bị by) Phê duyệt của Accepted thầu phụ JGCS NSRP / IPMT 1 Chuẩn Lift (Load <10) Thẻ Xanh cho nâng hạ (Crane Operator) với Giám sát xây dựng JSA trong Giám sát An toàn Charge Zone để hỗ trợ SV NA 2 Bất kỳ thang máy (Load <10) mà đòi hỏi tandem thang máy, trung tâm không rõ của lực hấp dẫn, vv Đánh giá Lift Tấm & PTW với MS & JSA (Giám sát xây dựng) Rigging Giám sát xây dựng Giám sát tại Khu NA 2 không chuẩn Lift 10 >; <50 Lift Đánh giá Tấm & PTW với MS & JSA (Giám sát xây dựng) Rigging Giám sát xây dựng Giám sát tại Khu NA 3 Cơ khí Lift - Tôi 50>; <200 Kỹ thuật nâng Plan PTW với MS & JSA (Lập kế hoạch quản lý / Engineer) Nippon Express: Quản lý dự án xây dựng Quản lý CHUNJO: Site Manager Xây dựng quản lý khác nếu có: Người được ủy quyền bởi nhà thầu phụ đại diện nặng Lift đốc Lift nặng Supervisor do nặng Lift đốc NA 4 Thiết kế Lift - II 200> Kỹ thuật nâng Plan PTW với MS & JSA (Lập kế hoạch quản lý / Engineer) Nippon Express: Quản lý dự án xây dựng Quản lý CHUNJO: Site Manager Quản lý Xây dựng nặng Lift đốc Lift nặng Supervisor do nặng Lift quản lý cư trú hoặc quản lý xây dựng Khu quản lý xây dựng theo chỉ thường trú Xây dựng quản lý tham khảo để nâng và Rigging Operation thủ tục S-000-1654-0530V
















































































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2024 I Love Translation. All reserved.

E-mail: