Connect the OT terminal of the white core together with the blue -48V/+24V power cable to one filter binding post.(2) Connect the black core together with the black -48V/+24V power cable to one filter binding post.(3) Connect the green core together with the yellow PGND cable to the PGND screw on the cabinet top.Note: For an environment monitor unit of 220V AC power supply connect the communication ground to the PGND screw on the cabinet top. Connect the AC power input cables still to the AC power distribution box.
đang được dịch, vui lòng đợi..
