10.4 Isolation ProcedureThe Permit Issuer shall determine the isolation requirements that for reasons of complexity, irregularity of use, or hazardous nature, are defined in the PTW.Permit Issuer is responsible for the “Test for Live” after the isolations are completed and is performed with the JGCS Task Supervisor, engineer (permit receiver) in attendance.Once isolations and “Test for Live” are complete the Permit Issuer & Permit Receiver can sign the permit to work or close the PTW as required. NSRP Complex Project Employer Doc. No. Rev. 2Title: PTW(Permit to Work) Procedure Contractor Doc. No.S-000-1654-0200V Page 24 of 4010.5 Person unable to be contactedIf a person has not removed their Personal Safety lock and Personal Danger tag and cannot be contacted, the Permit Issuer together with relevant JGCS Field Discipline Supervisor once approved by the Permit Approver shall together carry out the removal. The PTW shall be cancelled and “Note of Removal” documented on the PTW.11 ATTACHMENTAttachment 1: Permit to Work Approval Form Attachment 2: Confined Space Entry Certificate Attachment 3: Isolation & De-Isolation CertificateAttachment 4: Permit RE-VALIDATION – Gas test required prior to entry into Confined SpaceAttachment 5: Excavation CertificateAttachment 6: Radiography CertificateAttachment 7: Mesh Flooring, Grating and Stair Threads Removal CertificateTập tin đính kèm 8: Nặng / quan trọng LiftTập tin đính kèm 9: Làm việc tại chiều cao / giàn giáo tập tin đính kèm 10: làm việc trên các tập tin đính kèm cho các giấy chứng nhận nước 11: người đàn ông các tập tin đính kèm cho các giấy chứng nhận giỏ 12: lặn chứng chỉTập tin đính kèm 13: Đính kèm giấy chứng nhận điện De - Energization 14: áp lực / thiết bị điều de-áp chứng chỉ đính kèm 15: giấy chứng nhận công việc lạnh
đang được dịch, vui lòng đợi..