SCOPEColgate production facilities are required to validate critical equipment and processes by providing documented proof that their equipment and processes will consistently produce and meet predetermined specifications and product quality attributes. Completion of the DQ protocol is a prerequisite of the Installation Qualification (IQ) and Operation Qualification (OQ).The Template section of this document serves as a template for a DQ Protocol.PRINCIPLEA Design Qualification (DQ) is the process of establishing documented evidence that the design of the equipment is appropriate for the intended purpose and meets both Colgate-Palmolive and regulatory requirements.Design Qualification • Introduces the Validation team to the project.• Confirms that the design will meet the business needs. • Applies to Concurrent and Prospective Validations. • Confirms that required documentation has been generated. 1 ApprovalsThis DQ Protocol for Integrity Test Device BEATEST- BEA to do integrity test for ventilate filter which are used in ventilating for mixer, storage tanks, mobile tanks and hopper in Binh Tan plant has been reviewed and approved by the following authorized individuals:Prepared by:
đang được dịch, vui lòng đợi..
