Ronie GuzmanTunnel Engineer at OBAYASHI CORPORATION, Asian Regional He dịch - Ronie GuzmanTunnel Engineer at OBAYASHI CORPORATION, Asian Regional He Việt làm thế nào để nói

Ronie GuzmanTunnel Engineer at OBAY

Ronie Guzman
Tunnel Engineer at OBAYASHI CORPORATION, Asian Regional Headquarters
Singapour
Construction
Entreprise actuelle 1. OBAYASHI CORPORATION, Asian Regional Headquarters

Précédent 1. Impregilo,
2. Dubai Metro Rail project.,
3. Rider Hunt Liacor Inc.
Enseignement 1. Tarlac State University

+ de 500relations
Inscrivez-vous sur LinkedIn et accédez au profil complet de Ronie. C’est gratuit.
En tant que membre de LinkedIn, vous allez rejoindre 400 millions d’autres professionnels qui partagent des relations, des idées et des opportunités.
• Découvrir vos relations en commun
• Être mis en relation
• Contacter Ronie directement
Voir le profil complet de Ronie
Résumé
Extensive exposure and experience in the field of vertical and horizontal construction (Tunnels, Highways and bridges), Broad knowledge based on Engineering judgment, supervision, scheduling, Quality, monitoring of works and Quantity surveying/take off.
Expérience
• Tunnel Engineer
OBAYASHI CORPORATION, Asian Regional Headquarters
janvier 2013 – Aujourd’hui (3 ans 1 mois)Singapour
TBM excavation works.

• Monitor and controls TBM excavation operations, alignment and preparation of TBM Instruction sheet.
• Plans and monitor work activities from TBM launching to Docking.
• Controls Segment key selection and erection.
• CHI works.
• Monitors and control segment repairs.
• Surface works and material control.
• Review Tunnel plans and specifications.
• Liaise with the project owner and QPS.
• Prepare weekly schedule meetings and daily shift reports.

QC Inspector (Tunnel)
Impregilo
mai 2011 – décembre 2012 (1 an 8 mois)
“STRATEGIC TUNNEL ENHANCEMENT PROGRAMME (STEP-T02/03)”

ADSSC, Abu Dhabi, United Arab Emirates

Key Responsibilities

• Conduct inspections for excavation, rebar works, concrete pouring & Defect mapping for Diaphragm wall panels for work shaft and access shafts.
• Conduct inspections for the supports per required excavation support system (RESS) prior to shotcrete (SCL) applications for Non-TBM Excavations.
• Conduct Joint inspections with the consultant for the defect mappings on installed precast segment linings using TBM.
• Conduct inspections and record keepings for the defect repairs of installed segment linings, prior to CPL casting.
• Conduct inspections for the precast segment lining deliveries for the defects prior to acceptance and unloading.
• Pre installation inspections for the precast segment linings on the yard prior to lowering on the shaft for TBM use.
• Preparations for the CQC daily reports to be submitted to the immediate supervisor.
• Recommends issuance of Non-compliance notice/reports for any activities not conforming to the approved ITPs, Design drawings, and contract specifications.

Site Civil Engineer
Dubai Metro Rail project.
octobre 2008 – mai 2011 (2 ans 8 mois)
“DUBAI METRO RAIL TRANSIT” Obayashi Corp.

Dubai, United Arab Emirates


Key Responsibilities

1. Civil works (Structural)

• Responsible for the civil works on site: earth works, reinforcing bars installation, form works installations, structural concrete casting/placing, curing and concrete retouching works, water proofing and back filling works for over ground stations.
• Responsible for the deployment and leveling of manpower as well as utilization of heavy equipments.
• Responsible for the structural steel erections and lifting works in accordance with the standard safety rules and policies.
• Highly responsible to ensure proper safety regulations and policies on site/working areas.


2. Building works (Finishing/Architectural)

• Responsible for the proper installation of Sub frames, Cladding panels, doors, Ironmongeries and various finishing works based on approved const. plans, on over ground metro stations.
• Responsible for the Supervisions of various Sub-contractors.
• Responsible for the closure of snag items & maintenance works inside the Metro Stations.
• QA/QC Engineer
Rider Hunt Liacor Inc.
janvier 2008 – octobre 2008 (10 mois)
“TEXAS INSTRUMENT Clark Basebuild Building
Clark Freeport Zone, Clarkfield, Pampanga, Philippines

Key Responsibilities

• Conducts site inspection for Concrete and Steel structures as well as architectural finishes based on the approved codes and specifications.
• Conducts site inspections for the Road works from sub-grade preparation up to paving of pavements.
• Conducts joint survey inspections on the elevations and alignments of roads.
• Site inspections on material deliveries based on the standards and approved Specifications.
• Prepares inspections to generate punch listings to be accomplished by the general contractors prior to acceptance of the owner.
• Prepares site observation notices for the requested activities.
• Prepares non-conformance reports on the activities not conforming on the specifications.
• Prepares daily and weekly reports.

Site Civil Engineer
Obayashi Corporation
février 2007 – janvier 2008 (1 an)Philippines
“Subic-Clark-Tarlac Expressway (SCTex)”

Key Responsibil
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
Ronie GuzmanĐường hầm kỹ sư tại OBAYASHI CORPORATION, trụ sở chính khu vực Châu áSingapourXây dựngEntreprise actuelle 1. Công ty cổ phần OBAYASHI, trụ sở chính khu vực Châu áPrécédent 1. Impregilo, 2. dự án Dubai Metro Rail.,3. rider săn Liacor IncEnseignement 1. Tarlac State University+ de 500relationsInscrivez-vous sur LinkedIn et accédez au profil complet de Ronie. C'est gratuit.En ý que membre de LinkedIn, vous allez rejoindre 400 triệu d'autres professionnels qui partagent des quan hệ, des idées et des opportunités.• Découvrir vos quan hệ en thị• Être mis en quan hệ• Contacter Ronie directementVoir le profil complet de RonieLý lịchMở rộng tiếp xúc và kinh nghiệm trong lĩnh vực xây dựng dọc và ngang (đường hầm, đường cao tốc và cầu), rộng kiến thức dựa trên bản án kỹ thuật, giám sát, lập kế hoạch, chất lượng, giám sát các hoạt động và số lượng khảo sát/cất cánh.Expérience• Đường hầm kỹ sưCông ty cổ phần OBAYASHI, trụ sở chính khu vực Châu ájuillet 30th 2013-Aujourd'hui (3 ans 1 mois) SingapourCông việc làm đất TBM.• Giám sát và điều khiển TBM khai quật hoạt động, liên kết và chuẩn bị hướng dẫn TBM tấm.• Kế hoạch và giám sát hoạt động hoạt động từ TBM tung ra để Docking.• Điều khiển phân đoạn lựa chọn quan trọng và cương cứng.• CHÍ hoạt động.• Màn hình và kiểm soát phân đoạn sửa chữa.• Hoạt động bề mặt và kiểm soát tài liệu.• Xem xét kế hoạch đường hầm và thông số kỹ thuật.• Liaise with the project owner and QPS.• Prepare weekly schedule meetings and daily shift reports.• QC Inspector (Tunnel)Impregilomai 2011 – décembre 2012 (1 an 8 mois)“STRATEGIC TUNNEL ENHANCEMENT PROGRAMME (STEP-T02/03)”ADSSC, Abu Dhabi, United Arab EmiratesKey Responsibilities • Conduct inspections for excavation, rebar works, concrete pouring & Defect mapping for Diaphragm wall panels for work shaft and access shafts.• Conduct inspections for the supports per required excavation support system (RESS) prior to shotcrete (SCL) applications for Non-TBM Excavations.• Conduct Joint inspections with the consultant for the defect mappings on installed precast segment linings using TBM.• Conduct inspections and record keepings for the defect repairs of installed segment linings, prior to CPL casting.• Conduct inspections for the precast segment lining deliveries for the defects prior to acceptance and unloading.• Pre installation inspections for the precast segment linings on the yard prior to lowering on the shaft for TBM use.• Preparations for the CQC daily reports to be submitted to the immediate supervisor.• Recommends issuance of Non-compliance notice/reports for any activities not conforming to the approved ITPs, Design drawings, and contract specifications.• Site Civil EngineerDubai Metro Rail project.octobre 2008 – mai 2011 (2 ans 8 mois)“DUBAI METRO RAIL TRANSIT” Obayashi Corp.Dubai, United Arab EmiratesKey Responsibilities 1. Civil works (Structural)• Responsible for the civil works on site: earth works, reinforcing bars installation, form works installations, structural concrete casting/placing, curing and concrete retouching works, water proofing and back filling works for over ground stations.• Responsible for the deployment and leveling of manpower as well as utilization of heavy equipments.• Responsible for the structural steel erections and lifting works in accordance with the standard safety rules and policies.• Highly responsible to ensure proper safety regulations and policies on site/working areas.2. Building works (Finishing/Architectural)• Responsible for the proper installation of Sub frames, Cladding panels, doors, Ironmongeries and various finishing works based on approved const. plans, on over ground metro stations.• Responsible for the Supervisions of various Sub-contractors. • Responsible for the closure of snag items & maintenance works inside the Metro Stations.• QA/QC EngineerRider Hunt Liacor Inc.janvier 2008 – octobre 2008 (10 mois)“TEXAS INSTRUMENT Clark Basebuild BuildingClark Freeport Zone, Clarkfield, Pampanga, PhilippinesKey Responsibilities• Conducts site inspection for Concrete and Steel structures as well as architectural finishes based on the approved codes and specifications.• Conducts site inspections for the Road works from sub-grade preparation up to paving of pavements.• Conducts joint survey inspections on the elevations and alignments of roads.• Site inspections on material deliveries based on the standards and approved Specifications.• Prepares inspections to generate punch listings to be accomplished by the general contractors prior to acceptance of the owner. • Prepares site observation notices for the requested activities.• Prepares non-conformance reports on the activities not conforming on the specifications.• Prepares daily and weekly reports.• Site Civil EngineerObayashi Corporationfévrier 2007 – janvier 2008 (1 an)Philippines“Subic-Clark-Tarlac Expressway (SCTex)”Key Responsibil
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
Ronie Guzman
Engineer Tunnel tại OBAYASHI CORPORATION, Á Trụ sở Regional
Singapour
Xây dựng
Entreprise actuelle 1. OBAYASHI CORPORATION, Asian Regional Trụ sở TIÊN 1. Impregilo, 2. Dubai Metro Rail dự án., 3. Rider Hunt Liacor Inc. Enseignement 1. Tarlac State University + de 500relations Inscrivez-vous sur LinkedIn et accédez au profil complet de Ronie. C'est gratuit. En tant que membre de LinkedIn, vous allez rejoindre 400 triệu d'autres professionnels qui partagent des quan hệ, des IDEES et des opportunites. • DECOUVRIR vos quan hệ en commun • être mis en mối quan hệ • Contacter Ronie directement Voir le profil complet de Ronie sơ yếu lý lịch tiếp xúc rộng và kinh nghiệm trong lĩnh vực xây dựng dọc và ngang (Đường hầm, đường cao tốc và cầu), kiến thức rộng dựa trên Engineering án, giám sát, lập kế hoạch, chất lượng, giám sát công trình và Số lượng khảo sát / cất cánh. kinh nghiệm • Tunnel Kỹ sư OBAYASHI CORPORATION, Á Trụ sở Regional Janvier 2013 - Aujourd'hui (3 ans 1 mois) Singapour. công trình khai quật TBM • Màn hình và kiểm soát các hoạt động khai quật TBM, liên kết và chuẩn bị các tờ TBM Instruction. • Các kế hoạch và giám sát hoạt động công tác từ TBM tung ra để Docking. • Điều khiển Segment lựa chọn quan trọng và cương cứng. • CHI hoạt động. • Màn hình và sửa chữa đoạn kiểm soát. • công trình bề mặt và kiểm soát vật liệu. • Kế hoạch Tunnel Xem xét và thông số kỹ thuật. • Liên lạc với các chủ dự án và QPS. • Chuẩn bị lịch trình hội họp hàng tuần và báo cáo thay đổi hàng ngày. • QC Inspector (Tunnel) Impregilo mai 2011 - décembre 2012 (1 một mois 8) "CHIẾN LƯỢC CHƯƠNG TRÌNH HẦM NÂNG CAO (STEP-T02 / 03)" ADSSC, Abu Dhabi, United Arab Emirates Trách nhiệm chính • kiểm tra xử cho khai quật , các công trình thép cây, bê tông đổ & Defect bản đồ cho Diaphragm tấm tường cho trục làm việc và truy cập các trục. • kiểm tra xử cho các hỗ trợ cho mỗi hệ thống yêu cầu hỗ trợ đất (RESS) trước khi phun bê tông (SCL) ứng dụng cho Non-TBM cuộc khai quật. • phần ứng xử kiểm tra với các chuyên gia tư vấn cho các bản đồ khiếm khuyết về cài đặt lót phân đoạn đúc sẵn bằng cách sử dụng TBM. • kiểm tra xử và keepings kỷ lục cho việc sửa chữa khiếm khuyết của lót đoạn cài đặt, trước khi CPL đúc. • kiểm tra xử cho các giao lót phân đoạn đúc sẵn cho các khiếm khuyết trước chấp nhận và dỡ hàng. • kiểm tra cài đặt trước cho lót phân đoạn đúc sẵn trên sân trước khi hạ trên trục để sử dụng TBM. • Chuẩn bị cho báo cáo CQC hàng ngày để nộp cho cấp trên trực tiếp. • Khuyến nghị phát hành thông báo không tuân thủ / báo cáo cho bất kỳ hoạt động không đúng theo ITPS phê duyệt, bản vẽ thiết kế, thông số kỹ thuật và hợp đồng. • Kỹ sư XÂY Dubai Metro Rail dự án. Octobre 2008 - mai 2011 (2 ans 8 mois) "DUBAI METRO RAIL TRANSIT" Obayashi Corp Dubai, United Saudi Arab Trách nhiệm chính 1. Công trình dân dụng (kết cấu) • Chịu trách nhiệm cho các công trình dân dụng trên trang web: làm đất, tăng cường lắp đặt các thanh, hình thức hoạt động cài đặt, kết cấu bê tông đúc / đặt, bảo dưỡng các công trình chỉnh sửa bê tông, chống thấm nước và các công trình trở lại làm đầy cho qua trạm mặt đất. • Chịu trách nhiệm cho việc triển khai và san lấp mặt bằng của nguồn nhân lực cũng như sử dụng các thiết bị nặng. • Chịu trách nhiệm các cương cứng của thép kết cấu và nâng công trình phù hợp với các quy định và chính sách an toàn tiêu chuẩn. • Highly trách nhiệm đảm bảo các quy định về an toàn và chính sách trên trang web / các khu vực làm việc . 2. Công trình xây dựng (hoàn thiện / Kiến trúc) • Chịu trách nhiệm về các cài đặt thích hợp của khung Sub, tấm ốp, cửa ra vào, Ironmongeries và các công trình hoàn thiện khác nhau dựa trên const được phê duyệt. . kế hoạch, trên trên mặt đất trạm tàu điện ngầm. • Chịu trách nhiệm giám sát của nhiều Nhà thầu phụ • Chịu trách nhiệm về việc đóng cửa các mặt hàng & bảo trì snag làm việc bên trong ga tàu điện ngầm. • QA / QC Engineer Rider Hunt Liacor Inc. Janvier 2008 - Octobre 2008 (10 mois) "TEXAS INSTRUMENT Clark Basebuild Building Clark Freeport Zone, Clarkfield, Pampanga, Philippines Trách nhiệm chính • Thực hiện kiểm tra trang web cho các kết cấu bê tông và thép cũng như kết thúc kiến trúc dựa trên các mã và thông số kỹ thuật đã được phê duyệt. • Thực hiện kiểm tra trang web cho các đường các công trình từ chuẩn bị cấp tiểu lên đến lát vỉa hè. • Thực hiện kiểm tra khảo sát chung về độ cao và sự sắp xếp của con đường. • kiểm tra trang web trên giao tài liệu dựa trên các tiêu chuẩn và thông số kỹ thuật đã được phê duyệt. • Chuẩn bị kiểm tra để tạo ra danh sách những cú đấm để được thực hiện bằng cách tổng thầu trước khi chấp nhận của chủ sở hữu. • Chuẩn bị các thông báo quan sát tại chỗ cho các hoạt động yêu cầu. • Chuẩn bị báo cáo sự không phù hợp về các hoạt động không phù hợp trên các thông số kỹ thuật. • Chuẩn bị hàng ngày và báo cáo hàng tuần. • Kỹ sư XÂY ty Obayashi février 2007 - Janvier 2008 (1 an) Philippines "Subic-Clark-Tarlac Expressway (SCTex)" Responsibil Key






























































































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2024 I Love Translation. All reserved.

E-mail: