1.7 Roads traffic
External traffic
Land accesses: No. 8 highway to the north side of the planned north boundary; No. 6 highway on the west side of Mekong River; and No. 380 highway close to the west border of planning. Connection with Phnom Penh will mainly depends on No. 9 highway.
Water way: ferry is used to contact with Phnom Penh urban area.
Internal traffic
Land road: it is mainly of earth roads, with a width of about 5m, linking the scattered residential spots, high ways and ferries, but no road network system has been formed. The road conditions are bad, and in rainy season, part of the soil roads will be flooded.
Water way: in the rainy season, residents use ships as supplement to land traffic.