Chapter II Construction Site Management OrganizationConstruction site organization principleThe organization is set for the Project construction only, and the construction organization shall assign management staff in positions suitable for the construction of the Project.On the premise that work task required by the Project construction can be achieved, the organization shall be simplified as much as possible to reduce field management staff and strive to refinement and efficiency.The construction organization is relative stable, and is generally adjusted and assigned in accordance with the project progress changes, but significant changes shall be agreed by construction unit. The Project sets an organization with “three-level separation” as well as specific and division system. Definite function, clear interface, proper planning and rapid direction are required as the principles.The decision-making level: a project manager, a deputy project manager and a chief engineer is assigned to the decision-making level to manage and control the planning, organization, production, coordination, accounting, etc. of the Project. This level will act as the decision-making and command center for performing the project contract.Quản lý cấp: năm khoa bao gồm Cục kỹ thuật, chất lượng đảm bảo vùng, an toàn và Cục bảo vệ môi trường, vật liệu vùng và Tổng cục được thiết lập cho cấp độ quản lý dự án, tạo thành trung tâm quản lý kiểm soát chất lượng, an toàn, tiến bộ, tài liệu, công nghệ, chi phí, nhân lực, vv của dự án.Làm việc cấp: mỗi chi nhánh chuyên nghiệp.
đang được dịch, vui lòng đợi..