The process of running the plant system, firstly trial operation of each equipment help operating staff to become familiar with the equipment in the system, manipulate effectively to avoid the incident. Begin the process of running the system in the sand settling basinPreparation: operation diary, sample tests and paper and pencil, metering equipment (VOM meter, ampere alkaline, megaῺ) read equipment catalogs.- Firstly test runing of automatic coarse and fine screens.The process: + Step 1: Checking the inlet power source of cubicle+ Step 2: Checking the rotation direction of garbage reels and state of garbage separating machine (cleaning water, garbage mouth, and etc.), this process is implemented no load.+ Setp 3: Checking whether sensors and signals of indicating lamps in cubicle operate or not.+ Step 4: check the water level at the pumping station , start pumping to bring water into the girt chamber and pressing button to operate the raw and net garbage separating machine.+ Step5: Checking the nominal current and Observe the operation situations of machine. it is possible to test by substances with dimensions bigger than 6mm as waste-paper, milled wood, garbage, and etc.).Data will be noted in operation diary.- After that, run sand collection device + Step 1: Checking whether sensors and signals of indicating lamps in cubicle operate or not.+ Bước 2: kiểm tra mực nước tại các trạm bơm, bắt đầu bơm để đưa nước vào buồng girt và theo cảm biến siêu âm, khi mực nước đáp ứng L1 = 3,5 m, bơm 1 hoạt động, và sau đó bơm 2 và 3 sẽ hoạt động lại theo mực nước trong bể.+ Bước 3: Kiểm tra đầu ra nước của mỗi máy bơm thông qua đầu ra đồng hồ trên đường ống dẫn, so sánh với các sản lượng xếp dưới desigh, ghi âm theo dõi thường xuyên (thiết kế Q = 2,2 m3/phút). Quan sát các tình huống hoạt động của máy.+ ghi lại dữ liệu với evauate tình trạng của xe tăng, của khuấy máy làm cơ sở cho đầu tiên khởi động.
đang được dịch, vui lòng đợi..
