18. Completion of Outstanding Work and Remedying Defects18.1. In order that the Works and Contractor's Documents, and each the Equipment. shall be in the condition required by the Contract (fair wear and tear excepted) by the expiry date of the relevant Warranty Period or as soon as practicable thereafter, the Contractor shall:(a) complete any work which is outstanding on the date stated in the Punch List, within such reasonable time as is instructed by the Purchaser:(b) execute all work required to remedy defects or damage, before the expiry date of the Warranty Period for the Equipment.
đang được dịch, vui lòng đợi..
