1.3.1. FERRO ITEMS PROCESSING
Applied for pillar, formwork… 24h after base linearing. Use bender and cutter for processing. Attend to check to following elements:
- Clean steel.
- Chose proper steel in dimension, type and specification.
- Follow regulation when wielding.
- Make sure straight connetion of axis.
- Ensure safety thick of protection layer as regulated.
- Fllowed by standard: TCVN or equivaent standard during construction.
- Ensure fixed locate of steel pillar to reaction tanks wall so that good quality of concrete pour can be reached.
1.3.2. FORMWORK INSTALLATION
- Use fixative formwork combine with fixative wood bar, ligament not to change form of tanks during concrete pouring.
- Before couple the formwork, it is necessary to check landmark to ensure the dimension of tank. Clean the formwork, remove wood pieces before processing.
- Use precast concrete for protection layer.
- Check stable degree of casing. Only accept for accurary in limit.
1.3.3. CONCRETE POURING TO TANK’S BOTTOM AND WALL
Check landmark before operation, as well as draw plan for manpower, material, electricity net, water supply. Use good quality concrete, high mark for house and tanks builing.
- Time of concrete transport to determined tank should no later than 30min. If pour height higher than 1.5m, trough shoudh be used.
- After concrete spreding, leveling should be done.
- Spread concrete into 20-30cm thick layer for suitable dept of rammer as follows:
o After 30s at each points, slowly withdraw rammer to avoid concrete break.
o Pouring should avoid rammer to move ferro pillar.
o Do maintenance concrete after pouring.
- Follow construction standard: TCVN or others equavilant.
1.3.4. WALL BUILDING
- Determine landmark and transform material (brick, mortar…) by informed cart.
- Spread the rod to ensure the wall is flat, apply for 3 vertical line and 1 horizontal line. Mortar pulse must thick enough, stable and sticky.
- The blogs should connect with pillar by steel rod d6, a=500.
1.3.5. STEEL INGOT AND CORRUGATED IRON INSTALLATION
Use avalable corrugation iron, piece of sheet iron will be joined by specific screw.
1.3.6. COMPLETION
1. Coating
- Clean face of object before coating, spra water and check the face whether it rugged or not. If it’s too rough, smoothy is needed.
- Coating layer should be flat and sticky to avoid spongy.
2. Paving
Check height of base and inclination followed by design value before paving.
- Paving must be carried out from inside to outside, from far to near distance.
- After 24 – 48h, pulse shall be done with white cement and water. Mortar should be added eough to avoide spongy.
- In between of pulse and wall should add mortar cement.
3. Smooth
Use mortar cement 75#. Spray water and rugged face of object for better sticky. If the linear layer is right layer then cut into 10 – 15cm square. Flat and inclination of smooth face must be obeyed.
4. Well - filled
- Good in shape and dimension;
- Implement from down to up, from the begin point to the door by horizontal and vertical method.
5. Water proof
- Roof, floor of bathrooms should be dept in water in about 20days.
- Clean surface before water prrof by using brush, broom or air blower.
- Spread proof layer according to instruction.
- Surround bathroom pipes, it is needed to build a 100mm wall with conrete 200# in between of the connection.
- Between drain pipes and seno must provide matal but not plactic hopper, and should be coated with mortar to avoid leaking.
- The bottom and wall will also be coated with water proof layer.
6. Painting
- Oil painting: into steel structure. Before painting, it should polish the surface and cover with 3 layer of anti rusty paint. After installation, 3 layers of oil pain will be applied.
- Anti rusty paint must cover the whole faces of object. Only cover the next layer of pain when the previuos layer dry anough. Painting should be steady and from the top to the bottom of object. Similar to oil painting.
- After paint, one should cover the object to avoid sand, rain and other particle violence.
- Use sand paper to smooth surface of object befor apply mattie powder.
- Rolling paint: white first and the next 2 time is color painting. For the outer face should be appile with linear paint layer first.
7. Roof
Determine exact height of the roof, and ressemble plaster roof, followed by construction regulation.
8. Decoration
Apply a layer of pure cement before processing to build the connection between new and old mortar.
- Glass door with aluminum frame must followed by design requirement.
- Pump glue between glass layer for water proof.
9. Others
- Other works that not mentioned here above will be process followed by specific standard of the Nation TCVN.
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
1.3.1. FERRO ITEMS PROCESSINGApplied for pillar, formwork… 24h after base linearing. Use bender and cutter for processing. Attend to check to following elements:- Clean steel.- Chose proper steel in dimension, type and specification.- Follow regulation when wielding.- Make sure straight connetion of axis.- Ensure safety thick of protection layer as regulated.- Fllowed by standard: TCVN or equivaent standard during construction.- Ensure fixed locate of steel pillar to reaction tanks wall so that good quality of concrete pour can be reached.1.3.2. FORMWORK INSTALLATION- Use fixative formwork combine with fixative wood bar, ligament not to change form of tanks during concrete pouring.- Before couple the formwork, it is necessary to check landmark to ensure the dimension of tank. Clean the formwork, remove wood pieces before processing.- Use precast concrete for protection layer.- Check stable degree of casing. Only accept for accurary in limit.1.3.3. CONCRETE POURING TO TANK’S BOTTOM AND WALLCheck landmark before operation, as well as draw plan for manpower, material, electricity net, water supply. Use good quality concrete, high mark for house and tanks builing.- Time of concrete transport to determined tank should no later than 30min. If pour height higher than 1.5m, trough shoudh be used.- After concrete spreding, leveling should be done.- Spread concrete into 20-30cm thick layer for suitable dept of rammer as follows:o sau độ tuổi 30 tại mỗi điểm khác nhau, từ từ rút rammer để tránh phá vỡ bê tông. o Pouring nên tránh rammer để di chuyển ferro cột.o làm bảo trì bê tông sau khi đổ.-Thực hiện theo xây dựng tiêu chuẩn: TCVN hoặc những người khác equavilant. 1.3.4. TƯỜNG XÂY DỰNG-Xác định landmark và biến vật liệu (gạch, vữa...) bằng thông tin giỏ hàng. -Lan truyền thanh để đảm bảo tường là bằng phẳng, áp dụng cho 3 đường thẳng đứng và 1 đường ngang. Vữa xung phải đủ dày, ổn định và dính.-Các blog nên kết nối với cột bằng thép d6, một = 500.1.3.5. THÉP PHÔI VÀ TÔN SẮT CÀI ĐẶTSử dụng avalable tông sóng sắt, mảnh của tấm sắt sẽ được tham gia bởi cụ thể vít. 1.3.6. HOÀN THÀNH1. lớp phủ-Làm sạch khuôn mặt của đối tượng trước khi sơn, spra nước và kiểm tra mặt cho dù nó gồ ghề hay không. Nếu nó là quá thô, smoothy là cần thiết.-Lớp phủ lớp nên được bằng phẳng và dính để tránh xốp.2. mởKiểm tra chiều cao của cơ sở và độ nghiêng theo giá trị thiết kế trước khi mở.-Lát phải mang ra từ bên trong đến bên ngoài, từ xa đến gần khoảng cách.-Sau 24-48h, xung sẽ được thực hiện bằng xi măng trắng và nước. Vữa nên được thêm eough vào avoide xốp. -Ở giữa của xung và tường nên thêm vữa xi măng.3. mịnSử dụng vữa xi măng 75#. Phun nước và khuôn mặt gồ ghề của các đối tượng cho tốt hơn dính. Nếu lớp tuyến tính là đúng lớp sau đó cắt thành hình vuông 10-15cm. Phẳng và độ nghiêng của khuôn mặt mịn phải được tuân theo.4. Well - filled- Good in shape and dimension; - Implement from down to up, from the begin point to the door by horizontal and vertical method.5. Water proof- Roof, floor of bathrooms should be dept in water in about 20days.- Clean surface before water prrof by using brush, broom or air blower. - Spread proof layer according to instruction.- Surround bathroom pipes, it is needed to build a 100mm wall with conrete 200# in between of the connection.- Between drain pipes and seno must provide matal but not plactic hopper, and should be coated with mortar to avoid leaking.- The bottom and wall will also be coated with water proof layer.6. Painting- Oil painting: into steel structure. Before painting, it should polish the surface and cover with 3 layer of anti rusty paint. After installation, 3 layers of oil pain will be applied. - Anti rusty paint must cover the whole faces of object. Only cover the next layer of pain when the previuos layer dry anough. Painting should be steady and from the top to the bottom of object. Similar to oil painting. - After paint, one should cover the object to avoid sand, rain and other particle violence. - Use sand paper to smooth surface of object befor apply mattie powder.- Rolling paint: white first and the next 2 time is color painting. For the outer face should be appile with linear paint layer first. 7. RoofDetermine exact height of the roof, and ressemble plaster roof, followed by construction regulation.8. DecorationApply a layer of pure cement before processing to build the connection between new and old mortar.- Glass door with aluminum frame must followed by design requirement. - Pump glue between glass layer for water proof. 9. Others- Other works that not mentioned here above will be process followed by specific standard of the Nation TCVN.
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
1.3.1. HỢP TIÊU chế biến
Áp dụng cho các trụ cột, cốp pha ... 24h sau khi linearing cơ sở. Sử dụng uốn và cắt cho chế biến. Tham dự để kiểm tra các yếu tố sau đây:
- thép Clean.
- Lựa chọn thép thích hợp trong kích thước, loại hình và đặc điểm kỹ thuật.
- Thực hiện theo quy định khi cầm.
- Hãy chắc chắn rằng connetion thẳng của trục.
- Đảm bảo an toàn dày của lớp bảo vệ theo quy định.
- Fllowed theo tiêu chuẩn :. TCVN hoặc tiêu chuẩn equivaent trong xây dựng
- Đảm bảo cố định xác định vị trí của thép cột vào bể phản ứng bức tường để có chất lượng tốt của bê tông đổ có thể đạt được.
1.3.2. Ván khuôn LẮP ĐẶT
- Sử dụng định hình ván khuôn kết hợp với chất cố định thanh gỗ, dây chằng không thay đổi hình dạng của xe tăng trong bê tông đổ.
- Trước khi vài ván khuôn, nó là cần thiết để kiểm tra mốc để đảm bảo kích thước của bể. Làm sạch các ván khuôn, tháo miếng gỗ trước khi chế biến.
- Sử dụng bê tông đúc sẵn cho lớp bảo vệ.
- Kiểm tra độ ổn định của vỏ. Chỉ chấp nhận cho accurary trong giới hạn.
1.3.3. BÊ TÔNG đổ VỚI ĐÁY VÀ TƯỜNG TANK CỦA
Kiểm tra mốc trước khi hoạt động, cũng như kế hoạch rút ra cho nhân lực, vật liệu, lưới điện, cấp nước. Sử dụng bê tông chất lượng tốt, điểm cao cho ngôi nhà và xe tăng builing.
- Thời gian vận chuyển bê tông để xe tăng quyết tâm nên không muộn hơn 30 phút. Nếu đổ chiều cao cao hơn 1,5m, máng shoudh được sử dụng.
- Sau khi spreding bê tông, san lấp mặt bằng nên được thực hiện.
- Bê tông Spread thành lớp dày 20-30cm cho nợ phù hợp của đầm như sau:
o Sau 30 tuổi tại mỗi điểm, từ từ rút cái chày để tránh phá vỡ bê tông.
o Đổ nên tránh đầm để di chuyển cột trụ cốt thép.
o bê tông bảo dưỡng sau khi đổ.
- Thực hiện theo tiêu chuẩn xây dựng: TCVN hoặc những người khác equavilant.
1.3.4. TƯỜNG BUILDING
- Xác định mốc và biến đổi vật liệu (gạch, vữa ...) bằng xe thông tin.
- Lây lan que để đảm bảo các bức tường bằng phẳng, áp dụng cho 3 đường thẳng đứng và 1 đường ngang. Xung vữa phải đủ dày, ổn định và dính.
- Các blog nên kết nối với trụ cột bằng thép que d 6, a = 500.
1.3.5. Phôi thép và tôn SẮT LẮP ĐẶT
Sử dụng tông sóng avalable sắt, mảnh của tấm sắt sẽ được tham gia của vít cụ thể.
1.3.6. HOÀN
1. Coating
- mặt sạch của đối tượng trước khi sơn, nước spra và kiểm tra các mặt dù nó gồ ghề hay không. Nếu nó quá thô, smoothy là cần thiết.
- Lớp sơn nên được bằng phẳng và dính để tránh xốp.
2. Lát
Kiểm tra chiều cao của cơ sở và khuynh hướng tiếp theo là giá trị thiết kế trước khi lát.
- Lát phải được thực hiện từ bên trong đến bên ngoài, từ xa với khoảng cách gần.
- Sau 24 - 48 giờ, xung được làm bằng xi măng trắng và nước. Vữa nên được bổ sung eough để avoide xốp.
- Ở giữa xung và tường nên thêm vữa xi măng.
3. Mịn
Sử dụng vữa xi măng 75 #. Phun nước và khuôn mặt gồ ghề của đối tượng cho dính tốt hơn. Nếu lớp tuyến tính là lớp ngay sau đó cắt thành 10 - 15cm vuông. Nghiêng phẳng và mặt trơn phải được tuân theo.
4. Vâng - điền
- Tốt trong hình dạng và kích thước;
- Thực hiện từ dưới lên trên, từ quan điểm cho cửa bắt đầu bằng phương pháp ngang và dọc.
5. Bằng chứng nước
- mái nhà, sàn nhà tắm nên được nợ trong nước trong khoảng 20days.
- Làm sạch bề mặt trước khi prrof nước bằng cách sử dụng bàn chải, chổi hoặc máy thổi khí.
- Spread lớp bằng chứng theo hướng dẫn.
- Ống tắm Surround, nó là cần thiết để xây dựng một bức tường 100mm với conrete 200 # ở giữa của kết nối.
- Giữa đường ống cống và Seno phải cung cấp matal nhưng phễu không plactic, và phải được phủ với vữa để tránh rò rỉ.
- Đáy và tường cũng sẽ được phủ lớp chống nước .
6. Tranh
- Tranh sơn dầu: vào kết cấu thép. Trước khi sơn, cần đánh bóng bề mặt và che phủ với 3 lớp sơn chống gỉ. Sau khi cài đặt, 3 lớp của đau dầu sẽ được áp dụng.
- Sơn chống rỉ sét phải bao gồm toàn bộ khuôn mặt của đối tượng. Chỉ bao gồm các lớp tiếp theo của đau khi lớp previuos khô anough. Sơn nên được ổn định và từ trên xuống dưới cùng của đối tượng. . Tương tự như bức tranh sơn
dầu. - Sau khi sơn, ta nên bao gồm các đối tượng để tránh cát, mưa và bạo lực hạt
khác. - Sử dụng giấy nhám mịn bề mặt của đối tượng trước khi lên áp dụng bột Mattie
- sơn lăn: trắng đầu tiên và 2 lần sau là sơn màu. Đối với mặt ngoài nên appile với tuyến tính lớp sơn đầu tiên.
7. Roof
Xác định chiều cao chính xác của mái nhà, mái nhà và thạch cao ressemble, tiếp theo quy định xây dựng.
8. Trang trí
Thoa một lớp xi măng nguyên chất trước khi xử lý để xây dựng các kết nối giữa vữa mới và cũ.
- Kính cửa với khung nhôm phải tiếp theo yêu cầu thiết kế.
- Keo bơm giữa lớp kính chống nước.
9. Khác
- Các công việc khác mà không đề cập ở đây trên sẽ được trình tiếp theo tiêu chuẩn cụ thể của quốc gia TCVN.
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2025 I Love Translation. All reserved.

E-mail: