To begin, the cash flow of a project must be estimated and broken down into periods. These cash flows are then reduced by their present value factor to reflect the discounting. With the assumption of a large cash outflow to begin the project, future discounted cash flows are net against the initial outflow. The discounted payback period is calculated when the inflows equal the outflows.
đang được dịch, vui lòng đợi..