Masonry grout is the bridge between the masonry unit andreinforcing st dịch - Masonry grout is the bridge between the masonry unit andreinforcing st Việt làm thế nào để nói

Masonry grout is the bridge between

Masonry grout is the bridge between the masonry unit and
reinforcing steel that makes masonry work. It is important for
the grout to completely fill the cells, which are usually
restricted, therefore, an 8 to 11 inch slump is mandatory for
proper flow. Immediately, the excess water bleeds into the unit,
thereby allowing the grout to hydrate in the normal manner. It
is undesirable to place the grout too dry and allow the grout to
become caught in the congested areas causing voids below.
Proper moisture content, consolidation and reconsolidation all
contribute to making the grout a full and homogeneous
masonry system.
In a sense, transit mixed grout mechanically pumped is
somewhat self-checking. If the cement content of the masonry
grout is less than 6.5 sack equivalent, the grout will frequently
plug the hose. A 6.5 cement content far exceeds the minimum
code required grout compressive strength of 2,000 psi.
12.2.4.3 Construction
41. Verify that all head, bed and wall joints are:................
(a) Watertight (Holes filled).......................................
(b) Correct size...........................................................
(c) Properly filled with mortar....................................
(d) Buttered where required........................................
42. Verify joint size and type of joints are as required.......
43. Check head and bed joints for:..................................
(a) Proper size............................................................
(b) Complete filling of head joints as required...........
(c) Filling of end joints with mortar............................
44. Check joints where fresh masonry is joined to set
(previously laid) masonry............................................
45. Check reinforced hollow unit masonry for:.................
(a) Vertical alignment and continuity of cells.............
(b) Lapping.................................................................
(c) Leakage of grout...................................................
(d) Cleanout openings for pours over 5 feet................
(e) Overhanging mortar..............................................
(f) Sealing of cleanout openings................................
(g) Position/securing of reinforcement.......................
(h) Control joint location and reinforcement..............
(i) Requirements when work is stopped for more
than one hour.........................................................
46. Are prism specimens required for verification
of f’m?..........................................................................
47. Were prism specimens made for testing?.....................
48. Is masonry observed at proper distance for
acceptance?.................................................................
Correct placement of reinforcement is essential for the
proper performance of structural masonry. Since the
reinforcement is fully encased in the grout it is essential that the
inspector understand that the location of the reinforcement will
determine structural performance and that the grout must
completely surround the reinforcement for an effective masonry
system.
In order to verify the structural integrity of the masonry, the
code provides for verification of the compressive strength of
masonry. One appropriate method is through construction of
masonry wall assemblages, or prisms, with subsequent testing
to determine the ultimate test compressive strength. Since the
prism specimens are handled and physically transported to the
lab, the standard is very specific on handling, curing and
testing procedures. Failure to follow the guidelines can
negatively impact the test results.
12.2.5 CONSTRUCTION DETAILS
49. Does contractor use a string line?................................
50. Does contractor periodically check plumbness
of units?.......................................................................
51. Are industry standard tolerances implemented?..........
52. Observe hot and cold weather construction and
protection requirements...............................................
53. Check unprotected steel supporting members for:.......
(a) Correct location of mechanical installation
supports.................................................................
(b) Size and location of bolts and connections............
(c) Size and spacing of bracing connections...............
(d) Size and alignment of connection holes................
(e) Shims and drypacking...........................................
(f) Location and size of stiffeners..............................
(g) Size and alignment of base plates..........................
Although the Code does not address means and methods of
construction, it is appropriate for the contractor to use the best
methods available for quality installation. This includes laying
the units to a string line and a periodic check of the masonry to
be sure that the installed work is within industry tolerances.
54. Check the following points of inspection of bearing
on solid masonry..........................................................
(a) Suitability of bearing masonry..............................
(b) Size of bearing masonry........................................
(c) Size, length, placement and embedment of
connectors in masonry..........................................
(d) Location of bolt ties..............................................
55. Verify proper sill material and check for
anchorage of supporting members to footings.............
56. Verify the following points in checking anchoring
of wood floor joists to supporting masonry members..
(a) Required size of ledges.........................................
(b) Required size, spacing and length of bolts
and joist anchors...................................................
57. Where wood floor joists are parallel to wall,
check for:.....................................................................
(a) Placement of required blocking............................
(b) Type of anchors required...................................
(c) Use of proper connections to anchors...................
58. Verify the following in inspecting floor joists tying
to a masonry wall:........................................................
(a) Required size, spacing and bearing of joints.........
(b) Required air space around joists...........................
(c) Required bridging and/or blocking.......................
(d) Connection to ledger.............................................
(e) Required connectors for anchors...........................
(f) Required anchors..................................................
59. Verify the following points in the inspection of a
masonry building where fire-resistive floors are
required:......................................................................
(a) Proper material for fire resistance.........................
(b) Required thickness of floor slab............................
(c) Required supports.................................................
(d) Required reinforcement........................................
(e) Required time for supports and forms to
remain in place for concrete floors........................
Many of the above items relate to the interface of masonry
with other trades. Consideration of these items is appropriate
and it may be necessary for the masonry inspector to coordinate
with others to verify the compatibility with other trades.
60. Construction joints and control joints are located
and provided as indicated or required..........................
The issue of control joints is important to masonry
construction. Concrete masonry, like any cementitious product
shrinks, and subsequently cracks. Control joints are installed
for the purpose of focusing cracks into a specific location where
a caulk, or sealant, is applied. This enhances the overall
performance of masonry. Control joints should be specified for
type and location by the designer based on published industry
standards.
61. Weep holes are provided, if required...........................
Weep holes can be installed in drainage systems where
there is a vertical void for the water to gravitate downward, and
subsequently travel to the exterior of the masonry. Installation
of weep holes permits the water to follow the path of least
resistance.
62. Cover the following points in checking for the
height of masonry building:.........................................
(a) Approved materials...............................................
(b) Placement and spacing of reinforcement..............
(c) Correct grouting procedure...................................
63. Verify the following when inspecting chases:.............
(a) Location and spacing on approved plans..............
(b) Purpose.................................................................
(c) Maximum permitted depth....................................
(d) No reduction of the required strength and for
resistance of the wall.............................................
64. Check bearing walls for:..............................................
(a) End support...........................................................
(b) Footings................................................................
(c) Thickness of walls.................................................
(d) Bond beams..........................................................
(e) Materials used.......................................................
(f) Joints.....................................................................
(g) Reinforcing steel...................................................
(h) Grout.....................................................................
(i) Shoring or bracing (if required)............................
(j) Anchorage.............................................................
65. Inspect non-loadbearing walls for:..............................
(a) Location, height and thickness of walls................
(b) Approved materials..........................
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
Gạch vữa là cầu nối giữa các đơn vị xây dựng vàtăng cường thép mà làm cho xây dựng làm việc. Nó là quan trọng đối vớivữa để hoàn toàn lấp đầy các tế bào, thườnghạn chế, do đó, một sụt giảm 8-11 inch là bắt buộc đối vớidòng chảy thích hợp. Ngay lập tức, các nước dư thừa chảy máu vào các đơn vị,do đó cho phép vữa để hydrat cách bình thường. Nólà không mong muốn để đặt vữa quá khô và cho phép vữa đểtrở thành bắt gặp trong các lĩnh vực tắc nghẽn gây ra khoảng trống bên dưới.Nội dung độ ẩm thích hợp, củng cố và reconsolidation tất cảgóp phần làm cho vữa một đầy đủ và đồng nhấtxây dựng hệ thống.Trong ý nghĩa một, quá cảnh hỗn hợp vữa máy móc bơm làhơi tự kiểm tra. Nếu nội dung xi măng xây dựngvữa là ít hơn 6,5 bao tương đương, vữa sẽ thường xuyêncắm vòi. Một nội dung 6.5 xi măng vượt xa tối thiểuMã yêu cầu vữa cường độ nén của 2.000 psi.12.2.4.3 xây dựng41. xác minh rằng tất cả đầu, giường và tường khớp là:...(a) Watertight (lỗ đầy)...(b) Correct size...........................................................(c) đúng đầy vữa...(d) buttered nơi yêu cầu...42. xác minh chung kích thước và loại khớp được yêu cầu là...43. kiểm tra đầu và giường khớp cho:...(a) Proper size............................................................(b) hoàn thành điền khớp đầu theo yêu cầu...(c) làm đầy kết thúc khớp với vữa...44. kiểm tra khớp nơi tươi xây dựng tham gia để thiết lậpxây dựng (trước đây đặt)...45. kiểm tra gia cố rỗng đơn vị xây dựng cho:...(a) dọc và liên tục của các tế bào...(b) Lapping.................................................................(c) rò rỉ vữa...(d) Cleanout khi đổ hơn 5 feet...(e) overhanging vữa...(f) niêm phong của cleanout dụng...(g) vị trí/bảo vệ cốt thép mềm...(h) kiểm soát vị trí chung và tăng cường...(i) yêu cầu khi làm việc dừng lại để biết thêmthan one hour.........................................................46. mẫu vật lăng kính yêu cầu để xác minhof f’m?..........................................................................47. đã lăng kính mẫu làm cho thử nghiệm...48. là quan sát thấy ở các khoảng cách thích hợp cho xây dựngacceptance?.................................................................Các vị trí chính xác của tăng cường là điều cần thiết cho cáchiệu suất thích hợp của cấu trúc xây dựng. Kể từ khi cáctăng cường hoàn toàn bọc trong vữa nó là điều cần thiết mà cácthanh tra hiểu rằng vị trí tăng cường sẽxác định cấu trúc hiệu suất và vữa phảihoàn toàn bao quanh tăng cường cho một xây dựng có hiệu quảHệ thống.Để xác minh sự toàn vẹn cấu trúc của xây dựng, cácMã cung cấp cho việc kiểm chứng cường độ nén củaxây dựng. Một trong những phương pháp thích hợp là thông qua xây dựngxây dựng bức tường tập, hoặc lăng kính, với thử nghiệm tiếp theođể xác định cường độ nén thử nghiệm cuối cùng. Kể từ khi cácLăng kính mẫu vật được xử lý và thể chất vận chuyển đến cácPhòng thí nghiệm, các tiêu chuẩn là rất cụ thể về xử lý, chữa vàkiểm tra thủ tục. Sự thất bại để thực hiện theo các hướng dẫn có thểtiêu cực ảnh hưởng đến kết quả kiểm tra.12.2.5 XÂY DỰNG CHI TIẾT49. không nhà thầu sử dụng một đường dây...50. không nhà thầu theo định kỳ kiểm tra plumbnessof units?.......................................................................51. là ngành công nghiệp tiêu chuẩn dung sai thực hiện...52. quan sát xây dựng thời tiết nóng và lạnh vàyêu cầu bảo vệ...53. kiểm tra không bảo vệ thép thành viên hỗ trợ cho:...(a) chính xác vị trí cài đặt cơ khísupports.................................................................(b) kích thước và vị trí của Bu lông và kết nối...(c) kích thước và khoảng cách của kết lại cho vưng kết nối...(d) kích thước và sự liên kết của kết nối lỗ...(e) Shims và drypacking...(f) vị trí và kích thước của stiffeners...(g) kích thước và sự liên kết của tấm cơ sở...Mặc dù các mã không địa chỉ phương tiện và phương phápxây dựng, nó là thích hợp cho các nhà thầu để sử dụng tốt nhấtphương pháp có sẵn cho cài đặt chất lượng. Điều này bao gồm lắp đặtCác đơn vị để một chuỗi và một kiểm tra định kỳ của masonry đểHãy chắc chắn rằng việc cài đặt là trong ngành công nghiệp dung sai.54. kiểm tra các điểm sau đây kiểm tra của vòng bion solid masonry..........................................................(a) phù hợp mang xây dựng...(b) kích thước mang xây dựng...(c) kích thước, chiều dài, vị trí và embedment củakết nối trong xây dựng...(d) vị trí của bolt mối quan hệ...55. xác minh tài liệu thích hợp sill và kiểm traAnchorage hỗ trợ các thành viên để footings...56. xác minh những điểm sau đây trong việc kiểm tra thả neocủa joists sàn gỗ để hỗ trợ xây dựng thành viên...(a) yêu cầu kích thước của gờ...(b) yêu cầu kích thước, khoảng cách và độ dài của Bu lôngvà joist neo...57. Where wood floor joists are parallel to wall,check for:.....................................................................(a) Placement of required blocking............................(b) Type of anchors required...................................(c) Use of proper connections to anchors...................58. Verify the following in inspecting floor joists tyingto a masonry wall:........................................................(a) Required size, spacing and bearing of joints.........(b) Required air space around joists...........................(c) Required bridging and/or blocking.......................(d) Connection to ledger.............................................(e) Required connectors for anchors...........................(f) Required anchors..................................................59. Verify the following points in the inspection of amasonry building where fire-resistive floors arerequired:......................................................................(a) Proper material for fire resistance.........................(b) Required thickness of floor slab............................(c) Required supports.................................................(d) Required reinforcement........................................(e) Required time for supports and forms toremain in place for concrete floors........................Many of the above items relate to the interface of masonrywith other trades. Consideration of these items is appropriateand it may be necessary for the masonry inspector to coordinatewith others to verify the compatibility with other trades.60. Construction joints and control joints are locatedand provided as indicated or required..........................The issue of control joints is important to masonryconstruction. Concrete masonry, like any cementitious productshrinks, and subsequently cracks. Control joints are installedfor the purpose of focusing cracks into a specific location wherea caulk, or sealant, is applied. This enhances the overallperformance of masonry. Control joints should be specified fortype and location by the designer based on published industrystandards.61. Weep holes are provided, if required...........................Weep holes can be installed in drainage systems wherethere is a vertical void for the water to gravitate downward, andsubsequently travel to the exterior of the masonry. Installationof weep holes permits the water to follow the path of leastresistance.62. Cover the following points in checking for theheight of masonry building:.........................................(a) Approved materials...............................................(b) Placement and spacing of reinforcement..............(c) Correct grouting procedure...................................63. Verify the following when inspecting chases:.............(a) Location and spacing on approved plans..............(b) Purpose.................................................................(c) Maximum permitted depth....................................(d) No reduction of the required strength and forresistance of the wall.............................................64. Check bearing walls for:..............................................(a) End support...........................................................(b) Footings................................................................(c) Thickness of walls.................................................(d) Bond beams..........................................................(e) Materials used.......................................................(f) Joints.....................................................................(g) Reinforcing steel...................................................(h) Grout.....................................................................(i) Shoring or bracing (if required)............................(j) Anchorage.............................................................65. Inspect non-loadbearing walls for:..............................(a) Location, height and thickness of walls................(b) Approved materials..........................
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
Vữa xây là cầu nối giữa các đơn vị nề và
cốt thép mà làm cho công việc nề. Điều quan trọng là cho
vữa hoàn toàn điền vào các tế bào, mà thường
bị hạn chế, do đó, một 8-11 inch độ sụt là bắt buộc đối với
lưu lượng thích hợp. Ngay lập tức, các nước thừa chảy vào các đơn vị,
do đó cho phép vữa để hydrate theo cách thông thường. Đó
là mong muốn để đặt vữa quá khô và cho phép vữa để
trở thành bắt trong khu vực tắc nghẽn gây ra khoảng trống bên dưới.
Độ ẩm đúng nội dung, củng cố và reconsolidation tất cả
góp phần làm cho vữa một đầy đủ và đồng nhất
hệ thống nề.
Trong một nghĩa nào đó, quá cảnh trộn vữa bơm cơ học là
hơi tự kiểm tra. Nếu hàm lượng xi măng của khối xây
vữa là ít hơn 6,5 bao tải tương đương, vữa sẽ thường xuyên
cắm ống. Một nội dung 6.5 xi măng vượt xa mức tối thiểu
mã vữa yêu cầu cường độ nén của 2.000 psi.
12.2.4.3 Xây dựng
41. Xác minh rằng tất cả các khớp đầu, giường và bức tường là: ................
(a) kín nước (Holes điền) ............... ........................
(b) kích thước đúng ..................... ......................................
(c) đúng đầy vữa ..... ...............................
(d) bơ nếu cần ............. ...........................
42. Xác minh kích thước chung và loại khớp theo yêu cầu .......
43. Kiểm tra đầu và khớp giường cho: ..................................
(a) kích thước thích hợp .... .................................................. ......
(b) điền đầy đủ của các khớp xương đầu theo yêu cầu ...........
(c) Điền các khớp cuối vữa .............. ..............
44. Kiểm tra khớp nơi nề tươi được gia nhập vào thiết lập
(đặt trước) nề .................................... ........
45. Kiểm tra đơn vị cốt thép rỗng nề cho: .................
(a) Vertical alignment và tính liên tục của các tế bào .............
(b) Lapping .................................................. ...............
(c) Rò rỉ vữa ............................. ......................
(d) mở cleanout cho đổ hơn 5 feet ................
(e ) vữa nhô ..............................................
( f) Niêm phong hở cleanout ................................
(g) Chức vụ / bảo vệ cốt thép .... ...................
(h) Kiểm soát vị trí khớp và tăng cường ..............
(i) Yêu cầu khi công việc bị dừng lại cho nhiều
hơn một giờ .............................................. ...........
46. Là mẫu vật lăng kính cần thiết để xác minh
của f'm .......................................? ...................................
47. Là mẫu lăng kính làm để thử nghiệm? .....................
48. Là nề quan sát ở khoảng cách thích hợp cho
sự chấp nhận .........................................? ........................
vị trí đúng của cốt thép là cần thiết cho việc
thực hiện đúng nề về cơ cấu. Kể từ khi
gia cố hoàn toàn bọc trong vữa nó là điều cần thiết mà các
thanh tra viên hiểu rằng vị trí của quân tiếp viện sẽ
xác định thực hiện cơ cấu và vữa phải
hoàn toàn bao quanh cốt thép cho một nề hiệu quả
hệ thống.
Để xác minh tính toàn vẹn cấu trúc của xây dựng, các
mã cung cấp để xác minh về cường độ nén của
vữa. Một phương pháp thích hợp là thông qua xây dựng các
tổ hợp tường nề, hoặc hình lăng trụ, với các thử nghiệm tiếp theo
để xác định các thử nghiệm cường độ nén tối thượng. Kể từ khi
mẫu lăng kính được xử lý và thể chất vận chuyển đến các
phòng thí nghiệm, tiêu chuẩn là rất cụ thể về việc xử lý, bảo dưỡng và
kiểm tra các thủ tục. Việc không tuân theo các hướng dẫn có thể
ảnh hưởng xấu đến kết quả xét nghiệm.
12.2.5 XÂY DỰNG CHI TIẾT
49. Có nhà thầu sử dụng một ................................ dòng chuỗi?
50. Có nhà thầu kiểm tra định kỳ plumbness
của đơn vị? .......................................... .............................
51. Được dung sai tiêu chuẩn công nghiệp thực hiện? ..........
52. Quan sát xây dựng và thời tiết nóng và lạnh
yêu cầu bảo vệ ......................................... ......
53. Kiểm tra các thành viên thép không được bảo vệ hỗ trợ cho: .......
(a) đúng vị trí lắp đặt cơ khí
hỗ trợ ........................... ......................................
(b) Kích thước và vị trí của bu lông và các kết nối .. ..........
(c) Kích thước và khoảng cách của các kết nối giằng ...............
(d) Kích thước và sự liên kết của các lỗ kết nối ....... .........
(e) miếng chêm và drypacking ................................... ........
(f) Vị trí và kích thước của các nẹp gia cường ..............................
(g) Kích thước và sắp xếp các tấm cơ sở ..........................
Mặc dù luật không đề cập đến các phương tiện và phương pháp
xây dựng, nó là thích hợp cho các nhà thầu để sử dụng tốt nhất
và phương thức để cài đặt chất lượng. Điều này bao gồm đặt
các đơn vị với một đường dây chuỗi và kiểm tra định kỳ của khối xây để
đảm bảo rằng công việc cài đặt là với sai số ngành công nghiệp.
54. Kiểm tra các điểm sau thanh tra của mang
về rắn nề ....................................... ...................
(a) Sự phù hợp của nề mang ........................ ......
(b) Kích thước của nề mang ..................................... ...
(c) Kích thước, chiều dài, vị trí và embedment của
kết nối trong xây ................................. .........
(d) Vị trí của các mối quan hệ bulông .................................. ............
55. Xác minh tài liệu sill thích hợp và kiểm tra
neo đậu của các thành viên hỗ trợ để móng .............
56. Xác minh các điểm sau đây trong việc kiểm tra neo
của dầm sàn gỗ để hỗ trợ các thành viên nề ..
(a) kích thước yêu cầu của gờ .......................... ...............
(b) kích thước yêu cầu, khoảng cách và chiều dài của bu lông
và neo dầm ..................... ..............................
57. Trường hợp dầm sàn gỗ song song với tường,
kiểm tra: ...................................... ...............................
(a) Vị trí của chặn yêu cầu ............ ................
(b) Loại neo cần ........................... ........
(c) Sử dụng kết nối thích hợp để neo ...................
58. Xác minh sau đây trong việc kiểm tra dầm sàn buộc
vào một bức tường nề: ..................................... ...................
(a) yêu cầu kích thước, khoảng cách và chịu lực của khớp .........
(b) không phận buộc xung quanh dầm ... ........................
(c) bắc cầu bắt buộc và / hoặc ngăn chặn ................. ......
(d) Kết nối với Ledger ...................................... .......
(e) kết nối cần thiết cho việc neo ...........................
(f) neo buộc .... ..............................................
59. Xác minh các điểm sau đây trong việc kiểm tra của một
tòa nhà gạch, nơi sàn chống cháy được
yêu cầu: ............................... .......................................
(a) các tài liệu thích hợp cho khả năng chống cháy ... ......................
(b) độ dày cần thiết của bản sàn .................... ........
(c) Yêu cầu hỗ trợ ..................................... ............
(d) cố buộc ................................. .......
(e) Bắt buộc thời gian để hỗ trợ và các hình thức để
duy trì tại chỗ cho sàn bê tông ........................
Nhiều mặt hàng trên liên quan đến giao diện của nề
với các ngành nghề khác. Xem xét của các mặt hàng này là thích hợp
và nó có thể là cần thiết cho việc thanh tra nề để phối hợp
với những người khác để xác minh sự phù hợp với ngành nghề khác.
60. Mối nối thi công và khớp kiểm soát được đặt
và cung cấp như được chỉ ra hoặc yêu cầu ..........................
Các vấn đề về khớp kiểm soát là rất quan trọng để nề
xây dựng. Khối xây bê tông, giống như bất kỳ sản phẩm xi măng
co lại, và sau đó các vết nứt. Khớp điều khiển được cài đặt
với mục đích tập trung vào các vết nứt một địa điểm cụ thể nơi
một bít, hoặc sealant, được áp dụng. Điều này giúp tăng cường tổng thể
hiệu suất của nề. Khớp kiểm soát nên được quy định cho
loại và vị trí của nhà thiết kế dựa trên ngành công nghiệp xuất bản
tiêu chuẩn.
61. Weep lỗ được cung cấp, nếu có yêu cầu ...........................
khóc lỗ có thể được cài đặt trong hệ thống thoát nước, nơi
có một khoảng trống dọc cho các nước bị hút xuống, và
sau đó đi vào bên ngoài của khối xây. Lắp đặt
các lỗ khóc cho phép các nước đi theo con đường của ít nhất là
kháng chiến.
62. Bao gồm những điểm sau đây trong kiểm tra cho
chiều cao của tòa nhà nề: ..................................... ....
(a) Nguyên liệu được phê duyệt ......................................... ......
(b) Vị trí và khoảng cách cốt thép ..............
(c) Quy trình phun vữa đúng ................ ...................
63. Xác minh sau khi kiểm tra các cuộc rượt đuổi: .............
(a) Vị trí và khoảng cách về các kế hoạch đã được phê duyệt ..............
(b) Mục đích ... .................................................. ............
(c) Tối đa độ sâu được phép ................................ ....
(d) Không giảm sức mạnh cần thiết và cho
sức đề kháng của tường ............................... ..............
64. Kiểm tra bức tường chịu lực cho: ............................................. .
(a) hỗ trợ End ............................................ ...............
(b) móng ............................... .................................
(c) Độ dày của tường ........... ......................................
(d) Bond dầm ....... .................................................. .
(e) Vật liệu sử dụng ............................................ ...........
(f) Khớp ................................... ..................................
(g) Tăng cường thép ........... ........................................
(h) Grout ...... .................................................. .............
(i) củng cố hoặc giằng (nếu có yêu cầu) ........................... .
(j) Anchorage ............................................. ................
65. Kiểm tra bức tường không chịu tải cho: ..............................
(a) Vị trí, chiều cao và độ dày của bức tường ... .............
(b) Các vật liệu được chấp thuận ..........................
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2025 I Love Translation. All reserved.

E-mail: