CONSTRUCTION MANAGERSITE MANAGERposition the bamboo stakes to determine the land of mud are denuded after sand pumpposition the bamboo stakes to determine the organic soil volume are taken out of site after pumping sandPROCEED TO PUMP SAND INTO THE AREA OUTSIDE THE TRACKBED IN ORDER ON A DRAW (PRIORITY ROUTES TO PUMP RELIEF BARGES AS NEEDED)CAT PUMPS IN CONDUCTING OUT AREA UNDER WAY FOUNDATION ORDER IN DRAWING (PRIORITY LINES PUMPS FOR RELEASING THE NECESSARY barges) volumePROCEED TO PUMP SAND INTO THE AREA OUTSIDE THE ROAD (PRIORITY PUMPING SAND AT THE ROAD AREA)TYPICAL CROSS-SECTIONTHE SEQUENCE OF CONSTRUCTION SAND PUMP IN ADDITION TO THE BACKGROUND AREA OF THE ROADSEQUENCEvolume CONSTRUCTION MEASURESMEASURES