The intermittent blowdown piping (10HAD22BR001) will be used for control the drum water quality if the continuous blowdown can not satisfy from manifold header (10HAD60AC001) which collects the water from 4 downcomers. The continuous blown down and intermittent blowdown system can ensure totally 5% BMCR capacity per contract requirement.
đang được dịch, vui lòng đợi..
