Organize to unpack and check the goods as soon as possible after its arrival. Sign to confirm together with the client if no problem is found. If the ownership of the goods is transferred to the client after unpacking as stipulated in the contract, the corresponding responsibility of storing the goods is transferred to the client at the same time. If the contract doesn’t prescribe that the ownership of the goods should be transferred to the client and before the goods are handed over, the project manager should take the responsibility of storage and take necessary storage measures after negotiation with the client, and both parties can negotiate about regulations of goods storage if necessary and abide by them.
đang được dịch, vui lòng đợi..
