SAFETY CONSIDERATIONS: N/A YES “X” IF ITEM IS IN PLAN FURTHER REVIEW ASSIGNED TO ACTION NEEDED: PLACE AN “X” IN COLUMN #4 WHEN COMPLETE AND INCLUDED IN PLAN
Will the location of underground utilities be necessary?
Will soil analysis be necessary to determine soil stability?
Will there be excavations more than 5 feet (1.5 meters) deep requiring shoring, sloping, or benching?
Will there be scaffold requirements (material on site or subcontractor)?
Personnel lift equipment needed?
Need for fall protection (safety nets, temporary flooring, life lines)?
Working in a confined space (watch/rescue personnel and equipment needed)?
Atmosphere gas monitoring instruments needed (O2, LEL, CO, H2S, other)?
Work involving leaded paint disturbances (survey, abatement, personal protective equipment [PPE], and so on)?
Work involving disturbance of asbestos-containing materials (abatement)?
Need for hazardous waste collection, packaging, and disposal?
Work involving hazardous material requiring special PPE or equipment?
Work on plant-recognized hazardous or highly hazardous systems?
Work requiring respirators or special breathing air system?
Hot work requiring dedicated fire watch or full isolation of work area?
Special plant permits needed and/or dual signatures required?
Lockout/tagout of equipment or systems (piping, electrical, pneumatic, and so on)?
Heavy, difficult, or otherwise critical lifts (helicopter, crane, and so on)?
Equipment in proximity of overhead high-voltage lines?
Work in or around high-voltage transformers, substations, and so on?
Work involving a radioactive source (gamma gauge, x-ray welds, and so on)?
Work requiring introduction of new chemical (chemical clearance, Material Safety Data Sheets [MSDSs])?
Special safety equipment needed for work over water?
Special government permits or unique safety training required?
Does the work involve demolition of systems, buildings, or structures?
Does the work involve or affect railway access to plant?
Will the project produce unsafe air, water, or sewer emissions?
Are there changes in fire protection equipment (sprinklers, vents, doors, and so on)?
Special security personnel or additional fencing required?
Has project been reviewed and approved by plant risk review team?
Does the department safety committee need to know/evaluate the work?

Signature:
Date:

0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
Project Planning Safety Assessment FormJOB NUMBER: PROJECT PLANNING SAFETY ASSESSMENT SAFETY REVIEWED BY:LOCATION: PREPARED BY: DATE:SAFETY CONSIDERATIONS: N/A YES “X” IF ITEM IS IN PLAN FURTHER REVIEW ASSIGNED TO ACTION NEEDED: PLACE AN “X” IN COLUMN #4 WHEN COMPLETE AND INCLUDED IN PLANWill the location of underground utilities be necessary? Will soil analysis be necessary to determine soil stability? Will there be excavations more than 5 feet (1.5 meters) deep requiring shoring, sloping, or benching? Will there be scaffold requirements (material on site or subcontractor)? Personnel lift equipment needed? Need for fall protection (safety nets, temporary flooring, life lines)? Working in a confined space (watch/rescue personnel and equipment needed)? Atmosphere gas monitoring instruments needed (O2, LEL, CO, H2S, other)? Work involving leaded paint disturbances (survey, abatement, personal protective equipment [PPE], and so on)? Work involving disturbance of asbestos-containing materials (abatement)? Need for hazardous waste collection, packaging, and disposal? Work involving hazardous material requiring special PPE or equipment? Work on plant-recognized hazardous or highly hazardous systems? Work requiring respirators or special breathing air system? Hot work requiring dedicated fire watch or full isolation of work area? Special plant permits needed and/or dual signatures required? Lockout/tagout of equipment or systems (piping, electrical, pneumatic, and so on)? Heavy, difficult, or otherwise critical lifts (helicopter, crane, and so on)? Equipment in proximity of overhead high-voltage lines? Work in or around high-voltage transformers, substations, and so on? Work involving a radioactive source (gamma gauge, x-ray welds, and so on)? Work requiring introduction of new chemical (chemical clearance, Material Safety Data Sheets [MSDSs])? Special safety equipment needed for work over water? Special government permits or unique safety training required? Does the work involve demolition of systems, buildings, or structures? Does the work involve or affect railway access to plant? Will the project produce unsafe air, water, or sewer emissions? Are there changes in fire protection equipment (sprinklers, vents, doors, and so on)? Special security personnel or additional fencing required? Has project been reviewed and approved by plant risk review team? Does the department safety committee need to know/evaluate the work? Signature: Date:
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
Mẫu đánh giá an toàn Kế hoạch dự án VIỆC SỐ: DỰ ÁN QUY HOẠCH AN TOÀN ĐÁNH GIÁ AN TOÀN Đánh giá bởi: VỊ TRÍ: BÁO CÁO CỦA: NGÀY: XEM XÉT AN TOÀN: N / A YES "X" NẾU ITEM TRONG KẾ HOẠCH ĐÁNH GIÁ THÊM GIAO HÀNH ĐỘNG CẦN: NƠI AN "X" tRÊN cỘT # 4 KHI HOÀN THÀNH VÀ BAO GỒM BÊN tRONG KẾ HOẠCH có vị trí của các tiện ích ngầm là cần thiết? phân tích đất Will là cần thiết để xác định sự ổn định đất? sẽ có cuộc khai quật hơn 5 feet (1,5 mét) sâu đòi hỏi phải chống đỡ, dốc, hoặc benching? sẽ có yêu cầu giàn giáo (tài liệu trên trang web hoặc nhà thầu phụ)? cán nhấc thiết bị cần thiết? cần bảo vệ mùa thu (lưới an toàn, sàn tạm thời, dòng đời)? Làm việc trong một không gian hạn chế (xem / nhân viên cứu hộ và thiết bị cần thiết)? khí Atmosphere công cụ giám sát cần thiết (O2, LEL, CO, H2S, khác)? Công việc liên quan đến rối loạn chì sơn (khảo sát, xử lý chất thải, thiết bị bảo hộ cá nhân [PPE], vv)? Công việc liên quan đến sự xáo trộn của các vật liệu có chứa amiăng (giảm)? cần cho bộ sưu tập độc hại thải, bao bì, và xử lý? Làm việc liên quan đến vật liệu nguy hiểm đòi hỏi PPE hoặc thiết bị đặc biệt? Làm việc trên các hệ thống độc hại, nguy hại cao thực vật được công nhận? Làm việc đòi hỏi nạ hoặc hệ thống khí thở đặc biệt? công việc Hot cần xem lửa chuyên dụng hoặc cách ly đầy khu vực làm việc? giấy phép cây trồng đặc cần thiết và / hoặc chữ ký kép yêu cầu? Logout / tagout của thiết bị hoặc hệ thống (đường ống, điện, khí nén, vv)? nặng, khó khăn, hoặc thang máy nếu không quan trọng (máy bay trực thăng, cần cẩu, vv) ? Thiết bị ở gần các đường điện cao áp trên không? Làm việc trong hoặc xung quanh cao áp máy biến áp, trạm biến áp, và như vậy? Làm việc liên quan đến nguồn phóng xạ (mối hàn đo gamma, x-ray, vv)? công việc đòi hỏi giới thiệu mới hóa học (giải phóng mặt bằng hóa chất, dữ liệu an toàn vật liệu [MSDS])? thiết bị đặc biệt an toàn cần thiết cho công việc trong nước? giấy phép của chính phủ đặc biệt hoặc huấn luyện an toàn duy nhất bắt buộc? Có công việc liên quan đến việc phá hủy các hệ thống, các tòa nhà, hoặc cấu trúc? Có công việc liên quan đến hoặc ảnh hưởng đến truy cập đường sắt để trồng? dự án có sản xuất khí thải, nước, hoặc cống không an toàn? có thay đổi trong các thiết bị phòng cháy chữa cháy (vòi phun nước, thông gió, cửa ra vào, và như vậy)? nhân viên an ninh đặc biệt hoặc hàng rào bổ sung cần thiết? có dự án được xem xét ? và nhóm đánh giá nguy cơ nhà máy đã được phê duyệt Liệu ủy ban an toàn bộ phận cần biết / đánh giá công việc? Chữ ký: ngày:








































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2025 I Love Translation. All reserved.

E-mail: