There are two cases:- Control under rotation on the control box.Do soundproof box for the crushing chamber, control box for sound insulation on the outside of the box. However, soundproof box should have the following requirements:+ the operation when opening the ball and sample of mill out. (unlike the ball mill lab of cement plants )Cleaning when grind 2 different samples.- Control over time (you can start grinding mill from outside the room)we are set up rotation is maximum and put electrical systems outside the grinding room to install the machine uptime. So just to build soundproof wall vacuum sealed and ventilator to the ball mill
đang được dịch, vui lòng đợi..
