There are two berths and two loaders at the port. An uninterrupted iro dịch - There are two berths and two loaders at the port. An uninterrupted iro Việt làm thế nào để nói

There are two berths and two loader

There are two berths and two loaders at the port. An uninterrupted iron ore supply arrives at the port from a nearby mine. Whenever there is only one ship at the berths (only one berth is busy), both loaders load the ship together in half the time. However, as soon as another ship arrives at the empty berth, one of the loaders starts working on the new ship. In this case, the current ship continues its loading with only one loader. The loaders are identical and their rate of loading is 2000 tons per hour. Henc e, the loadi ng rate becom es 4000 tons per hour when both loader s wor k on the same ship. Ass ume no tim e is invol ved in shifting loaders. Once a ship is loaded at a berth , it reli nquishes that berth (and the loader ), and then reques ts tug boat service and wai ts until the tug boat arrives. Since there is on ly one tug boat, it does not matter whether it waits at the berth and then relinquis hes the berth after the tug boat arrives or it releases it first and wai ts in a different area. The tug boat tows it away to the offshore an chorage , from where the boat de parts with its iron ore for its destinati on. Higher prior ity is given to departing vessel s in seizing the tug boat. Port Las far does not expe rience tida l activity or storms or any other stopp ages.
a. Develop an Arena model for Port Lasfar, and simulat e it for 1 year (8760 hours) .
b. Estimate the following statistics:
 Berth and ship loader utilization
 Average ship port time
 Average number of ships at the anchorage
 Average ship delay at the anchorage
Hint: Since a loader may have to be separated from a ship in the middle of loading, you may approximate the loading time as consisting of increments of, say, 10 minutes, and load as much as you can in a 10-minute period and then check the status of the other berth. If you need to separate a loader, do it immediately; otherwise, continue for another 10 minutes of loading. Loading will continue until the entire ship is loaded. During this time, the model may experience periods with one loader working on the ship, and other periods with two loaders working on the ship.
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
There are two berths and two loaders at the port. An uninterrupted iron ore supply arrives at the port from a nearby mine. Whenever there is only one ship at the berths (only one berth is busy), both loaders load the ship together in half the time. However, as soon as another ship arrives at the empty berth, one of the loaders starts working on the new ship. In this case, the current ship continues its loading with only one loader. The loaders are identical and their rate of loading is 2000 tons per hour. Henc e, the loadi ng rate becom es 4000 tons per hour when both loader s wor k on the same ship. Ass ume no tim e is invol ved in shifting loaders. Once a ship is loaded at a berth , it reli nquishes that berth (and the loader ), and then reques ts tug boat service and wai ts until the tug boat arrives. Since there is on ly one tug boat, it does not matter whether it waits at the berth and then relinquis hes the berth after the tug boat arrives or it releases it first and wai ts in a different area. The tug boat tows it away to the offshore an chorage , from where the boat de parts with its iron ore for its destinati on. Higher prior ity is given to departing vessel s in seizing the tug boat. Port Las far does not expe rience tida l activity or storms or any other stopp ages.a. Develop an Arena model for Port Lasfar, and simulat e it for 1 year (8760 hours) .b. Estimate the following statistics: Berth and ship loader utilization Average ship port time Average number of ships at the anchorage Average ship delay at the anchorageHint: Since a loader may have to be separated from a ship in the middle of loading, you may approximate the loading time as consisting of increments of, say, 10 minutes, and load as much as you can in a 10-minute period and then check the status of the other berth. If you need to separate a loader, do it immediately; otherwise, continue for another 10 minutes of loading. Loading will continue until the entire ship is loaded. During this time, the model may experience periods with one loader working on the ship, and other periods with two loaders working on the ship.
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
Có hai bến và hai bộ tải tại cảng. Một nguồn cung cấp quặng sắt không bị gián đoạn đến cảng từ một mỏ ở gần đó. Bất cứ khi nào chỉ có một tàu tại bến (chỉ có một bến đang bận), cả hai bộ tải tải các tàu với nhau trong một nửa thời gian. Tuy nhiên, ngay sau khi một chiếc tàu khác đến tại bến trống rỗng, một trong những bộ tải bắt đầu làm việc trên các tàu mới. Trong trường hợp này, con tàu hiện nay tiếp tục tải của nó chỉ với một bộ nạp. Các bộ tải giống hệt nhau và tỉ lệ tải là 2000 tấn mỗi giờ. Henc e, tỷ lệ becom es loadi ng 4000 tấn mỗi giờ khi cả hai bộ nạp s k wor trên cùng một chiếc tàu. Ass ume không có tim e là ved invol trong việc chuyển đổi bộ tải. Khi một chiếc tàu được tải tại một bến, nó nquishes reli rằng bến (và bộ nạp), và sau đó dịch vụ thuyền reques ts kéo và wai ts cho đến khi tàu kéo đến. Kể từ khi có trên ly một tàu kéo, nó không quan trọng cho dù nó đợi ở bến và sau đó relinquis hes bến sau khi tàu kéo đến hoặc nó phát hành đầu tiên và wai ts trong một khu vực khác nhau. Các tàu kéo dắt nó đi đến ngoài khơi một chorage, từ nơi thuyền de phần với quặng sắt của mình cho destinati trên. Ity trước cao hơn được đưa ra để rời tàu s trong việc nắm bắt các tàu kéo. Cảng Las xa không expe rience hoạt động l Tida hoặc bão hoặc bất kỳ lứa tuổi stopp khác.
a. Phát triển một mô hình Arena Port Lasfar, và simulat e nó cho 1 năm (8760 giờ).
b. Ước lượng số liệu thống kê sau đây:
? Berth và tàu loader sử dụng
? Trung bình thời gian tàu đến cảng biển
? Số lượng trung bình của tàu tại các neo
? Chậm trễ tàu trung bình tại các neo
Gợi ý: Kể từ khi một bộ nạp có thể phải được tách ra từ một con tàu ở giữa tải, bạn có thể gần đúng thời gian tải là bao gồm các số gia, nói rằng, 10 phút, và tải nhiều như bạn có thể trong một khoảng thời gian 10 phút và sau đó kiểm tra tình trạng của các bến khác. Nếu bạn cần để riêng một bộ nạp, làm điều đó ngay lập tức; nếu không, tiếp tục cho thêm 10 phút xếp hàng. Đang tải sẽ tiếp tục cho đến khi toàn bộ con tàu được tải. Trong thời gian này, các mô hình có thể trải nghiệm thời gian với một bộ nạp làm việc trên tàu, và giai đoạn khác với hai bộ tải làm việc trên tàu.
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.