remaining coal quantity at coal yard is 67,317,50 metric tons on 23 rd january 2015 in accordance whith coal survey report of third party (vinacontrol) on 23 january 2015 (attachment 1)the coal used for PGT of unit 2 from 1/2/2015 to 7/2/2015 and startup of unit 1 & 2 for taking over is 41,962.27 metric tonsThe total coal for operation required by GENCO3 to keep the unit in-service during dry season from24/4/2014 to 27/4/2014 and 21/1/2015 to 23/1/2015 is 24,244 metric tons
đang được dịch, vui lòng đợi..
