Parts Are scaffold tubes made of steel pipe that has a 48.3 mm (1.9”)  dịch - Parts Are scaffold tubes made of steel pipe that has a 48.3 mm (1.9”)  Việt làm thế nào để nói

Parts Are scaffold tubes made of st

Parts Are scaffold tubes made of steel pipe that has a 48.3 mm (1.9”) actual outside diameter and at least a 3.2 mm (1/8”) wall thickness?
Are all scaffold components (including couplers) in good condition, and free of defects and detrimental corrosion?
Foundation Are timber sills, at least 765 mm (30”) long, 225 mm (9”) wide, and 38 mm (1-1/2”) thick, used for sand, asphalt, or other soft surfaces?
Are scaffold posts (standards) mounted on steel base plates at least 150 mm x 150 mm (6 in. x 6 in.) by 6 mm (1/4-inch) thick?
If used, are screwjacks adjusted to not more than two-thirds (2/3) of their threaded length?
Is the scaffold not supported by or hung from a guardrail or handrail? (Note: Scaffolds shall not be supported by a guardrail or handrail.)
Posts Are scaffold posts (standards) or frames (for fabricated tubular frame scaffolds) vertical, plumb, straight, and not bent or deformed?
Are posts (standards) located at least 1.5 times the depth of excavation away from the edge of excavation?
If not, have adequate precautions been taken to prevent cave-in of excavation?
For a tube and coupler scaffold, are joints in posts (standards) staggered (adjacent joints do not occur in the same lift)?
For a tube and coupler scaffold, are all joints in posts (standards) connected with a joint pin or end-to-end (sleeve) coupler?
For a system scaffold, are all joints in posts (standards) connected using a spigot?
Lifts Are runners (ledgers) and bearers (transoms) spaced vertically not more than 2 meters (6’-6”) apart (2 meter maximum lift height)?
Are runners (ledgers) and bearers (transoms) installed in both directions at each lift along every line of posts (standards)?
Is the base lift (lowest runners and bearers) installed approximately 150 mm (6”) above the scaffold base?
Are bearers (transoms) and board bearers (intermediate transoms) installed on top of (and not underneath) supporting runners (ledgers)?
For a tube and coupler scaffold, do bearers and board bearers extend at least 100 mm (4 inches) beyond the runner and post centerline?

Page 2 of 4
Lifts Where bearers (transoms) are coupled to runners (ledgers), are they coupled not more than 300 mm (12 inches) from the posts (standards)?
Are joints in adjacent runners (ledgers) and bearers (transoms) not in the same bay?
Are joints in runners and bearers, which are made using end-to-end (sleeve) couplers, located less than 300 mm (12”) from a post?
Are spliced joints in runners and bearers, which are made by overlapping a parallel tube, not in the middle 1/3 of the runner or bearer span?
Light-Duty Tube & Coupler For light-duty tube and coupler scaffolds, are posts (standards) transversely spaced either 1 meter (3’-3”) or 1.2 meters (4 feet) apart?
If transverse post spacing is 1 meter and embossed tubes used, are posts spaced not over 2.7 meters (9 feet) apart longitudinally?
If transverse post spacing is 1 meter and non-embossed tubes used, are posts spaced not over 2.3 meters (7’-6”) apart longitudinally?
If transverse post spacing is 1.2 meters and embossed tubes used, are posts spaced not over 2.4 meters (8 feet) apart longitudinally?
If transverse post spacing is 1.2 meters and non-embossed tubes used, are posts spaced not over 1.8 meters (6 feet) apart longitudinally?
For Light-duty tube and coupler scaffold with 3 working levels, are there no other levels where planks are installed?
For Light-duty tube and coupler scaffold with 2 working levels, are there not over 6 total levels where planks are installed?
For Light-duty tube and coupler scaffold with 1 working level, are there not over 9 total levels where planks are installed?
For Light-duty tube and coupler scaffold with 3 working levels, is the scaffold height not over 28 meters (91 ft.) unless a Special Scaffold?
For Light-duty tube and coupler scaffold with less than 3 working levels, is the scaffold height not over 38 meters (125 ft.) unless Special?
Medium-Duty For Medium-duty tube and coupler scaffold, are all tubes embossed with ASTM A500 (Gr. B), ASTM A53 (Gr. B), BS1139 or EN 10219?
For Medium-duty tube and coupler, are posts spaced not over 1.2 m (4 ft.) apart transversely and not over 1.8 m (6 ft.) apart longitudinally?
For Medium-duty, is at least one board bearer (intermediate transom) installed in each bay of every platform (planked) level?
For Medium-duty tube and coupler scaffold with 2 working levels, are there no other levels where planks are installed?
For Medium-duty tube and coupler scaffold with 1 working level, are there not over 7 total levels where planks are installed?
For Medium-duty tube and coupler scaffold with 1 working level, is scaffold height not over 38 meters (125 ft.) unless a Special Scaffold?
For Medium-duty tube and coupler scaffold with 2 working levels, is scaffold height not over 24 meters (78 ft.) unless a Special Scaffold?
Stability Is vertical diagonal bracing provided in both directions for the full height of the scaffold?
Are braces attached as close as possible to, not more than 300 mm (12 inches) from, the node point (bearer/runner and post intersection)?
Are joints in braces made with end-to-end (sleeve) couplers, or adjustable (swivel) couplers joining two overlapped parallel braces?
If adjustable (swivel) couplers are used to join two overlapping braces, do brace ends overlap by at least 300 mm (12 inches)?
For a tower scaffold (only 4 posts), is plan (horizontal) bracing installed at the base, at the top, and at every third lift to prevent racking?

Page 3 of 4
Stability If the scaffold height is more than 4 times its minimum base dimension, is lateral restraint provided by ties, guys, or equivalent means?
If ties or guys are used, are some installed at the closest horizontal member to the height of 4 times the minimum base dimension?
If ties or guys are used, are they spaced vertically up the scaffold not more than 8 meters (26 feet) (4 lifts) apart?
If ties or guys are used, are some installed as close as feasible to the top of the scaffold?
If ties or guys are used, are some located at both the ends of the scaffold?
If ties or guys are used, are they spaced horizontally along the scaffold length not more than 9 meters (30 feet) apart?
If ties are used, is each tie tube connected to at least 2 posts (standards) or 2 horizontal members (e.g., runners) of the scaffold?
If guys are used, are they installed on both sides of the scaffold and sloped at an angle of about 45 degrees above the horizontal?
If reveal tubes are used, are they used at less than 1/2 the total number of tie points?
If reveal tubes are used, are they securely wedged using reveal pins between opposing surfaces?
If outrigger frames are used, are they installed on both sides of the narrow direction of the scaffold?
If rakers are used, is every raker a single scaffold tube (without splices) not more than 6.4 meters (21 feet) long?
If rakers are used, is the bottom and midpoint of every raker tied back to the scaffold by a horizontal tube coupled to the raker and 2 posts?
If rakers are used, is the base of every raker firmly anchored against movement in all directions (including uplift)?
If rakers are used, is there not more than one (1) scaffold lift installed above the raker tie-in point?
Guardrail System Are toprails, midrails, and toeboards installed along all open sides and ends of platforms where a person could fall over 1.8 meters (6 feet)?
Is a guardrail system provided along all edges of platforms that are more than 360 mm (14 inches) from the face of a wall or structure?
Are toprails located between 0.95 meter (38 inches) and 1.15 meters (45 inches) above the platform walking/working surface?
Are midrails located half way between the toprails and the platform walking/working surface?
Are toprails, midrails, and toeboards secured to the inside of support uprights (posts) that are spaced not over 2.7 meters (9 feet) apart?
Are guardrails sufficiently anchored and strong enough to stop a fall?
If some toprails, midrails, or planks cannot be completely installed, is a yellow scaffold tag attached near all points of access?
If yellow scaffold tag is used, are there adequate and strong enough anchorages to attach full body harness lanyards for all workers?
Platforms Are all working levels fully planked with scaffold planks or fabricated platform units?
Are the supports (bearers/board bearers) for wood planks with a thickness of 38 mm (1-1/2 inches) not over 1.5 meters (5 feet) apart?
Are the supports (bearers/board bearers) for wood planks with a thickness of 50 mm (2 inches) not over 2.4 meters (8 feet) apart?

Page 4 of 4
Platforms Are there any openings or gaps between planks or platform units that are more than 25 mm (1 inch) wide?
Are gaps between planks less than 600 millimeters (2 feet) wide covered with 20 mm (3/4-inch) thick plywood held in place with cleats?
Are gaps between planks that are larger than 600 millimeters (2 feet) wide covered with cross planks (not nailed in place)?
Are all wood scaffold planks at least 38 mm (1-1/2 inches) thick
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
Parts Are scaffold tubes made of steel pipe that has a 48.3 mm (1.9”) actual outside diameter and at least a 3.2 mm (1/8”) wall thickness? Are all scaffold components (including couplers) in good condition, and free of defects and detrimental corrosion? Foundation Are timber sills, at least 765 mm (30”) long, 225 mm (9”) wide, and 38 mm (1-1/2”) thick, used for sand, asphalt, or other soft surfaces? Are scaffold posts (standards) mounted on steel base plates at least 150 mm x 150 mm (6 in. x 6 in.) by 6 mm (1/4-inch) thick? If used, are screwjacks adjusted to not more than two-thirds (2/3) of their threaded length? Is the scaffold not supported by or hung from a guardrail or handrail? (Note: Scaffolds shall not be supported by a guardrail or handrail.) Posts Are scaffold posts (standards) or frames (for fabricated tubular frame scaffolds) vertical, plumb, straight, and not bent or deformed? Are posts (standards) located at least 1.5 times the depth of excavation away from the edge of excavation? If not, have adequate precautions been taken to prevent cave-in of excavation? For a tube and coupler scaffold, are joints in posts (standards) staggered (adjacent joints do not occur in the same lift)? For a tube and coupler scaffold, are all joints in posts (standards) connected with a joint pin or end-to-end (sleeve) coupler? For a system scaffold, are all joints in posts (standards) connected using a spigot? Lifts Are runners (ledgers) and bearers (transoms) spaced vertically not more than 2 meters (6’-6”) apart (2 meter maximum lift height)? Are runners (ledgers) and bearers (transoms) installed in both directions at each lift along every line of posts (standards)? Is the base lift (lowest runners and bearers) installed approximately 150 mm (6”) above the scaffold base? Are bearers (transoms) and board bearers (intermediate transoms) installed on top of (and not underneath) supporting runners (ledgers)? For a tube and coupler scaffold, do bearers and board bearers extend at least 100 mm (4 inches) beyond the runner and post centerline? Page 2 of 4 Lifts Where bearers (transoms) are coupled to runners (ledgers), are they coupled not more than 300 mm (12 inches) from the posts (standards)? Are joints in adjacent runners (ledgers) and bearers (transoms) not in the same bay? Are joints in runners and bearers, which are made using end-to-end (sleeve) couplers, located less than 300 mm (12”) from a post? Are spliced joints in runners and bearers, which are made by overlapping a parallel tube, not in the middle 1/3 of the runner or bearer span? Light-Duty Tube & Coupler For light-duty tube and coupler scaffolds, are posts (standards) transversely spaced either 1 meter (3’-3”) or 1.2 meters (4 feet) apart? If transverse post spacing is 1 meter and embossed tubes used, are posts spaced not over 2.7 meters (9 feet) apart longitudinally? If transverse post spacing is 1 meter and non-embossed tubes used, are posts spaced not over 2.3 meters (7’-6”) apart longitudinally? If transverse post spacing is 1.2 meters and embossed tubes used, are posts spaced not over 2.4 meters (8 feet) apart longitudinally? If transverse post spacing is 1.2 meters and non-embossed tubes used, are posts spaced not over 1.8 meters (6 feet) apart longitudinally? For Light-duty tube and coupler scaffold with 3 working levels, are there no other levels where planks are installed? For Light-duty tube and coupler scaffold with 2 working levels, are there not over 6 total levels where planks are installed? For Light-duty tube and coupler scaffold with 1 working level, are there not over 9 total levels where planks are installed? For Light-duty tube and coupler scaffold with 3 working levels, is the scaffold height not over 28 meters (91 ft.) unless a Special Scaffold? For Light-duty tube and coupler scaffold with less than 3 working levels, is the scaffold height not over 38 meters (125 ft.) unless Special? Medium-Duty For Medium-duty tube and coupler scaffold, are all tubes embossed with ASTM A500 (Gr. B), ASTM A53 (Gr. B), BS1139 or EN 10219? For Medium-duty tube and coupler, are posts spaced not over 1.2 m (4 ft.) apart transversely and not over 1.8 m (6 ft.) apart longitudinally? For Medium-duty, is at least one board bearer (intermediate transom) installed in each bay of every platform (planked) level? For Medium-duty tube and coupler scaffold with 2 working levels, are there no other levels where planks are installed?
For Medium-duty tube and coupler scaffold with 1 working level, are there not over 7 total levels where planks are installed?
For Medium-duty tube and coupler scaffold with 1 working level, is scaffold height not over 38 meters (125 ft.) unless a Special Scaffold?
For Medium-duty tube and coupler scaffold with 2 working levels, is scaffold height not over 24 meters (78 ft.) unless a Special Scaffold?
Stability Is vertical diagonal bracing provided in both directions for the full height of the scaffold?
Are braces attached as close as possible to, not more than 300 mm (12 inches) from, the node point (bearer/runner and post intersection)?
Are joints in braces made with end-to-end (sleeve) couplers, or adjustable (swivel) couplers joining two overlapped parallel braces?
If adjustable (swivel) couplers are used to join two overlapping braces, do brace ends overlap by at least 300 mm (12 inches)?
For a tower scaffold (only 4 posts), is plan (horizontal) bracing installed at the base, at the top, and at every third lift to prevent racking?

Page 3 of 4
Stability If the scaffold height is more than 4 times its minimum base dimension, is lateral restraint provided by ties, guys, or equivalent means?
If ties or guys are used, are some installed at the closest horizontal member to the height of 4 times the minimum base dimension?
If ties or guys are used, are they spaced vertically up the scaffold not more than 8 meters (26 feet) (4 lifts) apart?
If ties or guys are used, are some installed as close as feasible to the top of the scaffold?
If ties or guys are used, are some located at both the ends of the scaffold?
If ties or guys are used, are they spaced horizontally along the scaffold length not more than 9 meters (30 feet) apart?
If ties are used, is each tie tube connected to at least 2 posts (standards) or 2 horizontal members (e.g., runners) of the scaffold?
If guys are used, are they installed on both sides of the scaffold and sloped at an angle of about 45 degrees above the horizontal?
If reveal tubes are used, are they used at less than 1/2 the total number of tie points?
If reveal tubes are used, are they securely wedged using reveal pins between opposing surfaces?
If outrigger frames are used, are they installed on both sides of the narrow direction of the scaffold?
If rakers are used, is every raker a single scaffold tube (without splices) not more than 6.4 meters (21 feet) long?
If rakers are used, is the bottom and midpoint of every raker tied back to the scaffold by a horizontal tube coupled to the raker and 2 posts?
If rakers are used, is the base of every raker firmly anchored against movement in all directions (including uplift)?
If rakers are used, is there not more than one (1) scaffold lift installed above the raker tie-in point?
Guardrail System Are toprails, midrails, and toeboards installed along all open sides and ends of platforms where a person could fall over 1.8 meters (6 feet)?
Is a guardrail system provided along all edges of platforms that are more than 360 mm (14 inches) from the face of a wall or structure?
Are toprails located between 0.95 meter (38 inches) and 1.15 meters (45 inches) above the platform walking/working surface?
Are midrails located half way between the toprails and the platform walking/working surface?
Are toprails, midrails, and toeboards secured to the inside of support uprights (posts) that are spaced not over 2.7 meters (9 feet) apart?
Are guardrails sufficiently anchored and strong enough to stop a fall?
If some toprails, midrails, or planks cannot be completely installed, is a yellow scaffold tag attached near all points of access?
If yellow scaffold tag is used, are there adequate and strong enough anchorages to attach full body harness lanyards for all workers?
Platforms Are all working levels fully planked with scaffold planks or fabricated platform units?
Are the supports (bearers/board bearers) for wood planks with a thickness of 38 mm (1-1/2 inches) not over 1.5 meters (5 feet) apart?
Are the supports (bearers/board bearers) for wood planks with a thickness of 50 mm (2 inches) not over 2.4 meters (8 feet) apart?

Page 4 of 4
Platforms Are there any openings or gaps between planks or platform units that are more than 25 mm (1 inch) wide?
Are gaps between planks less than 600 millimeters (2 feet) wide covered with 20 mm (3/4-inch) thick plywood held in place with cleats?
Are gaps between planks that are larger than 600 millimeters (2 feet) wide covered with cross planks (not nailed in place)?
Are all wood scaffold planks at least 38 mm (1-1/2 inches) thick
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
Các bộ phận có ống giàn giáo làm bằng ống thép có 48,3 mm (1.9 "), đường kính thực tế bên ngoài và ít nhất là 3,2 mm (1/8") độ dày tường?
Có phải tất cả các thành phần giàn giáo (bao gồm cả bộ ghép) trong tình trạng tốt, và miễn khuyết tật và ăn mòn có hại?
Foundation là ngưỡng cửa gỗ, ít nhất là 765 mm (30 ") dài, 225 mm (9") rộng, và 38 mm (1-1 / 2 ") dày, sử dụng cho cát, nhựa đường, hoặc các phần mềm bề mặt?
Có phải gởi giàn giáo (tiêu chuẩn) được gắn trên tấm thép nền ít nhất 150 mm x 150 mm (6 in. x 6 in.) bằng 6 mm (1/4 inch) dày?
Nếu được sử dụng, được Screwjacks điều chỉnh để không hơn hai phần ba (2/3) chiều dài ren của họ?
Sản phẩm giàn giáo không được hỗ trợ bởi hoặc treo trên một lan can hay tay ​​vịn? (Lưu ý: giàn giáo thì không được hỗ trợ bởi một lan can hay tay ​​vịn.)
Bài viết Are gởi giàn giáo (tiêu chuẩn) hoặc khung (cho chế tạo giàn khung hình ống) theo chiều dọc, plumb, thẳng, và không bị cong hoặc biến dạng?
Có phải bài viết (tiêu chuẩn) đặt tại ít nhất 1,5 lần độ sâu khai quật cách mép khai quật?
Nếu không, có biện pháp phòng ngừa thích hợp được thực hiện để ngăn chặn hang động trong khai quật?
Đối với một ống và coupler giàn giáo, là khớp trong bài viết (tiêu chuẩn) so le (khớp xương lân cận không xảy ra trong thang máy giống nhau)?
Đối với một ống và coupler giàn giáo, là tất cả các khớp trong bài viết (tiêu chuẩn) được kết nối với một pin doanh hoặc end-to-end (tay) coupler?
Đối với một hệ thống giàn giáo, là tất cả các khớp trong bài viết (tiêu chuẩn ) kết nối bằng cách sử dụng một cái vòi nước?
Thang máy đang chạy (sổ) và người mang (transoms) cách nhau theo chiều dọc không quá 2 mét (6'-6 ") ngoài (chiều cao nâng tối đa 2 mét)?
Có người chạy (sổ) và người mang (transoms) cài đặt trong cả hai hướng tại mỗi thang dọc theo mỗi dòng của bài viết (tiêu chuẩn)?
Là thang máy cơ sở (người chạy thấp nhất và người mang) được cài đặt khoảng 150 mm (6 ") trên cơ sở giàn giáo?
Có phải người mang (transoms) và người mang bảng (transoms trung gian ) được cài đặt trên đầu trang của (và không phải bên dưới) hỗ trợ vận động viên (sổ)?
Đối với một ống và coupler giàn giáo, làm tượng và người mang board mở rộng ít nhất 100 mm (4 inch) ngoài các Á hậu và bài ​​tâm? Trang 2 của 4 Thang máy ở đâu người mang (transoms) đang cùng với vận động viên (sổ cái), đều cùng không quá 300 mm (12 inch) từ các bài viết (tiêu chuẩn)? Có phải khớp ở người chạy liền kề (sổ) và người mang (transoms) không trong cùng một khoang? là khớp ở người chạy và người mang, mà được thực hiện bằng cách sử dụng (tay) ghép end-to-end, nằm ​​dưới 300 mm (12 ") từ một bài viết? Có phải ghép khớp ở người chạy và người mang, được thực hiện bằng cách lồng ghép một ống song song , không phải ở giữa 1/3 của Á hậu hoặc không ghi tên tuổi? Light-Duty Tube & Coupler Đối với ánh sáng vụ ống và coupler giàn giáo, là bài ​​viết (tiêu chuẩn) hoặc nằm ngang cách nhau 1 mét (3'-3 ") hoặc 1,2 mét (4 feet) ngoài? Nếu bài khoảng cách ngang bằng 1 mét và ống nổi được sử dụng, được viết cách nhau không quá 2,7 mét (9 feet) ngoài theo chiều dọc? Nếu bài khoảng cách ngang bằng 1 mét và ống không nổi được sử dụng, những bài viết cách nhau không hơn 2,3 mét (7'-6 ") ngoài theo chiều dọc? Nếu bài khoảng cách ngang là 1,2 mét và ống nổi được sử dụng, những bài viết cách nhau không quá 2,4 m (8 ft) ngoài theo chiều dọc? Nếu bài khoảng cách ngang là 1,2 mét và không nổi ống được sử dụng, được viết cách nhau không quá 1,8 m (6 feet) ngoài theo chiều dọc? Đối với ống Light-nhiệm vụ và coupler giàn giáo với 3 mức độ làm việc, là không có các cấp độ khác nơi mà các tấm ván được cài đặt? Đối với ống Light-nhiệm vụ và coupler giàn giáo với 2 mức độ làm việc, đang có không quá 6 tổng mức nơi tấm ván được cài đặt? Đối với ống Light-nhiệm vụ và coupler giàn giáo với 1 mức độ làm việc, đang có không quá 9 tổng mức nơi tấm ván được cài đặt? Đối với ống Light-nhiệm vụ và coupler giàn giáo với 3 mức độ làm việc, là chiều cao giàn giáo không quá 28 mét (91 ft.) trừ khi một đài đặc biệt? Đối với ống Light-nhiệm vụ và coupler giàn giáo với ít hơn 3 cấp độ làm việc, là chiều cao giàn giáo không quá 38 mét (125 ft.) trừ đặc biệt? Medium-Duty Đối với ống vừa làm nhiệm vụ và coupler giàn giáo, là tất cả các ống nổi với ASTM A500 (Gr. B), ASTM A53 (Gr B.), BS1139 hoặc EN 10.219? Đối với ống vừa làm nhiệm vụ và coupler, được viết cách nhau không quá 1,2 m (4 ft.) Ngoài nằm ngang và không quá 1,8 m (6 ft.) Ngoài theo chiều dọc ? Đối với trung nhiệm vụ, ít nhất một tàu mang dữ liệu (cây ngang trung gian) được cài đặt cho mỗi khoang của mỗi nền tảng (planked) mức độ nào? Đối với ống vừa làm nhiệm vụ và coupler giàn giáo với 2 cấp độ làm việc, là không có các cấp độ khác nơi mà các tấm ván được cài đặt ? Đối với ống vừa làm nhiệm vụ và coupler giàn giáo với 1 mức độ làm việc, đang có không quá tổng số 7 cấp nơi tấm ván được cài đặt? Đối với ống vừa làm nhiệm vụ và coupler giàn giáo với 1 mức độ làm việc, là giàn giáo cao không quá 38 mét (125 ft. ), trừ khi một đài đặc biệt? Đối với ống vừa làm nhiệm vụ và coupler giàn giáo với 2 cấp độ làm việc, là giàn giáo cao không quá 24 m (78 ft.) trừ khi một đài đặc biệt? Tính ổn định là giằng chéo dọc cung cấp trong cả hai hướng cho chiều cao đầy đủ của đoạn đầu đài? Có phải niềng răng gắn càng gần càng tốt để, không lớn hơn 300 mm (12 inch), các điểm nút (bearer / Á hậu và bài ​​giao lộ)? Có phải khớp trong niềng răng được làm bằng (tay) ghép end-to-end , hoặc có thể điều chỉnh (xoay) ghép nối hai niềng răng song song chồng chéo? Nếu có thể điều chỉnh (xoay) ghép được sử dụng để nối hai niềng răng chồng chéo, làm nẹp kết thúc chồng lên nhau ít nhất 300 mm (12 inch)? Đối với một giàn giáo tháp (chỉ có 4 bài viết) , là kế hoạch (ngang) giằng lắp đặt tại các cơ sở, ở phía trên, và ở mỗi thang máy thứ ba để ngăn kệ? Trang 3 của 4 Stability Nếu chiều cao giàn giáo là hơn 4 lần kích thước cơ sở tối thiểu của nó, được kiềm chế bên cung cấp bởi các mối quan hệ , guys, hoặc phương tiện tương đương? Nếu quan hệ hay kẻ đang sử dụng, là một số cài đặt tại các thành viên ngang gần nhất với chiều cao là 4 lần so với kích thước cơ sở tối thiểu? Nếu quan hệ hay kẻ đang sử dụng, chúng có khoảng cách đều nhau theo chiều dọc lên đoạn đầu đài không hơn 8 mét (26 feet) (4 thang máy) ngoài? Nếu quan hệ hay kẻ đang sử dụng, là một số cài đặt gần như là khả thi để phía trên cùng của giàn giáo? Nếu quan hệ hay kẻ đang sử dụng, là một số nằm ở cả hai đầu của giàn giáo ? Nếu quan hệ hay kẻ đang được sử dụng, chúng có khoảng cách đều nhau theo chiều ngang dọc theo chiều dài giàn giáo không quá 9 mét (30 feet) ngoài? Nếu quan hệ được sử dụng, được mỗi ống tie kết nối với ít nhất 2 bài viết (tiêu chuẩn) hoặc 2 thành viên ngang ( ví dụ, runners) của giàn giáo? Nếu kẻ đang sử dụng, là chúng được cài đặt trên cả hai mặt của giàn giáo và dốc nghiêng một góc khoảng 45 độ so với phương ngang? Nếu tiết lộ ống được sử dụng, được họ sử dụng ít hơn 1/2 tổng số điểm tie? Nếu tiết lộ ống được sử dụng, chúng có an toàn rúc sử dụng tiết lộ chân giữa các bề mặt đối lập? Nếu khung Outrigger được sử dụng, là họ được cài đặt trên cả hai mặt của sự chỉ đạo hẹp của giàn giáo? Nếu rakers được sử dụng, là mỗi cái cào một ống giàn giáo duy nhất (không có chỗ nối) không quá 6,4 mét (21 feet) lâu? Nếu rakers được sử dụng, là đáy và trung điểm của mỗi cái cào gắn trở lại các giàn giáo bằng một ống nằm ngang cùng với những cái cào và 2 bài viết ? Nếu rakers được sử dụng, là cơ sở của mọi người lục lạo neo vững chắc chống lại phong trào trong tất cả các hướng (bao gồm cả nâng lên)? Nếu rakers được sử dụng, là có không nhiều hơn một (1) giàn giáo thang máy được cài đặt trên cái cào tie-in điểm? Guardrail Hệ thống đang toprails, midrails, và toeboards lắp đặt dọc theo tất cả các bên mở và kết thúc của nền tảng nơi mà một người có thể giảm hơn 1,8 m (6 feet)? Là một hệ thống hộ lan tôn sóng được cung cấp cùng tất cả các cạnh của nền tảng đó là hơn 360 mm (14 inch) từ khuôn mặt của một bức tường hoặc cấu trúc? Có phải toprails nằm giữa 0,95 mét (38 inches) và 1,15 m (45 inch) trên các nền tảng đi bộ / bề mặt làm việc? nửa đường đang midrails nằm giữa toprails và các nền tảng đi bộ / bề mặt làm việc? là toprails, midrails, và toeboards chặt vào bên trong uprights hỗ trợ (bài viết) được đặt cách nhau không quá 2,7 mét (9 feet) ngoài? đang lan can đủ neo và đủ mạnh để ngăn chặn một mùa thu? Nếu một số toprails, midrails, hoặc ván có thể không hoàn toàn được cài đặt, là một tag đài vàng gắn gần tất cả các điểm truy cập? Nếu tag đài vàng được sử dụng, đang có neo đủ đầy đủ và mạnh mẽ để đính kèm đầy đủ dây buộc cơ thể cương dùng cho tất cả công nhân? Platforms Có phải tất cả các cấp làm việc planked đầy đủ với giàn giáo ván hoặc các đơn vị nền tảng chế tạo? Có phải hỗ trợ (người mang / người mang board) cho tấm ván gỗ với độ dày 38 mm (1-1 / 2 inches) không quá 1,5 m (5 feet) ngoài? Có phải hỗ trợ (người mang / người cầm bảng ) cho các tấm ván gỗ với độ dày 50 mm (2 inch) không quá 2,4 m (8 ft) ngoài? Trang 4 của 4 Platforms Có hở hoặc những khoảng trống giữa các tấm ván hoặc các đơn vị nền tảng đó là hơn 25 mm (1 inch) rộng? Có những khoảng trống giữa các tấm ván nhỏ hơn 600 mm (2 feet) bao phủ rộng với 20 mm (3/4 inch) ván ép dày giữ tại chỗ với cleats? Có những khoảng trống giữa các tấm ván được lớn hơn 600 mm (2 feet) bao phủ rộng với tấm ván chéo (không đóng đinh tại chỗ)? Có phải tất cả các tấm ván gỗ giàn giáo ít nhất là 38 mm (1-1 / 2 inch) dày





























































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2024 I Love Translation. All reserved.

E-mail: