*** VENDOR'S SCOPE OF WORK:- TO PROVIDE THE KOVA PAINT & PAINTING SERVICE FOR 120 MINUTES FIREPROOF.+ 1ST COATING, PRIMER COATING KG-01: 35-40 MICRON+ 2ND COATING, FIREPROOF NANOPRO-KL (NEW NAME OF KOVA E6): 350--400 MICRON+ 3RD COATING, CT-08 COVER COLOR COATING: 35-40 MICRON- LOCATION: AT ZAMIL'S JOBSITE IN VSIP II IZ, BINH DUONG PROVINCE, VIETNAM.- SCHEDULE:+ 1ST COATING: 5 DAYS FROM THE DATE THE COLUMN IS INSTALLED AND THE GROUND IS HAND-OVER TO VENDOR. THE COLUMN SURFACE TO BE CLEANED BY ZAMIL AND NO RUSTY.+ 2ND COATING: 10 DAYS FROM THE DATE THE ROOF IS AVAILABLE AND THE GROUND IS HAND-OVER TO VENDOR.+ 3RD COATING: 5 DAYS FROM THE DATE 2ND COATING IS FINISHED AND NOT OVER 15 DAYS FROM THE DATE THE ROOF IS AVAILABLE AND THE GROUND IS HAND-OVER TO VENDOR.- PENALTY FOR DELAY: 1% FOR EACH WEEK DELAY BUT NOT OVER 2%.- PROVIDE THE BELOW DOCUMENT.+ WARRANTY CERTIFICATE FOR 120 MINUTES FIREPROOF ISSUED BY KOVA FOR THIS PROJECT+ CERTIFICATE FOR 120 MINUTES FIREPROOF ISSUED BY LOCAL FIRE PROTECTION AUTHORITY FOR THIS PROJECT- TO COMPLY WITH THE STANDARDS OF THE OCCUPATIONAL SAFETY BY GOVERMENT AND CLIENT AND BE FULLY RESPONSIBLE FOR ANY ISSUE & COST CAUSED BY NON-CONFORMANCE.*** ZAMIL'S SCOPE OF WORK:- CLEAN THE COLUMN SURFACE AND HAND-OVER THE GROUND TO THE VENDOR- ARRANGE THE PAYMENT ON TIME.- ADVISE THE COLOR OF TOP COATING RIGHT AFTER THE 1ST COATING IS FINISHED.
đang được dịch, vui lòng đợi..
