Phase Two – Schematic Design
• Attendance at operational briefing for familiarization of H.I.T.S. Hotel Operating
Concepts, Food and Beverage Concepts, and Preliminary Staffing Guide.
• Coordination with H.I.T.S. Preliminary Area Program, internal space planning and
operational relationships to provide a confirmation of the project requirements.
• Preliminary configuration of building, selection of systems, materials, equipment,
construction methods and project delivery.
• Preparation of definitive site plan, building plans, sections, preliminary elevations,
and outline material specifications.
• Preparation of design development timetable in coordination with project delivery.
• Coordination of Owner/Developer's appointed Consultants’ documentation.
• Consultation with all authorities having jurisdiction over the project for the purpose of
meeting and securing code compliance and project permits.
• Presentation of all schematic phase documentation to Owner/Developer and
đang được dịch, vui lòng đợi..