1.1 SECTION INCLUDES: A. Furnish and Install:  1. Gypsum board. 2. Pre dịch - 1.1 SECTION INCLUDES: A. Furnish and Install:  1. Gypsum board. 2. Pre Việt làm thế nào để nói

1.1 SECTION INCLUDES: A. Furnish an

1.1 SECTION INCLUDES:

A. Furnish and Install:
1. Gypsum board.
2. Precast plaster fabrications [GFRG, Glass Fiber Reinforced Gypsum].
3. Acoustical insulation.
4. Access doors and panels within gypsum board assemblies.

B. Related Sections: Without limitation, related sections include:
Section 07 9220 Acoustical Joint Sealants
Section 09 2215 Interior Non Structural Metal Framing
Section 09 2813 Fiber Gypsum Board
Section 09 3000 Tiling
Section 09 9000 Painting and Coating

1.2 SUBMITTALS:

A. Product Data: Manufacturer’s data including instructions, recommendations, and restrictions.

1.3 QUALITY ASSURANCE: Comply with Section 01 4337 In Place Samples.

Part 2 - Products

2.1 GYPSUM BOARD:

A. Standard: ASTM C1396 Standard Specification for Gypsum Board, TCVN 8256:2009: Gypsum board - Specification, TCVN 8257:2009: Gypsum boards - Test methods, QCVN16:2014 – National Technical Regulations on Products, Goods of Building Materials.

B. Glass Mat Gypsum Board: ASTM C1178 Standard Specification for Coated Glass Mat Water-

C. Gypsum Board Basis of Design: “Sheetrock along with SupraCeil metal frame 0.5mm thickness, 605mm spacing”, USG Boral Gypsum Vietnam, www.usgboral.com .

D. Joint Compound and Tape: ASTM C475 Standard Specification for Joint Compound and Joint Tape for Finishing Gypsum Board.

E. Trim: Paper faced metal “tape on” corner bead, edge bead, and trims.

F. Fasteners: ASTM C954 or ASTM C1002.

G. Acoustical Insulation Basis of Design: “Thermafiber SAFB, Sound Attenuation Fire Blankets”, Thermafiber, Inc., www.thermafiber.com

2.2 PRECAST PLASTER, GLASS FIBER REINFORCED GYPSUM [GFRG]:

A. Manufacturers:
1. Formglas Products, Ltd., http://www.formglas.com
2. Pittcon Industries, http://www.pittconindustries.com
3. Stromberg Architectural, http://www.strombergarchitectural.com

B. Standards:
1. ASTM C1355 Standard Specification for Glass Fiber Reinforced Gypsum Composites
2. ASTM C1381Standard Specification for Molded Glass Fiber Reinforced Gypsum Parts

C. Sizes, Shapes, Profiles: Custom as shown.

1. Finish: Smooth for field applied paint.

2. Seams: Concealed, field taped and finished.

3. Factory Reinforcing and Blocking: Required at seams.

2.3 ACCESS DOORS AND PANELS:

A. Manufacturers:
1. Acudor Products, Inc., www.acudor.com
2. JL Industries, division of Activar Construction Products Group, www.jlindustries.com
3. Nystrom Building Products, www.nystrom.com
4. Williams Brothers Corporation of America, www.wbdoors.com

B. Access Door and Panel Schedule - Basis of Design Products:

1. Gypsum Board, Not Fire Rated: “DW-5015”, Acudor Products, Inc., www.acudor.com

2. Gypsum Board, Fire Rated: “FB-5060”, Acudor Products, Inc., www.acudor.com

3. Toilet Rooms, Not Fire Rated: “UF-5000 Stainless Steel”, Acudor Products, Inc.

C. Gaskets: Required for non fire rated doors/panels enclosing plenums.

D. Sizes: As shown or, if not shown:
1. Hand and Arm Reach In Only: ≥200 x 200 mm.
2. Upper Body Reach In: ≥ 600 x 600 mm.
3. Body Pass Through: ≥900 x 900 mm.

E. Latches, Not Fire Rated: Screw driver cam latch.

F. Latches, Fire Rated: Manufacturer’s standard for fire rated product, removable key or knob.

G. Locks: Required for all public accessible doors and panels.
1. Master key into Campus keying system.

Part 3 - Execution

3.1 GYPSUM BOARD INSTALLATION: Comply with manufacturer's instructions and recommendations.

A. Standards: Comply with:
ASTM C840 Standard Specification for Application and Finishing of Gypsum Board.
Gypsum Association GA-216 Application and Finishing of Gypsum Panel Products
Gypsum Association GA-220 Gypsum Board Winter Related Installation Recommendations
Gypsum Association GA-225 Repair of Fire-Rated Gypsum Board Systems
Gypsum Association GA-226 Application of Gypsum Board To Form Curved Surfaces
Gypsum Association GA-231Assessing Water Damage To Gypsum Board
Gypsum Association GA-234 Control Joints for Fire-Resistance Rated Systems
Gypsum Association GA-238 Guidelines for Prevention of Mold Growth on Gypsum Board
Gypsum Association GA-618 Building and Inspecting Smoke Barriers

B. Gypsum Board Installation:
1. Install ceilings prior to walls.
2. Locate joints as far from center of walls and ceilings as possible.
3. Install board face side out.
4. Install board joints and edges over framing members.
5. Stagger vertical joints on opposite sides of walls and in multiple layer work.
6. Do not butt dissimilar board edges.
7. Do not locate a tapered board edge at a framed opening or at wall base.
8. Provide one piece boards around penetrations, except where control joints are provided.
9. Continuously cover and protect framing, vapor retarders, and interior insulation.
10. Maintain continuity of fire rated assemblies at recessed items and penetrations.
11. Provide additional gypsum board layers behind and around items recessed into partitions.
12. Maintain acoustical performance of assemblies at recessed items and penetrations.

C. Beads, Trim, and Reinforcing Tape:
1. Install beads and trims plumb, level, and accurately aligned.
2. Provide continuous beads and trims. Minimize seams.
3. Provide accurately fitted, hair line tight seams in running work.
4. Provide accurately fitted, hair line tight mitered joints at intersections.
5. Fill seams with paintable acrylic sealant.
6. Provide continuous corner bead at outside, convex corners and changes of plane.
7. Provide continuous reinforcing tape at inside, concave corners and changes of plane.
8. Provide additional reinforcing tape at corners of penetrations to help reduce stress cracks.
9. Provide continuous trim for all visible board edges, reveals, and sealant joints.

3.2 GYPSUM BOARD CONTROL JOINTS:

A. Control Joint Locations: Obtain Architect’s approval of each control joint location prior to installation.

B. Control Joints - Not Fire Rated: Provide framing on both sides of control joints. Interrupt gypsum board at control joints.

C. Control Joints - Fire Rated: Comply with Gypsum Association GA-234 Control Joints for Fire-Resistance Rated Systems.

3.3 GYPSUM BOARD FIRE RATED ASSEMBLIES: Match UL design numbers.

3.4 ACOUSTICAL INSULATION: Provide continuous acoustical insulation within gypsum board partitions.

3.5 ACOUSTICAL SEALING: Comply with Section 07 9220 Acoustical Joint Sealants.

3.6 PRECAST PLASTER, GLASS FIBER REINFORCED GYPSUM [GFRG] INSTALLATION:

A. Standard: ASTM C1467 Standard Specification for the Installation of Molded Glass Fiber Reinforced Gypsum Parts.

B. Coordinate light gage steel framing, building systems, and all related work.

C. Install plumb and level.

D. Provide invisible seams after field painting.

3.7 GYPSUM BOARD FINISHING: Comply with GA-214 “Recommended Levels of Gypsum Board Finish”.

End of Section
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
1.1 PHẦN BAO GỒM: A. cung cấp và cài đặt: 1. Hội đồng quản trị của thạch cao. 2. bê thạch cao fabrications [GFRG, thạch cao gia cố kính sợi]. 3. âm thanh cách điện. 4. truy cập vào cửa và bảng trong hội đồng hội đồng quản trị thạch cao. Sinh liên quan đến phần: Không giới hạn, bao gồm phần có liên quan: Chất bịt kín chung âm thanh phần 07 9220 Phần 09 2215 nội thất phòng không cấu trúc kim loại khung Phần 09 2813 sợi thạch cao Ban Phần 09 3000 ốp lát Phần 09 9000 sơn và1.2 CỐ: A. dữ liệu sản phẩm: Của nhà sản xuất dữ liệu bao gồm hướng dẫn, khuyến nghị, và hạn chế. 1.3 đảm bảo chất lượng: Thực hiện theo phần 01 4337 tại nơi mẫu.Phần 2 - sản phẩm2.1 THẠCH CAO HỘI ĐỒNG QUẢN TRỊ: A. tiêu chuẩn: ASTM C1396 đặc tả tiêu chuẩn cho thạch cao ban, TCVN 8256:2009: thạch cao ban - đặc điểm kỹ thuật, TCVN 8257:2009: thạch cao ban - thử nghiệm phương pháp, QCVN16:2014-quốc gia kỹ thuật quy định về sản phẩm, hàng hoá vật liệu xây dựng. Sinh kính Mat thạch cao ban: ASTM C1178 đặc tả tiêu chuẩn cho kính tráng Mat nước- C. thạch cao bảng cơ sở của thiết kế: "Sheetrock cùng với SupraCeil kim loại khung cách 0.5 mm dày, 605 mm khoảng cách", chính phủ Hoa Kỳ Boral thạch cao Việt Nam, www.usgboral.com. Mất phần hợp chất và băng: đặc tả tiêu chuẩn ASTM C475 cho hợp chất chung và khớp băng cho thạch cao khi kết thúc hội đồng quản trị. E. trim: Giấy phải đối mặt kim loại "băng trên" góc hạt, cạnh hạt và xe. F. dây khóa phec mơ: ASTM C954 hoặc ASTM C1002. G. âm thanh cách điện cơ sở của thiết kế: "Thermafiber SAFB, âm thanh sự suy giảm cháy chăn", Thermafiber, Inc, www.thermafiber.com2.2 PRECAST THẠCH CAO, SỢI THỦY TINH GIA CỐ THẠCH CAO [GFRG]: A. các nhà sản xuất: 1. Formglas sản phẩm, Ltd., http://www.formglas.com 2. Pittcon ngành công nghiệp, http://www.pittconindustries.com 3. Stromberg kiến trúc, http://www.strombergarchitectural.com Sinh tiêu chuẩn: 1. tiêu chuẩn ASTM C1355 đặc tả tiêu chuẩn cho sợi thủy tinh gia cố vật liệu tổng hợp thạch cao 2. tiêu chuẩn ASTM C1381Standard đặc điểm kỹ thuật cho sợi đúc thủy tinh gia cố phần thạch cao C. kích thước, hình dạng, Hồ sơ: Tùy chỉnh như được hiển thị. 1. hoàn tất: Mịn cho lĩnh vực áp dụng sơn. 2. seams: Che dấu, lĩnh vực ghi âm sẵn và hoàn thành. 3. nhà máy tăng cường và chặn: yêu cầu tại seams.2.3 TRUY CẬP VÀO CỬA VÀ BẢNG: A. các nhà sản xuất: 1. Acudor sản phẩm, Inc, www.acudor.com 2. JL ngành công nghiệp, các bộ phận của tập đoàn Activar xây dựng sản phẩm, www.jlindustries.com 3. sản phẩm xây dựng Nystrom, www.nystrom.com 4. Williams Brothers Corporation of America, www.wbdoors.com B. truy cập vào cửa và lịch trình bảng điều khiển - cơ sở của thiết kế sản phẩm: 1. bảng thạch cao, không cháy xếp: "DW-5015", Acudor sản phẩm, Inc, www.acudor.com 2. Ban thạch cao, xếp hạng cháy: "FB-5060", Acudor sản phẩm, Inc, www.acudor.com 3. nhà vệ sinh phòng, không cháy đánh giá cao: "thép không gỉ UF-5000", Acudor sản phẩm, Inc C. vòng đệm: Yêu cầu cho hỏa lực phòng không xếp hạng cửa/bảng bao quanh plenums. D. Sizes: As shown or, if not shown: 1. Hand and Arm Reach In Only: ≥200 x 200 mm. 2. Upper Body Reach In: ≥ 600 x 600 mm. 3. Body Pass Through: ≥900 x 900 mm. E. Latches, Not Fire Rated: Screw driver cam latch. F. Latches, Fire Rated: Manufacturer’s standard for fire rated product, removable key or knob. G. Locks: Required for all public accessible doors and panels. 1. Master key into Campus keying system.Part 3 - Execution3.1 GYPSUM BOARD INSTALLATION: Comply with manufacturer's instructions and recommendations. A. Standards: Comply with: ASTM C840 Standard Specification for Application and Finishing of Gypsum Board. Gypsum Association GA-216 Application and Finishing of Gypsum Panel Products Gypsum Association GA-220 Gypsum Board Winter Related Installation Recommendations Gypsum Association GA-225 Repair of Fire-Rated Gypsum Board Systems Gypsum Association GA-226 Application of Gypsum Board To Form Curved Surfaces Gypsum Association GA-231Assessing Water Damage To Gypsum Board Gypsum Association GA-234 Control Joints for Fire-Resistance Rated Systems Gypsum Association GA-238 Guidelines for Prevention of Mold Growth on Gypsum Board Gypsum Association GA-618 Building and Inspecting Smoke Barriers B. Gypsum Board Installation: 1. Install ceilings prior to walls. 2. Locate joints as far from center of walls and ceilings as possible. 3. Install board face side out. 4. Install board joints and edges over framing members. 5. Stagger vertical joints on opposite sides of walls and in multiple layer work. 6. Do not butt dissimilar board edges. 7. Do not locate a tapered board edge at a framed opening or at wall base. 8. Provide one piece boards around penetrations, except where control joints are provided. 9. Continuously cover and protect framing, vapor retarders, and interior insulation. 10. Maintain continuity of fire rated assemblies at recessed items and penetrations. 11. Provide additional gypsum board layers behind and around items recessed into partitions. 12. Maintain acoustical performance of assemblies at recessed items and penetrations. C. Beads, Trim, and Reinforcing Tape: 1. Install beads and trims plumb, level, and accurately aligned. 2. Provide continuous beads and trims. Minimize seams. 3. Provide accurately fitted, hair line tight seams in running work. 4. Provide accurately fitted, hair line tight mitered joints at intersections. 5. Fill seams with paintable acrylic sealant. 6. Provide continuous corner bead at outside, convex corners and changes of plane. 7. Provide continuous reinforcing tape at inside, concave corners and changes of plane. 8. Provide additional reinforcing tape at corners of penetrations to help reduce stress cracks. 9. Provide continuous trim for all visible board edges, reveals, and sealant joints.3.2 GYPSUM BOARD CONTROL JOINTS: A. Control Joint Locations: Obtain Architect’s approval of each control joint location prior to installation. B. Control Joints - Not Fire Rated: Provide framing on both sides of control joints. Interrupt gypsum board at control joints. C. Control Joints - Fire Rated: Comply with Gypsum Association GA-234 Control Joints for Fire-Resistance Rated Systems.3.3 GYPSUM BOARD FIRE RATED ASSEMBLIES: Match UL design numbers.3.4 ACOUSTICAL INSULATION: Provide continuous acoustical insulation within gypsum board partitions.3.5 ACOUSTICAL SEALING: Comply with Section 07 9220 Acoustical Joint Sealants.3.6 PRECAST PLASTER, GLASS FIBER REINFORCED GYPSUM [GFRG] INSTALLATION: A. Standard: ASTM C1467 Standard Specification for the Installation of Molded Glass Fiber Reinforced Gypsum Parts. B. Coordinate light gage steel framing, building systems, and all related work. C. Install plumb and level. D. Provide invisible seams after field painting.3.7 GYPSUM BOARD FINISHING: Comply with GA-214 “Recommended Levels of Gypsum Board Finish”.End of Section
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
1.1 PHẦN BAO GỒM: A. Cung cấp và cài đặt: 1. Tấm thạch cao. 2. Bịa đặt thạch cao đúc sẵn [GFRG, Glass Fiber Reinforced thạch cao]. 3. Cách âm. 4. Cửa và nắp máy trong cụm tấm thạch cao. B. Mục liên quan: Không giới hạn, phần liên quan bao gồm: Phần 07 9220 Acoustical phần bịt kín Phần 09 2215 nội thất Non Kết cấu Kim loại Framing Phần 09 2813 Sợi Gypsum Board Phần 09 3000 Lát Phần 09 9000 Vẽ tranh và Coating 1.2 submittals: A. Thông tin sản phẩm: dữ liệu của nhà sản xuất bao gồm cả hướng dẫn, khuyến cáo và hạn chế. 1.3 CHẤT LƯỢNG BẢO ĐẢM: Tuân thủ Phần 01 4337 In Place Samples. Phần 2 - Sản phẩm 2.1 THẠCH CAO BAN: A. Tiêu chuẩn: ASTM C1396 Đặc điểm kỹ thuật tiêu chuẩn cho Ban thạch cao, TCVN 8256: 2009: Thạch cao đồng quản trị - Thông số kỹ thuật, TCVN 8257: 2009: Tấm thạch cao - Phương pháp thử, QCVN16:. 2014 - Quy chuẩn kỹ thuật quốc gia về Sản phẩm, Hàng hóa vật liệu xây dựng B. Glass Mat Ban thạch cao: ASTM C1178 Đặc điểm kỹ thuật tiêu chuẩn cho Coated Glass Mat Nước C. Ban thạch cao Cơ sở Thiết kế: "sheetrock cùng với SupraCeil khung kim loại 0.5mm độ dày, khoảng cách 605mm", USG Boral Gypsum Việt Nam, www.usgboral.com. D. Compound doanh và Tape: ASTM C475 Tiêu chuẩn kỹ thuật đối với Compound doanh và doanh Tape cho hoàn thiện Ban thạch cao. E. Trim: Giấy phải đối mặt kim loại "Băng" góc bead, cạnh hạt, và cắt tỉa. F. Chốt: ASTM C954 hoặc ASTM C1002. G. Cơ sở âm cách nhiệt của thiết kế: "Thermafiber SAFB, Sound Attenuation cháy Chăn", Thermafiber, Inc., www.thermafiber.com 2.2 BÊ thạch cao, GLASS FIBER GIA CỐ BẰNG THẠCH CAO [GFRG]: A. Các nhà sản xuất: 1. Formglas Products, Ltd., http://www.formglas.com 2. Pittcon Industries, http://www.pittconindustries.com 3. Stromberg kiến trúc, http://www.strombergarchitectural.com B. Tiêu chuẩn: 1. ASTM C1355 Đặc điểm kỹ thuật tiêu chuẩn cho Glass Fiber Reinforced thạch cao Composites 2. ASTM C1381Standard Đặc điểm kỹ thuật cho lát bằng gỗ Glass Fiber Reinforced Gypsum Parts C. Kích thước, hình dạng, Profiles: Tuỳ chỉnh như hình. 1. Kết thúc: Thoa cho lĩnh vực áp dụng sơn. 2. Đường nối: Giấu, lĩnh vực ghi âm sẵn và hoàn thành. 3. Nhà máy Củng cố và Blocking:. Yêu cầu ở vỉa 2.3 DOORS VÀ BẢNG ACCESS: A. Các nhà sản xuất: 1. Acudor Products, Inc., www.acudor.com 2. JL Industries, bộ phận của Activar Xây dựng Sản phẩm Group, www.jlindustries.com 3. Nystrom Xây dựng Sản phẩm, www.nystrom.com 4. Williams Corporation Brothers của Mỹ, www.wbdoors.com B. Truy cập cửa và Panel Schedule - Cơ sở Thiết kế Sản phẩm: 1. Ban thạch cao, không cháy Rated: "DW-5015", Acudor Products, Inc., www.acudor.com 2. Ban thạch cao, Fire Rated: "FB-5060", Acudor Products, Inc., www.acudor.com 3. Phòng vệ sinh, không cháy Rated: "UF-5000 Thép không gỉ", Acudor Products, Inc. C. Vòng đệm:. Yêu cầu cho cửa chống cháy / tấm không bao phiên họp D. Kích thước: Như thể hiện hay, nếu không được hiển thị: 1. Bàn tay và cánh tay Đạt Trong Chỉ:. ≥200 x 200 mm 2. Upper Body Đạt Trong: ≥ 600 x 600 mm. 3. Body Pass throught: ≥900 x 900 mm. E. Chốt, không cháy Xếp hạng: Vít cam điều khiển chốt. F. Chốt, Fire Rated:. Tiêu chuẩn của nhà sản xuất cho lửa giá cho sản phẩm, phím có thể tháo rời hoặc núm G. Khóa: Bắt buộc đối với tất cả các cửa ra vào công cộng và tấm. 1. . Thạc sĩ chính vào hệ thống keying Campus Phần 3 - Thực hiện. 3.1 THẠCH CAO LẮP ĐẶT BAN: Tuân thủ hướng dẫn của nhà sản xuất và khuyến nghị A. Tiêu chuẩn: Tuân thủ: ASTM C840 Tiêu chuẩn kỹ thuật cho ứng dụng và hoàn thiện của Ban thạch cao. Thạch cao Hiệp hội GA-216 ứng dụng và hoàn thiện thạch cao Bảng điều chỉnh Sản phẩm Hội Gypsum GA-220 Ban thạch cao Winter liên quan kiến nghị lắp đặt Hội Gypsum GA-225 Sửa chữa cháy-Rated Gypsum Board Systems Hội thạch cao GA-226 ứng dụng của thạch cao Board Để Mẫu cong bề mặt thạch cao Hiệp hội GA-231Assessing Water Damage Để Ban thạch cao Thạch cao Hiệp hội GA-234 điều khiển Kẹp Fire-Resistance Rated Hệ thống thạch cao Hiệp hội Hướng dẫn GA-238 để phòng ngừa sự tăng trưởng Mold về Ban thạch cao Thạch cao Hiệp hội GA-618 Xây dựng và Kiểm tra rào khói B. Ban thạch cao Lắp đặt: 1. Cài đặt trần trước khi bức tường. 2. Xác định vị trí các khớp như xa từ trung tâm của bức tường và trần nhà càng tốt. 3. Cài đặt ban mặt bên ngoài. 4. Cài đặt khớp board và các cạnh với các thành viên đóng khung. 5. Tách rời các khớp dọc phía bên kia của bức tường và trong công việc nhiều lớp. 6. Đừng mông cạnh bảng khác nhau. 7. Không xác định vị trí một cạnh ban thon tại một mở được đóng khung hoặc trên tường tại cơ sở. 8. Cung cấp một bảng mảnh xung quanh thâm nhập, trừ trường hợp khớp kiểm soát được cung cấp. 9. Liên tục che và bảo vệ khung, chất hãm bay hơi, và cách trang trí nội thất. 10. Duy trì tính liên tục của lửa hội đánh giá ở hạng mục lõm và thâm nhập. 11. Cung cấp thêm các lớp tấm thạch cao phía sau và xung quanh mặt lõm vào phân vùng. 12. Duy trì hiệu suất âm thanh của hội đồng tại mục lõm và thâm nhập. C. Beads, Trim, và Tăng cường Tape: 1. Cài đặt hạt và Trims plumb, mức độ, và chính xác liên kết. 2. Cung cấp hạt liên tục và cắt tỉa. Giảm thiểu vỉa. 3. Cung cấp lắp đặt chính xác, dòng tóc vỉa chặt chẽ trong việc điều hành công việc. 4. Cung cấp lắp đặt chính xác, dòng tóc chặt mitered khớp ở các ngã tư. 5. Điền vào các đường nối với paintable keo acrylic. 6. Cung cấp góc hạt liên tục ở bên ngoài, các góc lồi và những thay đổi của máy bay. 7. Cung cấp băng củng cố liên tục tại các góc bên trong, lõm và những thay đổi của máy bay. 8. Cung cấp băng gia cố thêm ở góc xuyên để giúp làm giảm các vết nứt stress. 9. Cung cấp cắt liên tục cho tất cả các cạnh bảng hiển thị, tiết lộ, để bịt kín và khớp. 3.2 THẠCH CAO BAN KIỂM SOÁT khớp: A. Phần kiểm soát Địa điểm: Lấy chính kiến trúc sư của mỗi địa điểm doanh kiểm soát trước khi cài đặt. B. Khớp Control - Không Cháy Rated: Cung cấp khung trên cả hai mặt của khớp kiểm soát. Ngắt tấm thạch cao tại các khớp kiểm soát. C. Khớp kiểm soát - Fire Rated:. Tuân thủ với Thạch cao Hiệp hội GA-234 điều khiển Kẹp Fire-Resistance Hệ thống đánh giá. Assemblies 3.3 THẠCH CAO BAN CHÁY RATED: số thiết kế phù hợp với UL 3.4 Tấm cách âm: Cung cấp cách âm liên tục trong phân vùng tấm thạch cao. 3.5 DÁN âm : Tuân thủ Phần 07 9220 phần Acoustical bịt kín. 3.6 BÊ thạch cao, GLASS FIBER GIA CỐ BẰNG THẠCH CAO [GFRG] LẮP ĐẶT: A. Tiêu chuẩn: ASTM C1467 Đặc điểm kỹ thuật tiêu chuẩn cho Lắp đặt đúc Glass Fiber Reinforced Gypsum Parts. B. Phối hợp ánh sáng khung thép gage, xây dựng hệ thống, và tất cả các công việc liên quan. C. Cài đặt dọi và mức độ. D. Cung cấp đường nối vô hình sau khi sơn lĩnh vực. 3.7 THẠCH CAO BAN FINISHING:. Tuân thủ với GA-214 "Levels xuất của Ban thạch cao Finish" End Mục


























































































































































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2024 I Love Translation. All reserved.

E-mail: