Close the Main Water Supply Control Valve (D.1) and Priming Valve (B.1). Open the Auxiliary Drain Valve (B.13). Relieve pressure in the priming chamber by opening the Emergency Release Valve (B.9).
Close the Main Water Supply Control Valve (D.1) and Priming Valve (B.1). Open the Auxiliary Drain Valve (B.13).Relieve pressure in the priming chamber by opening the Emergency Release Valve (B.9).
Đóng Water Supply Control Valve chính (Q.1) và mồi Valve (B.1). Mở Auxiliary Xả Valve (B.13). Chữa áp lực trong buồng mồi bằng cách mở Release Van khẩn cấp (B.9).