DESCRIPTION OF GENERAL CONSTRUCTION METHOD
CONSTRUCTION PACKAGE NO.3C (CP3C)
HANOI – HO CHI MINH CITY RAILWAY LINE BRIDGES SAFETY
IMPROVEMENT PROJECT
CONTENT
PART I: STATEMENT ON CONSTRUCTION OF BRIDGE WORKS……….. 3
I.1. Temporary construction…………………………………………………………. 3
1. Temporary road to construction site………………………………………... 3
2. Temporary structure for substructure construction in the deepwater area…. 4
3 Temporary structure for superstructure construction………………………4
I.2. Substructure construction method……………………………………………… 6
1. Excavation method………………………………………………………… 6
2. Pilling method for cofferdam under existing girder……………………….. 7
3. Concrete method…………………………………………………………… 8
4. Concrete method of bored pile……………………………………………. 10
5. Quality control method of bored pile……………………………………… 14
I.3. Superstructure fabrication work……………………………………………... 15
1. Factory of fabrication……………………………………………………… 15
2. Method of fabrication……………………………………………………… 15
PART II: CONSTRUCTION METHOD OF BRIDGES …………………………. 49
II.1. Construction method of Thap Cham bridge Km1408+544…………………… 49
II.2. Construction method of Song Quao Bridge Km1412+434……………………. 54
II.3. Construction method of Song Long Song Lon Km1464+831…………………. 58
II.4. Construction method of Song Long Song Nho Bridge Km1465+042………. 63
II.5. Construction method of Song Luy Bridge Km1505+864……………………. 68
II.6. Construction method of Muong Man Bridge Km1551+334 ………………….. 72
PART III : WORK METHOD FOR TRACK WORKS………………………. 77
SECTION I : CONSTRUCTION METHOD…………………………………… 77
1. Understanding of track installation on the existing line ………………….. 78
2. Understanding of track installation to realignment section………………… 84
3. Understanding of track installation on bridge……………………………… 84
4. Method of forwarding track material ……………………………………… 87
5. Method of shifting vertical and horizontal alignment……………………… 88
6. Method of long rail………………………………………………………… 94
SECTION II: CONSTRUCTION PROCEDURE OF APPROACH ROAD
AND ON BRIDGE ……………………………………………….. 106
7. Track work construction at approach road and on bridge for
THAP CHAM BRIDGE Km 408+544……………………………………. 106
8. Track work construction at approach road and on bridge for
SONG QUAO BRIDGE KM1412+434.00……………………………….. 109
9. Track work construction at approach road and on bridge for
SONG LONG SONG LON BRIDGE Km 1464+831……………………... 113
10. Track work construction at approach road and on bridge for
SONG LONG SONG NHO BRIDGE Km 1465+042……………………… 117
11. Track work construction at approach road and on bridge for
SONG LUY BRIDGE Km 1505+864……………………………………… 120
12. Track work construction at approach road, road inside station
and on bridge for MUONG MAN BRIDGE Km 1551+334……………… 123
13. Material resources ………………………………………………………… 127
14. Material and equipments storage and preservation ………………………. 127
15. Transportation capacity of vehicles to deliver materials
and equipments to the site…………………………………………………. 128
16. Quality control method …………………………………………………… 129
17. Environment protection…………………………………………………… 130
18. Method of geometric dimension insurance ………………………………. 131
19. Necessary window times and cooperation with authorities
of Vietnam Railways (VNR)………………………………………………. 131
PART I: STATEMENT ON CONSTRUCTION OF BRIDGE WORKS
I- GENERAL CONSTRUCTION METHOD
I.1. Temporary construction.
1. Temporary road to construction site.
a. Thap Cham Bridge:
- Thap Cham Bridge is at Phan Rang – Thap Cham City, Binh Thuan Province. The bridge is located near provincial road 703 of 8m width. The construction site is near provincial road 703, all material and equipments will be transported through this road to the site. Embankment material will be transported by truck through road 703 to the site. Rail, sub – ballast, ballast and sleeper will be transported by train to the site and unloaded to the location selected by the Contractor.
- The Contractor builds a temporary road at upstream side of A2 abutment from crossing road Km1408+931.10 to construction yard no. 2 to transport machine and equipment. Temporary roads with a total length L = 180m, wide B = 4 m.
- The structure of temporary road from the top down as follows: Surface layer is crushed stone with thickness 20cm, roadbed is K90 soil with thickness 50cm placed on natural ground.
b. Song Quao Bridge:
- Song Quao Bridge is at Ninh Phuoc District of Binh Thuan Province. The bridge is located near provincial road 703 of 8m width. The construction site is near provincial road 703, all material and equipments will be transported through this road to the site. Embankment material will be transported by truck through road 703 to the site. Rail, sub – ballast, ballast and sleeper will be transported by train to the site and unloaded to the location selected by the Contractor.
- The Contractor builds a temporary road at upstream side of A1 abutment from Km1412+134.12 to KM1412+455.72 to transport machine and equipment. Temporary roads with a total length L = 321.60m, wide B = 4 m.
- The structure of temporary road from the top down as follows: Surface layer is crushed stone with thickness 20cm, roadbed is K90 soil with thickness 25-45cm placed on natural ground.
c. Song Long Song Lon Bridge:
- Song Long Song Lon Bridge is at Tuy Phong District of Binh Thuan Province. Site access to the site can not be opened due to the local road is not allowed for heavy duty truck and difficulties for the construction of site access (due to large volume of site clearance, long path from the site access to local road, residential area). The contractor shall hire Vietnam Railways for the transportation of equipment and materials to the site. Rail, sub ballast, ballast and sleepers will be transported from the quarries and supplier to the site by train hired from Vietnam Railways and unloaded to the place selected by the Contractor.
- The Contractor builds a temporary road at downstream side from A1 abutment to A2 abutment to transport machine and equipment. Temporary roads with a total length L = 321.60m, wide B = 4 m.
- The structure of temporary road from the top down as follows: Surface layer is crushed stone with thickness 20cm, roadbed is K90 soil with thickness 25-45cm placed on natural ground.
d. Song Long Song Nho Bridge:
- The Contractor builds a temporary road at downstream side from A2 abutment to A1 abutment and connect to temporary road of Song Long Song Lon to transport machine and equipment. Temporary roads with a total length L = 321.60m, wide B = 4 m.
- The structure of temporary road from the top down as follows: Surface layer is crushed stone with thickness 20cm, roadbed is K90 soil with thickness 25-45cm placed on natural ground.
e. Song Luy Bridge:
- The Contractor builds a temporary road from crossing road KM1506+258 to A2 abutment to transport machine and equipment. Temporary roads with a total length L = 350m, wide B = 4 m.
- The structure of temporary road from the top down as follows: Surface layer is crushed stone with thickness 20cm, roadbed is K90 soil with thickness 40-90cm placed on natural ground.
f. Muong Man Bridge:
- The Contractor builds 2 temporary roads from 2 construction yards to A1, A2 abutment to transport machine and equipment. Temporary roads with a total length L = 53m, wide B = 4 m.
- The structure of temporary road from the top down as follows: Surface layer is crushed stone with thickness 20cm, roadbed is K90 soil with thickness 40-90cm placed on natural ground.
2. Temporary structure for substructure construction in the deepwater area
- All bridges under the construction package CP3C locate at the wading river only drain water in flood season. So relating to the construction method of substructure for all bridges, it is necessary to construct a temporary access road to the construction site, combined with making floating island to transport equipment and facilities to the site.
- Temporary access road and construction floating island: elevation of temporary access road and floating island shall be 0.5m higher than the water level. Temporary road shall be of 4m wide, 1:1.5 slopes. Temporary road structure shall be as follow: embank roadbed, spread macadam of 20cm thick layer on the surface (refer for the details in attached drawings for each bridge)
- Construction method: construction work shall be constructed with encroachment embankment method.
Determine track centerline by measuring machine. Transport soil to construction site by truck and unload in stack. Use bulldozer to grade soil and encroach the bank. Tamp the embankment to designed compactness by compactor. Temporary access road shall be constructed at the same time with temporary culvert for water flow and drainage during the construction.
3. Temporary structure for superstructure construction
3.1. Staging for new girder installation
Description: Staging for girder installation includes steel spans on temporary piers of driven foundation pile or shallow foundation. Piers shall be connected byangle steel L100x100, refined bolt and welded seam, stringer and cross beam by I shaped steel. Rail shall behandled in perpendicular to the stringer at distance 3m on the stringer. Pave staging with 5cm thickwood shingle. For girders installed on assembly stand, staging shall be of designed width to place and transport girder (attached file)
Construction method of staging to install new girder:
- Construct temporary pier of sta