1. GeneralThe Contractor shall conduct consolidation grouting in accordance with the level 2 design drawings, general requirement and technical specification (TS 7 drilling and grouting) in the civil works contract (CWC) other than specified in here in under. Necessary temporary facilities shall be planned by the contractor and be incorporated into the Detailed Works Program (DWP)