References to illustrations are indicated in brackets, e.g. (2/4). The first number indicates the figure number, the second number indicates the position number in the illustration. All illustrations are diagrammatic projections without any claim of completeness.Pictures/ illustrations may differ from the actual delivered tunnel thruster.
đang được dịch, vui lòng đợi..
