From 21/10/2015 to 28/11/2015 the Phu My 3 BOT company Ltd. commissioned theCenter of Material Failure Analysis (COMFA) to do the metallographic examination of pipelinesystem and superheater tubes of 02 HRSGs at Phu My 3 Power Plant, using Replica Technique. Thematerials of invesgated components are SA335 P91 and P22.The testing points (locations) are appointed by Phu My 3 BOT Company.Totally, COMFA investigated 44 weldment points and 21 normal points.
đang được dịch, vui lòng đợi..