Shaft boring for piles commencing at the existing levels including supplying, handling, transporting, pitching, driving and withdrawing temporary steel casing and bentonite slurry, and subsequently 'removal of temporary pile casing, and clearing and disposal of excavated materials to a dump provided by the Contractor and approved by the Government.
đang được dịch, vui lòng đợi..