Compared to traditional level crossings,use of the LCP reduces hardware costs,and also enables significant savings tobe made during the design, planningand installationstages.In addition to cost savings, the WayguardWESTeX GCP 3000, as a “Constant Warning”device, provides consistent warningtimes irrespective of the speed of theapproachingtrain, and this contributesto increased safety by reducing the riskof road users misusing the crossing.Wayguard WESTeX GCP 4000 levelcrossing controllerThe Wayguard WESTeX GCP 4000 iscapableof providing complete crossingcontrol for up to six lines and fourbarriers,as well as complex layouts– for example, areas containing stations,multiplelines and where the strike-inpoint is separated by signal sections.
đang được dịch, vui lòng đợi..
