6 Assumptions & Client Obligations6.1 AssumptionsThe following assumptions are made by INFOPRO in respect of the Scope of Work stated in Section 3.1 on the LOS Project. In the event that these assumptions are incorrect, or ceased to be valid during the performance of the Scope of Work, or there are changes that result in a deviation from the assumptions, such circumstances may have an impact on INFOPRO’s responsibilities and the overall schedule of the LOS Project
đang được dịch, vui lòng đợi..
