Project status
In June 2004, the Clondalkin plant had already purchased project-specific equipment
for €980 000. Sean estimated its resale value at next to nothing. Equipment remaining
to be purchased amounted to €270 000, to make up the budgeted total of €1.25 million. Development costs incurred to date amounted to €680 000, with only €70 000 of
the budgeted €750 000 remaining. Likewise, a large part of the investment in moulds
had already been committed. As the moulds belonged to Asiacar, the invested amount
would be recovered in full.
If the terms imposed by Asiacar were accepted, the job would be a loss-maker for
Morgan Components as the revenue obtained from a unit price of €67.50 would not
cover the full cost of almost €91. As Exhibit 202.3 shows, the losses would amount to
€7 million.
Sean knew that part of those losses were not real, but merely reflected the impact of
the overhead allocation. The impact on the Panel PLT’s income statement, however,
was real enough. And it was by that income statement that Sean and his team would
be evaluated.
Possible measures
Reduce features
One alternative would be to redesign the panel to elimate some parts or replace them
with cheaper ones. This would require a considerable investment in product and
process redesign, and might mean having to find new suppliers to make sure that
deadlines were met
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
Dự án tình trạng
tháng 6 năm 2004, thực vật Clondalkin đã đã mua thiết bị dành riêng cho dự án
€980 000. Sean ước tính giá trị bán lại của nó bên cạnh không có gì. Thiết bị còn lại
để được mua lên đến €270 000, để tạo thành ngân sách tổng 1,25 triệu Euro. Phát triển chi phí phát sinh đến nay lên đến €680 000, với chỉ €70 000 của
các ngân sách €750 000 còn lại. Tương tự như vậy, một phần lớn của đầu tư trong khuôn
đã cam kết. Như khuôn mẫu thuộc về Asiacar, số tiền đầu tư
sẽ được phục hồi trong toàn.
nếu các điều khoản áp đặt bởi Asiacar đã được chấp nhận, công việc nào là một hãng sản xuất giảm cân cho
Morgan thành phần như thu nhập thu được từ một đơn vị giá của €67.50 nào không
chi phí gần như €91, đầy đủ. Như cho thấy triển lãm 202.3, các thiệt hại nào số tiền để
€ 7.000.000.
Sean biết đó là một phần của những thiệt hại đã không thực sự, nhưng chỉ là phản ánh ảnh hưởng của
phân bổ trên không. Tác động về báo cáo thu nhập của bảng điều khiển PLT, Tuy nhiên,
thực sự đủ. Và đó là do đó báo cáo thu nhập đó Sean và nhóm của ông nào
được đánh giá.
các biện pháp có thể
làm giảm tính năng
Một thay thế nào là thiết kế lại bảng điều khiển để elimate một số phần hoặc thay thế họ
với cái giá rẻ hơn. Điều này sẽ yêu cầu một đầu tư đáng kể trong sản phẩm và
xử lý thiết kế lại, và có thể có nghĩa là phải tìm nhà cung cấp mới để đảm bảo rằng
thời hạn được đáp ứng
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
Project status
In June 2004, the Clondalkin plant had already purchased project-specific equipment
for €980 000. Sean estimated its resale value at next to nothing. Equipment remaining
to be purchased amounted to €270 000, to make up the budgeted total of €1.25 million. Development costs incurred to date amounted to €680 000, with only €70 000 of
the budgeted €750 000 remaining. Likewise, a large part of the investment in moulds
had already been committed. As the moulds belonged to Asiacar, the invested amount
would be recovered in full.
If the terms imposed by Asiacar were accepted, the job would be a loss-maker for
Morgan Components as the revenue obtained from a unit price of €67.50 would not
cover the full cost of almost €91. As Exhibit 202.3 shows, the losses would amount to
€7 million.
Sean knew that part of those losses were not real, but merely reflected the impact of
the overhead allocation. The impact on the Panel PLT’s income statement, however,
was real enough. And it was by that income statement that Sean and his team would
be evaluated.
Possible measures
Reduce features
One alternative would be to redesign the panel to elimate some parts or replace them
with cheaper ones. This would require a considerable investment in product and
process redesign, and might mean having to find new suppliers to make sure that
deadlines were met
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.