HBC shall resubmit the method of statement for lifting &positioning generator for ICIC, ESJV reviewing.ICIC, HBCJan-30-2016On 23rd Dec20151.2.21. ICIC answered canopy queries Architectural drawings (A-07-46-08) will befollowed Structure drawings (S-11-52-01) Section A-A conflicts with Detail 1 ( S-11-52-01)Section A-A is correct End Plates which use to locate bolts of canopy is20mm THK, other end plate will be followeddrawings. Welding: 2 sides, Grade E42, tested by X-Ray andscan. Finish paint must follow specification Purlin heads do not need to cover ICIC will revise again DETAIL CONNECTPURLIN, SECTION 1-1.2. HBC needs to propose Method statement connection between purlin andbeam. Turnbuckle for bracing Detail connect bracing