Drill holes the correct diameter, location specified. Clean sanitary borehole.Piercing through the drilled holesAttach hose to pump and insert a pipe sealant on the pump gun. Glue pumps in 1 head of the drilled holes. When the glue appears at the other end of the hole drilled, the drilling tube cement mortar. Keep pumping until the glue fills 100% of the drilled holes, then stopped.-Fixed steel after drying completely and new downloads.
đang được dịch, vui lòng đợi..
