During the implementation of the project, the Contractor will provide temporary service roads including structures for his construction works and these works need additional land from several land owners.After the completion of the construction, all the plants, equipments and the similar facilities provided by the Contractor shall be removed and the site shall be cleaned and all the damaged portions shall be rectified as it was before. In case of using additional land outside of ROW (Right-of-Way), the Contractor shall pay the owner(s) for the necessary charges for the utilization of the land.The Contractor will provide temporary service roads for his construction works within ROW including temporary structures for the convenience of his construction works. The construction of temporary structures will be necessary to ensure the quality and safety of the works. The Contractor shall have a sole responsibility for any damage and problem arising from the temporary facilities provided by the Contractor.Before constructing temporary structures, the Contractor shall submit the general construction design including quantities for payment for the approval of the Engineer and the related local authorities. The Contractor shall submit the detailed drawings for temporary structures when requested by the Engineer. Such detailed drawing shall include centerline, profiles, cross-section profiles, road-surface structure, signs, lighting systems, technical design for temporary bridge and jetty (if any) and utilization period of these structures, and the method for clearing and reinstatement of the site after the completion of works prior to handing over to the owner(s).The Contractor shall always ensure the roads and pathways that are affected by the Contractor’s activities, from scattering soils, materials and debris and maintain in a good and safe condition. Prior to the commencement of construction activities, the Contractor shall provide signs, barriers and other traffic control equipments in accordance with plans, technical standards and the request from the Engineer and the related local authorities. Traffic control equipments can only be operated when necessary and the operation of these equipments are appropriate with the actual site condition.It is required to set up the temporary fence to prevent the visual sight of construction from the adjacent existing transport facilities and building at the locations determined by the Engineer.
đang được dịch, vui lòng đợi..
