Electricity, Water and Wastewater:TP and DAV will find a solution how to calculate consumption of electricity, Water consumption and wastewater. If any other cost that will be arising during the rental period, DAV will be notified in advance.The price of the electricity and the water price must be accordance with the billing that TP receive. DAV will install Wastewater system to clean the impurity in the production water, coming from the raw material production and the calcium production. DAV intend to clean all production water, to be free for any impurity and pollution. TP also need to clarify capacity of power supply, to ensure that the capacity of electricity is sufficient to the capacity of the equipment DAV intend to install.
đang được dịch, vui lòng đợi..
