3.2 SELECTION OF THE BRD SUB-CONTRACTORA. A sub-contractor experienced much in installation and removal of the bracket as well as integration of the bracket into the form frame shall be selected to be approved by the personnel in charge.
đang được dịch, vui lòng đợi..