1. Please chia Quotation for Construction only (including, leveling up, piles, Civil, steel) and am also gồm construction, Electrical works, mechanical works and fire protection.
2. We need to get to see the Possibility Estimation của to meet our target amount of 8,100,000USD by this week. After that, WE CAN send you the full details with CAD drawings.
3. As I Mentioned yesterday, We do not have structural drawings at the moment ... as our designs have changed for many times. Please Estimate based on của suggestions with Numbers of PHC piles, piles & Loading test and test standard of weight for each cũng buildings' area.
- Please ReMinD mà basement floor of main building was deleted.
4. Parking area (8100M2) cũng do not have detailed drawings, please add của suggestions (Roof, ground, M & E and cũng firefighting) complied with Vietnam Regulations.
(entrances and parking area surrounding blocks Gross)
5. M & E and fire protection, firefighting drawings are not yet the same lý vì the prepared. Please include all the M & E. Some issues are Mentioned as below.
- Mater Electric line: 2000KVA (including 1000+ in 1000 with construction of transformers and input from VEN)
- Lift (passengers transportation 'in the main building 1000K lift, Cargo lifts in the Main and C building: Hoist type gồm box , rails, auto stop ... etc. - All MITSUBISHI brands
- mushroom exhaust fans Roof type: Kruger brand (A, B, C factory) -385 000 CMH
- Wall type exhaust fans: Kruger brand (1st FL back of the Main building) - 21000CMH
- Ceiling fans on the canteen Floor (main building)
- Booster pumps and other pumps (Japan Ebara brand / or Grundfos)
- Air pips system (A, B, C and 1st FL of main building), Air-compressor MCs are excluded.
- Including lighting system but working direct lighting of A, B, C factories and special line in the main building are excluded.
- Including generator rooms but excluding the generator machines.
- Air conditioning system in all offices and R & D. (System air carcass in the 1st FL of the main building and R & D office covering with EAU 1000CMH.
- Adding Air conditioning system in dormitory and office part of 2nd FL in the main building.
6. Garbage's' collecting house and underground tank Wastewater treatment system (500CBM) are missing on the drawing, please add on the quotation.
7. Underground water tank (Tab water / rain water system) and pumps' rooms, manholes ... in main building maintenance. , Emergency firefighting water tank (800CBM) underground near the main gate.
8. Including gardening (Grass, Grass blocks, palm trees D 10 cm or more)
9. Maintenance walks on the roof in A, B, C buildings (catwalks)
10. Current level of the site is 1800 (compactness 0.85). - You can go and check.
11. Temporally works, electric power, loads, are already installed .... office. Please include this cost to be Settled and Paid khỏi total contract amount.
Test piles and loading test to be Settled and cost cũng paid from the total contract amount
12. Including all the license and cost (official and not official cả)
13. 5% Detention month for repair (3years), Penalty for delay of 0.1% per day.
14. Construction period is 11 month from paying the deposit of the contract (30%)
15. B factory building will be separated 2 years later and start paying the deposit money from the.