Locate previous electrical cable/ Pull electrical cables and wire as in AmericaInstall operator consoleTest electrical controls/Tie down cablesTrench concrete to make all exiting conduit flush with groundGrout under baseALL FENCING NEEDS TO BE REMOVED PRIOR TO CONCRETE TOP FINISH. If not removed the fence could be below 110cm safety requirement. Also, if not removed the fence panels will not be removable if access is needed to service the ride Height measurement sign must be removed prior to concrete top finish and installed in correct positionRide entrance from queue missing a gate. Gate swing direction and hardware NOTES AS PER DDP MINIGAME SUPPLEMENTARY PLANS. ( photo 33Ride exit missing a gate next to operator booth. Gate swing direction and hardware NOTES AS PER DDP MINIGAME SUPPLEMENTARY PLANS. ( photo 34 )Add concrete floor top finishGet any parts needed deliveredTest ride in automatic mode/Prep for Huss visitCheck for spare slip rings for Jos to add lightingDetermine where large mushroom will be placedAdapt small mushrooms, using ventilation, for new decorationsFind cylinder limit switch locations (2)Complete entry cementClean site of all debris and garbage (required before first run)Huss T&C/Run fault freeOperations training
đang được dịch, vui lòng đợi..
