1. PIPING AS SHOWN ON THE PLANS IS DIAGRAMMATIC IN NATURE DUE TO SCALE. FIELD ADJUSTMENTS FROM THE PLANS MAY BE REQUIRED AT THE CONTRACTORS EXPENSE.
2. ALL PIPING TO BE LOCATED WITHIN THE OWNER'S PROPERTY LINES.
3. ALL PIPE, FITTINGS AND VALVES TO BE ABLE TO COMPLY WITH DIN METRIC STANDARDS.
4. ALL IRRIGATION PIPE SHALL BE INSTALLED PER THE LEGEND AND SPECIFICATIONS.
5. ALL LATERAL FITTINGS INCLUDING DEAD ENDS SHALL BE TAT PIPE OR APPROVED EQUAL.
6. ALL MAINLINE FITTINGS INCLUDING DEAD ENDS AND MAINLINE VALVES SHALL BE LEEMCO EPOXY COATED DUCTILE IRON OR APPROVED EQUAL, WITH GASKET CONNECTIONS. ALL DUCTILE IRON REDUCING TEES, ELLS, FITTINGS, CONNECTIONS, ETC SHALL UTILIZE CONNECTOR RINGS.
7. WHEN INSTALLING THE LEEMCO MAIN-LINE VALVE INTO A CHANGE OF DIRECTION TEE, CONTRACTOR MUST REMOVE THE DIN GASKET FROM THE BELL OUTLET OF THE TEE WHERE THE VALVE WILL BE INSERTED. LEEMCO WILL PROVIDE AN IPS GASKET WITH EVERY SPIGOT X BELL GATE VALVE AND MUST BE INSTALLED TO REPLACE THE DIN GASKET.
8. ALL V-I-H SPRINKLERS SHALL BE MOUNTED ON LASCO (1-1/2") TAP'T SERVICE SADDLES AND (1-1/2") OR (1-1/4") ACME SWING JOINTS. THE SWING JOINT SHALL BE ADAPTED AT THE SWING JOINT OUTLET TO MATCH THE SIZE OF THE SPRINKLER INLET IF NEEDED. QUICK COUPLERS TO BE MOUNTED ON (18") X 25mm (1-1/2") NPT SWING JOINTS.
9. ALL PIPE CROSSING ROADWAYS SHALL BE DIRECTIONAL BORED ALONG WITH WIRE SLEEVES.
10. ALL LOCATIONS OF AIR RELIEF VALVES AND SYSTEM DRAIN VALVES WILL BE DETERMINED IN FIELD BASED ON SITE ELEVATIONS DURING CONSTRUCTION. LOCATE AIR RELIEF VALVES AT THE HIGHEST POINT IN THE AREA AND DRAIN VALVES AT THE LOW POINT IN THE MAINLINE NEAR A WATER RELIEF POINT (LAKE, CREEK, DRAIN BASIN, ETC.). ESTIMATED LOCATIONS ARE LOCATED ON THE PLANS.
11. LOCATIONS OF QUICK COUPLER VALVES SHALL BE TO THE FRONT LEFT AND BACK REAR OF THE GREENS AND FINALIZED IN FIELD DURING CONSTRUCTION BY THE OWNER'S REPRESENTATIVE. ALL QUICK COUPLE VALVES LOCATED ON GREENS SHALL BE INSTALLED WITHIN 1m (3') OF A SPRINKLER UNLESS OTHERWISE DIRECTED BY THE OWNER'S REPRESENTATIVE. SPARE 24V WIRE (SATELLITE SYSTEM) OR DECODER CABLE SHALL BE RUN TO EACH QUICK COUPLER.
12. ALL FITTING CONNECTIONS FOR GREEN AND TEE SPRINKLERS SHALL BE DIRECTED AWAY FROM PUTTING GREEN OR TEE SURFACES.
13. PIPING TO TEE SPRINKLERS WITHIN THE TEE SURFACES SHALL BE KEPT TO A MINIMUM.
14. IRRIGATION CONTRACTOR SHALL THOROUGHLY COMPACT ALL MAINLINE TRENCHES IN LIFTS NOT TO EXCEED 30 cm (12") WITH A VERMEER TRENCH COMPACTION MACHINE OR EQUIVALENT. FINAL ACCEPTANCE OF TRENCH BACKFILL SHALL REST WITH OWNER'S REPRESENTATIVE.
15. ROUTES OF MAIN LINE PIPES MAY REQUIRE ADDITIONAL FITTINGS TO AVOID EXISTING TREES OR VEGETATION, LAKES AND/OR STREAMS, FEATURES CONSTRUCTION OR UTILITIES WHICH MAY NOT BE CLEARLY IDENTIFIED UNTIL CONSTRUCTION HAS BEGUN. CONTRACTOR SHALL PROVIDE ALL FITTINGS, CONNECTORS, JOINT RESTRAINTS, ETC. AS MAY BE REQUIRED TO SO AS TO NOT EXCEED RECOMMENDED PIPE CURVATURE.
16. MAXIMUM DEFLECTION OF HDPE PIPE SECTIONS SHALL BE KEPT TO TWENTY-FIVE TO ONE RATIO OR LESS, OR AS DESIGNATED BY PIPE MANUFACTURER, WHICHEVER IS LESS.
17. ALL TRENCH LINES SHALL BE KEPT OUT OF DRIP LINES OF TREES EXCEPT AS DIRECTED AND APPROVED BY THE OWNER'S REPRESENTATIVE.
18. ALL TRENCHES LOCATED IN ROCK OR OTHERWISE UNSUITABLE SOILS SHALL BE OVER-EXCAVATED TO A MINIMUM OF 75 mm (3") AND 75mm (3") OF SAND SHALL BE PLACED BELOW ALL PIPING AND WIRING, AND A MINIMUM OF 150mm (6") PLACED ABOVE ALL PIPING AND WIRING. THE REMAINING MATERIAL FOR TRENCH BACKFILL SHALL BE CLEAN AND FREE OF ORGANIC DEBRIS AND ROCKS AND APPROVED BY EITHER THE CONSULTANT OR OWNER'S REPRESENTATIVE BEFORE PLACEMENT IN TRENCH.
19. CONTRACTOR SHALL PROVIDE PERMANENT MARKERS FOR ENDS OF ALL PIPE SLEEVES AND ENDS OF ALL PIPES BURIED ACROSS STREAMS, DRAINAGE CHANNELS AND/OR EASEMENTS.
20. CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL PIPING TO BE SUPPORTED OR SUSPENDED ON BRIDGES WITH OWNER'S REPRESENTATIVE DURING CONSTRUCTION.
21. ROUTING OF MAIN LINE PIPING AROUND CLUBHOUSE AREA, ROADWAYS AND/OR EXISTING STRUCTURES AND UTILITIES SHALL BE COORDINATED WITH OWNER'S REPRESENTATIVE(S) PRIOR TO EXCAVATION OF TRENCHES.
22. ALL QUICK COUPLER VALVES SHALL BE INSTALLED OUTSIDE OF GREEN SURFACES AND INSTALLED AS CALLED FOR IN THE DETAILS.
23. ALL MAINLINE STUB-OUTS ARE TO BE CAPPED AT THE TEE AND THRUST BLOCKED. THE LOCATION SHALL BE MARKED BY A 10" ROUND VALVE BOX.
24. CONTRACTOR IS RESPONSIBLE FOR ALL EXISTING MAINLINE TIE-IN'S NOTED ON PLAN AND ANY OTHERS REQUIRED TO KEEP THE EXISTING SYSTEM OPERATIONAL WHILE THE NEW SYSTEM IS INSTALLED.
25. CONTRACTOR WILL BE RESPONSIBLE TO REPAIR ALL EXISTING PIPE, POWER WIRE AND 24V STATION WIRE TO MAINTAIN EXISTING IRRIGATION SYSTEM
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
PIPING NOTES:1. PIPING AS SHOWN ON THE PLANS IS DIAGRAMMATIC IN NATURE DUE TO SCALE. FIELD ADJUSTMENTS FROM THE PLANS MAY BE REQUIRED AT THE CONTRACTORS EXPENSE. 2. ALL PIPING TO BE LOCATED WITHIN THE OWNER'S PROPERTY LINES.3. ALL PIPE, FITTINGS AND VALVES TO BE ABLE TO COMPLY WITH DIN METRIC STANDARDS. 4. ALL IRRIGATION PIPE SHALL BE INSTALLED PER THE LEGEND AND SPECIFICATIONS. 5. ALL LATERAL FITTINGS INCLUDING DEAD ENDS SHALL BE TAT PIPE OR APPROVED EQUAL. 6. ALL MAINLINE FITTINGS INCLUDING DEAD ENDS AND MAINLINE VALVES SHALL BE LEEMCO EPOXY COATED DUCTILE IRON OR APPROVED EQUAL, WITH GASKET CONNECTIONS. ALL DUCTILE IRON REDUCING TEES, ELLS, FITTINGS, CONNECTIONS, ETC SHALL UTILIZE CONNECTOR RINGS. 7. WHEN INSTALLING THE LEEMCO MAIN-LINE VALVE INTO A CHANGE OF DIRECTION TEE, CONTRACTOR MUST REMOVE THE DIN GASKET FROM THE BELL OUTLET OF THE TEE WHERE THE VALVE WILL BE INSERTED. LEEMCO WILL PROVIDE AN IPS GASKET WITH EVERY SPIGOT X BELL GATE VALVE AND MUST BE INSTALLED TO REPLACE THE DIN GASKET.8. ALL V-I-H SPRINKLERS SHALL BE MOUNTED ON LASCO (1-1/2") TAP'T SERVICE SADDLES AND (1-1/2") OR (1-1/4") ACME SWING JOINTS. THE SWING JOINT SHALL BE ADAPTED AT THE SWING JOINT OUTLET TO MATCH THE SIZE OF THE SPRINKLER INLET IF NEEDED. QUICK COUPLERS TO BE MOUNTED ON (18") X 25mm (1-1/2") NPT SWING JOINTS. 9. ALL PIPE CROSSING ROADWAYS SHALL BE DIRECTIONAL BORED ALONG WITH WIRE SLEEVES.10. ALL LOCATIONS OF AIR RELIEF VALVES AND SYSTEM DRAIN VALVES WILL BE DETERMINED IN FIELD BASED ON SITE ELEVATIONS DURING CONSTRUCTION. LOCATE AIR RELIEF VALVES AT THE HIGHEST POINT IN THE AREA AND DRAIN VALVES AT THE LOW POINT IN THE MAINLINE NEAR A WATER RELIEF POINT (LAKE, CREEK, DRAIN BASIN, ETC.). ESTIMATED LOCATIONS ARE LOCATED ON THE PLANS. 11. LOCATIONS OF QUICK COUPLER VALVES SHALL BE TO THE FRONT LEFT AND BACK REAR OF THE GREENS AND FINALIZED IN FIELD DURING CONSTRUCTION BY THE OWNER'S REPRESENTATIVE. ALL QUICK COUPLE VALVES LOCATED ON GREENS SHALL BE INSTALLED WITHIN 1m (3') OF A SPRINKLER UNLESS OTHERWISE DIRECTED BY THE OWNER'S REPRESENTATIVE. SPARE 24V WIRE (SATELLITE SYSTEM) OR DECODER CABLE SHALL BE RUN TO EACH QUICK COUPLER.
12. ALL FITTING CONNECTIONS FOR GREEN AND TEE SPRINKLERS SHALL BE DIRECTED AWAY FROM PUTTING GREEN OR TEE SURFACES.
13. PIPING TO TEE SPRINKLERS WITHIN THE TEE SURFACES SHALL BE KEPT TO A MINIMUM.
14. IRRIGATION CONTRACTOR SHALL THOROUGHLY COMPACT ALL MAINLINE TRENCHES IN LIFTS NOT TO EXCEED 30 cm (12") WITH A VERMEER TRENCH COMPACTION MACHINE OR EQUIVALENT. FINAL ACCEPTANCE OF TRENCH BACKFILL SHALL REST WITH OWNER'S REPRESENTATIVE.
15. ROUTES OF MAIN LINE PIPES MAY REQUIRE ADDITIONAL FITTINGS TO AVOID EXISTING TREES OR VEGETATION, LAKES AND/OR STREAMS, FEATURES CONSTRUCTION OR UTILITIES WHICH MAY NOT BE CLEARLY IDENTIFIED UNTIL CONSTRUCTION HAS BEGUN. CONTRACTOR SHALL PROVIDE ALL FITTINGS, CONNECTORS, JOINT RESTRAINTS, ETC. AS MAY BE REQUIRED TO SO AS TO NOT EXCEED RECOMMENDED PIPE CURVATURE.
16. MAXIMUM DEFLECTION OF HDPE PIPE SECTIONS SHALL BE KEPT TO TWENTY-FIVE TO ONE RATIO OR LESS, OR AS DESIGNATED BY PIPE MANUFACTURER, WHICHEVER IS LESS.
17. ALL TRENCH LINES SHALL BE KEPT OUT OF DRIP LINES OF TREES EXCEPT AS DIRECTED AND APPROVED BY THE OWNER'S REPRESENTATIVE.
18. ALL TRENCHES LOCATED IN ROCK OR OTHERWISE UNSUITABLE SOILS SHALL BE OVER-EXCAVATED TO A MINIMUM OF 75 mm (3") AND 75mm (3") OF SAND SHALL BE PLACED BELOW ALL PIPING AND WIRING, AND A MINIMUM OF 150mm (6") PLACED ABOVE ALL PIPING AND WIRING. THE REMAINING MATERIAL FOR TRENCH BACKFILL SHALL BE CLEAN AND FREE OF ORGANIC DEBRIS AND ROCKS AND APPROVED BY EITHER THE CONSULTANT OR OWNER'S REPRESENTATIVE BEFORE PLACEMENT IN TRENCH.
19. CONTRACTOR SHALL PROVIDE PERMANENT MARKERS FOR ENDS OF ALL PIPE SLEEVES AND ENDS OF ALL PIPES BURIED ACROSS STREAMS, DRAINAGE CHANNELS AND/OR EASEMENTS.
20. CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL PIPING TO BE SUPPORTED OR SUSPENDED ON BRIDGES WITH OWNER'S REPRESENTATIVE DURING CONSTRUCTION.
21. ROUTING OF MAIN LINE PIPING AROUND CLUBHOUSE AREA, ROADWAYS AND/OR EXISTING STRUCTURES AND UTILITIES SHALL BE COORDINATED WITH OWNER'S REPRESENTATIVE(S) PRIOR TO EXCAVATION OF TRENCHES.
22. ALL QUICK COUPLER VALVES SHALL BE INSTALLED OUTSIDE OF GREEN SURFACES AND INSTALLED AS CALLED FOR IN THE DETAILS.
23. ALL MAINLINE STUB-OUTS ARE TO BE CAPPED AT THE TEE AND THRUST BLOCKED. THE LOCATION SHALL BE MARKED BY A 10" ROUND VALVE BOX.
24. CONTRACTOR IS RESPONSIBLE FOR ALL EXISTING MAINLINE TIE-IN'S NOTED ON PLAN AND ANY OTHERS REQUIRED TO KEEP THE EXISTING SYSTEM OPERATIONAL WHILE THE NEW SYSTEM IS INSTALLED.
25. CONTRACTOR WILL BE RESPONSIBLE TO REPAIR ALL EXISTING PIPE, POWER WIRE AND 24V STATION WIRE TO MAINTAIN EXISTING IRRIGATION SYSTEM
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
PIPING THUYẾT:
1. PIPING AS SHOWN VỀ KẾ HOẠCH LÀ biểu đồ TRÊN BẢN CHẤT do quy mô. ĐIỀU CHỈNH LĨNH VỰC TỪ KẾ HOẠCH CÓ THỂ YÊU CẦU TẠI NHÀ THẦU PHÍ.
2. ALL PIPING ĐƯỢC NẰM TRONG NGÀNH NGHỀ HỮU CỦA CHỦ SỞ HỮU.
3. ALL ỐNG, PHỤ KIỆN VÀ VAN ĐỂ CÓ THỂ QUY DIN METRIC TIÊU CHUẨN.
4. ALL ỐNG THỦY LỢI ĐƯỢC CÀI ĐẶT PER THE LEGEND VÀ KỸ THUẬT.
5. TẤT CẢ PHỤ KIỆN BAO GỒM bên ENDS DEAD SẼ TAT PIPE HOẶC PHÊ BÌNH.
6. ALL Mainline PHỤ KIỆN BAO GỒM ENDS DEAD và Mainline van HỢP BE LEEMCO EPOXY tráng sắt dễ uốn HOẶC PHÊ BÌNH, CÓ KẾT NỐI gasket. ALL dễ uốn sắt GIẢM TEES, ELL, phụ kiện, KẾT NỐI, ETC sẽ tận dụng NHẪN KẾT NỐI.
7. KHI CÀI ĐẶT LEEMCO CHỦ-LINE VAN VÀO THAY ĐỔI HƯỚNG TEE THẦU PHẢI BỎ gasket DIN TỪ OUTLET BELL CỦA TEE WHERE VAN sẽ được chèn vào. LEEMCO SẼ CUNG CẤP AN IPS Gasket VỚI MỌI vòi nước X BELL GATE VALVE VÀ PHẢI CÀI ĐẶT ĐỂ THAY gasket DIN.
8. ALL tưới nước VIH SẼ ĐƯỢC TREO ON LASCO (1-1 / 2 ") Saddles DỊCH VỤ VÀ TAP'T (1-1 / 2") OR (1-1 / 4 ") ACME khớp SWING. CÁC PHẦN SWING SẼ ĐƯỢC thích nghi AT CÁC oUTLET PHẦN SWING đỂ PHÙ HỢP VỚI CÁC SIZE CỦA tưới nước INLET NẾU CẦN THIẾT. ghép NHANH đỂ ĐƯỢC TREO ON (18 ") X 25mm (1-1 / 2") khớp SWING NPT.
9. ALL PIPE CROSSING Roadways SẼ hướng KHOAN VEN VỚI DÂY tay áo.
10. TẤT CẢ CÁC ĐỊA ĐIỂM AIR RELIEF vAN VÀ vAN HỆ THỐNG hố ga SẼ ĐƯỢC ĐỊNH TRONG LĨNH VỰC TRÊN cao SITE TRONG XÂY DỰNG. VỊ AIR RELIEF vAN TẠI ĐIỂM cAO NHẤT TRONG vAN KHU VỰC VÀ hố ga TẠI ĐIỂM tHẤP TRONG Mainline NEAR Một POINT RELIEF NƯỚC (LAKE, CREEK, cống BASIN, VV). VỊ TRÍ DỰ KIẾN đƯỢC nẰM VỀ KẾ HOẠCH.
11. ĐỊA ĐIỂM HÀNH NHANH coupler van SẼ ĐẾN TRƯỚC tRÁI VÀ TRỞ VỀ SAU CỦA GREENS và hoàn thiện TRONG LĨNH VỰC TRONG XÂY DỰNG BỞI vAN COUPLE ALL NHANH đại diện. CHỦ SỞ HỮU CỦA nẰM TRÊN GREENS SẼ ĐƯỢC CÀI ĐẶT TRONG 1m (3 ') MỘT tưới nước Trừ trường hợp được đại diện CÁC CHỦ SỞ HỮU. TÙNG 24V WIRE (HỆ THỐNG VỆ TINH) HOẶC GIẢI MÃ CÁP SẼ ĐƯỢC CHẠY ĐẾN TỪNG NHANH coupler.
12. ALL KẾT NỐI NỐI CHO XANH và vòi phun nước TEE SẼ được dẫn ra khỏi ĐƯA XANH HOẶC TEE MẶT.
13. ỐNG VỚI tưới nước TEE TRONG MẶT TEE SẼ ĐƯỢC GIỮ MỘT TỐI THIỂU.
14. THỦY LỢI THẦU SẼ triệt COMPACT ALL Mainline hào TRÊN thang máy KHÔNG QUÁ 30 cm (12 ") VỚI MÁY VERMEER rãnh Đầm HOẶC TƯƠNG ĐƯƠNG. CHẤP NHẬN CUỐI CÙNG HÀNH rãnh lấp SẼ REST của VỚI ĐẠI DIỆN SỞ HỮU.
15. ĐƯỜNG ỐNG DÒNG CHỦ THỂ PHẢI PHỤ KIỆN BỔ SUNG đỂ TRÁNH CÂY HIỆN HỮU HOẶC THẢM THỰC VẬT, LAKES VÀ / HOẶC suối, TÍNH NĂNG XÂY DỰNG HOẶC TIỆN ÍCH MÀ KHÔNG ĐƯỢC RÕ RÀNG XÁC ĐỊNH ĐẾN XÂY DỰNG đã bắt đầu. THẦU SẼ CUNG CẤP TẤT CẢ PHỤ KIỆN, KẾT NỐI, hạn chế PHẦN, ETC. AS CÓ THỂ BUỘC pHẢI SO AS TO KHÔNG QUÁ NÊN ống cong.
16. TỐI ĐA lệch CỦA PHẦN ốNG HDPE SẼ đƯỢC gIỮ đỂ HAI MƯƠI NĂM-MỘT TỶ LỆ HOẶC íT HOẶC theo chỉ định của nhà sản xuất ống, cái nào ít hơn.
17. TẤT CẢ dÒNG rãnh SẼ đƯỢC gIỮ NGOÀI NGÀNH NGHỀ DRIP HÀNH CÂY TRỪ theo hướng dẫn và THUẬN CỦA ĐẠI DIỆN. CÁC CHỦ SỞ HỮU
18. TẤT CẢ hào nẰM TRONG ROCK HOĂC ĐẤT không phù hợp SẼ ĐƯỢC VỀ khai quật MỘT TỐI THIỂU CÁC 75 mm (3 ") và 75mm (3") CỦA cÁT SẼ được đặt dưới ALL ỐNG VÀ ĐẤU NỐI, VÀ TỐI THIỂU CÁC 150mm (6 ") đặt trên ALL ỐNG VÀ ĐẤU NỐI. VẬT CÒN LẠI CHO rãnh lấp SẼ ĐƯỢC SẠCH và không có cặn HỮU VÀ ĐÁ VÀ THUẬN CỦA HOẶC TƯ VẤN HOẶC CHỦ SỞ HỮU CỦA ĐẠI DIỆN TRƯỚC KHI ĐẶT TRÊN rãnh.
19. THẦU SẼ CUNG CẤP MARKERS THƯỜNG CHO TẤT CẢ CÁC ENDS ống tay áo và ENDS CÁC ỐNG chôn Across STREAMS, KÊNH THOÁT NƯỚC VÀ / HOẶC quyền địa.
20. THẦU SẼ TỌA ĐỘ CÀI ĐẶT TẤT CẢ PIPING ĐỂ ĐƯỢC HỖ TRỢ HOẶC TREO TRÊN CẦU VỚI ĐẠI DIỆN SỞ HỮU TRONG XÂY DỰNG.
21. ROUTING CHÍNH ĐƯỜNG DÂY ỐNG QUANH clubhouse AREA, đường và / hoặc CẤU TRÚC VÀ TIỆN ÍCH HIỆN HỮU SẼ được phối hợp với SỞ HỮU ĐẠI DIỆN (S) TRƯỚC KHI moi hào.
22. ALL van Van nối nhanh SẼ ĐƯỢC CÀI ĐẶT NGOÀI XANH MẶT VÀ CÀI ĐẶT AS GỌI CHO TRONG CHI TIẾT.
23. ALL Mainline Stub-outs LÀ ĐƯỢC giới hạn ở mức THE TEE và lực đẩy BLOCKED. ĐỊA ĐIỂM SẼ ĐƯỢC ĐÁNH DẤU CỦA A "VÒNG 10 VAN BOX.
24. THẦU LÀ CHỊU TRÁCH NHIỆM CHO TẤT CẢ Mainline HIỆN HỮU TIE-IN CỦA ghi trên KẾ HOẠCH VÀ MỌI NGƯỜI KHÁC CẦN GIỮ HỆ THỐNG HIỆN HOẠT ĐỘNG TRONG KHI HỆ THỐNG MỚI ĐƯỢC CÀI ĐẶT.
25. THẦU SẼ TRÁCH NHIỆM SỬA CHỮA TẤT CẢ HIỆN HỮU PIPE, POWER DÂY VÀ TRẠM 24V DÂY DUY TRÌ HIỆN HỮU HỆ THỐNG THỦY LỢI
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2024 I Love Translation. All reserved.

E-mail: