Upon receipt of the submission, Engineering Document Controller (EDC) checks if it’sin order and acknowledge on the transmittal and return by fax to the Contractor. If it isnot in order, the EDC has to inform the Contractor and request for re-submission
đang được dịch, vui lòng đợi..
