The architect, in cooperation with designer ,draws preliminary plans t dịch - The architect, in cooperation with designer ,draws preliminary plans t Việt làm thế nào để nói

The architect, in cooperation with

The architect, in cooperation with designer ,draws preliminary plans to show the size of the house , the interior arrangement of the rooms and where all the fittings must go in the house. The architect can also give the client a rough estimate of the cost. the architect should cooperate with a surveyor, who will measure the plot of land or site. Together thay will make a plan, and the investor should then apply for planning permit to the local building authority.
After receiving a permit for the construction the architect works out what will needed to build the house anh how much it will cost. At this stage the architect or the client himself should find a building contractor, also known as a builder. Several building contractors can be invited to submit their tenders. The client will choose contractor offering the best quality for a reasonable price. The architect usually assists his client to draw up a contract with building contractor.
The executing procedures
The builder ia the one who manages the whole process of constructing a house. He has to hire independent crews known as subcontractorsto perform various types of work , and he regularly submits their bills to the client.
At the very beginning, the workmenon the building site mark the shape of the house with wooden pegs and tape . Everything ia then ready for digging up the topsoil to prepare the site for laying the foundation. After the foundation is laid and set, the workmen put a waterproof layer on top of it to prevent moisture in the ground from passing to the rest of the house. Then the bricklayerscan start building the walls. To make th walls stronger the bricks must overlap each other. This is called binding/bonding. When the vertical walls are built, the carpenterscan begin their work . A carpenter ia a man who does the rough woodwork on a house, e.g.., he installs the beams and joists that hold the ceilingup
In most cases the walls of the house are too high for the bricklayers, carpenters and plasterers to reach, so a scaffold has to be made. A scaffold is a platform of planks for the workmen to stand on. It is held up by a framework of steel tubes. After that the tilercan fix the rool tiles onto the roof so that they overlap each other. Whenthe roof is completed, the guttering and drainpipes are installed. They collect the rainwater that runs from the roof, and take it into the drains.
A special crew then installs the windows. Once the house is covered with the roof and the windows are installed, many different workmen come and finish the house. Plumbers install water pipes to carry clean water into the house. They also lay pipes to carrywaste water away to sewers. At the same time electricianscan start their work as well. They fasten wires on the walls and put in all the lights and plug-sockets according to a special plan made by the draftsman. They have to observe special safety precautions.
When all the wire and pipes are in place, the house is ready for the plasterers. They cover the walls and ceilings with plaster to form a hard and smoothsurface and leave it to the paintersand decoratorsto give the interior of the house its final appearance. After the interior of the house is completed, the façade ( the exterior ) is constructed
Exercise 1
Match the word in column A with its definition in column B
1 architect A. a person who measures the plot of land or site
2. surveyor B. workers who do the construction at the cite
3. workmen C. cover the walls and ceilings with plaster to form a smooth surface
4. plumber D. the surface layer of the earth
5. plasters E. a plat form of planks for the workmen to stand on
6. topsoil F. installs water pipes to carry clean water into the house
7. scaffold G. collect the rainwater that runs from the roof
8. drainpipes H. an inside part of the house
9. authority I. one who gives the client a rough estimate of the cost
10. interior J. a person who gives building permits and manges the construction
Exercise 2
Choose the best word or phrase in A, B, C or D to compete each of the following sentences
1. Large ………. And small private owners have been building new houses in almost cities and countryside
a. investors b. contractors c. builders d. workers
2. At the moment most cities nationwide, especially in …… countries, look like a large building site
a. foreign b. developed c. developing d. under-developing
3. The procedure for building a house is quite a ( an ) ……….. one.
a. fast b. easy c. simple d. complex
4. The …………… can also give the client a rough estimate of the cost
a. architect b. contractor c. workman d. builder
5. A ……….. is a person who measures the plot of land or site
a. architect b. surveyor c. contractor d. client
6. A building project should be applied tho the local building ……. For a planning permit
a. architect b. contractor c. authority d. company
7. After receiving a permit for the construction, the …… works out what will be needed to build the house and how much it will cost
a. architect b. builder c. contractor d. surveyor
8. Several building contractors can be invited to ……. Their tenders
a. sell b. evaluate c. buy d. submit
9. the client will choose the contractor offering the best …… for a reasonable price
a. quantities b. quality c. machines d. money
10. the contractor is the one who ….. the whole process of constructing a house
a. sells b. buys c. manages d. pays for
11. at the very beginning, the …. On the building site mark the shape of the house with wooden pegs and tape
a. workmen b. architects c. clients d. investors
12. at the cite, the ….. is dug up to prepare the site for laying the foundation
a. yard b. earth c. topsoil d. undersoil
13. after the foundation is laid and set, the workmen put a ….. layer on top of it to prevent moisture in the ground from passing to the rest of the house
a. waterproof b. sand c. brick d. wood
14. after the foundation is laid and set, the workmen put a waterprooflayer on top of the ……. To prevent moisture in the ground from passing to the rest of the house
a. ground b. foot c. wall d. foundation
15. ……….. must be built overlaping each otherto make the walls stronger
a. bricks b. concrete c. foundation d. walls
16. a carpenter is a man who dose the rough ………. On a house
a. concrete b. woodwork c. drainpipe d. scaffolding
17. a carpenter is a man who installs the beams and …….. that hold the ceilingup
a. roofs b. pillars c. joists d. floors
18. a …….. is a platform of planks for the workmen to stand on
a. formwork b. stair c. ladder d. scaffolf
19. the guttering and …… collect the rainwater that runs from the roof, and take it into the drains
a. drainpipes b. ceilings c. floors d. pipes
20. …….. install water pipes to carry clean water into the house
a. plumbers b. electricians c. architects d. workmen
21. when all the wires and pipes are in place, the house is ready for the ….
a. electricians b. builders c. plasterers d. plumbers
22. ……. Cover the walls and ceilings with plaster to form a hard and smoothsurface
a. plumbers b. electricians c. bricklayers d. plasters
23. when the house is completed, the client can ….. it
a. occupy b. build c. buy d. hire
24. after the …… of the house is completed, the façade ( the exterior) is constructed
a. outside b. interior c. exterior d. doorstep
25. contracts genrally provide for various ……. Liability periods of six, twelve or righteen months from completion
a. services b. facilities c. defects d. construction work
Exercise 3
Translate the sentences into Vietnamese
1. Detached house or bungalows are builtin the buburbs of the cities an village
2. investors usually have an idea of house types they want to build to meet their needs
3. after receiving a permit for the construction the architect works out what will needed to build the house and how much it will cost
4. the client will choose the contractor offering the bestquality for a reasonable price
5. In most cases, the walls of the house are too high for the bricklayer , carpenters and plasterers to reach, so a scaffold has to be made
3. roof structures
Pre-reading: discuss these question
1. what is the role of a house roof ?
2. what are the three important elements in designing a house roof ?
3. what are the important components in designing modern house roofs ?
4. what kinds of roofs are there ?
A roof covers the top part of a building and protects it from the effects of weather such as rain, heat, sunlight, cold or wind. The characteristics of a roof depend upon the purpose of the building it covers, the available roofing materials and the local traditions of construction and concepts of architectural design and practice
There are three elements to consider in a roof design: the available materials, the construction of the building and the durability of a roof. Tthe he materials of a roof may vary from wooden shingles or the bark of certain trees to slate, sheet metal and pre-cast concrete or creramictiles. Ceramic tiles have been the predominant roofing material for centuries. The construction of a roof is determined by its method of support, how the space underneath it is bridged and whether or not the roof is pitched. The pitch is the angle at which the roof rises from its lowest to highest point. Most roofs are slopedor pitched. The durability of a roof is a matter of concern because the roof is often the least accessible part of a building for purposes of repair and renewal, while its damage or destruction can have serious effects
Over the centuries, roof-building techniques have been refined to yield roofs of considerable strength anf durability. A wide variety of materials have been developed, and homeowners have a vast selection of material, colors, prices, and other choices. A contemporary roof, regardless of the shape or surface material, constist of a large number of components: wood framing, sheathing, underlayment,
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
The architect, in cooperation with designer ,draws preliminary plans to show the size of the house , the interior arrangement of the rooms and where all the fittings must go in the house. The architect can also give the client a rough estimate of the cost. the architect should cooperate with a surveyor, who will measure the plot of land or site. Together thay will make a plan, and the investor should then apply for planning permit to the local building authority.After receiving a permit for the construction the architect works out what will needed to build the house anh how much it will cost. At this stage the architect or the client himself should find a building contractor, also known as a builder. Several building contractors can be invited to submit their tenders. The client will choose contractor offering the best quality for a reasonable price. The architect usually assists his client to draw up a contract with building contractor.The executing proceduresThe builder ia the one who manages the whole process of constructing a house. He has to hire independent crews known as subcontractorsto perform various types of work , and he regularly submits their bills to the client.At the very beginning, the workmenon the building site mark the shape of the house with wooden pegs and tape . Everything ia then ready for digging up the topsoil to prepare the site for laying the foundation. After the foundation is laid and set, the workmen put a waterproof layer on top of it to prevent moisture in the ground from passing to the rest of the house. Then the bricklayerscan start building the walls. To make th walls stronger the bricks must overlap each other. This is called binding/bonding. When the vertical walls are built, the carpenterscan begin their work . A carpenter ia a man who does the rough woodwork on a house, e.g.., he installs the beams and joists that hold the ceilingupIn most cases the walls of the house are too high for the bricklayers, carpenters and plasterers to reach, so a scaffold has to be made. A scaffold is a platform of planks for the workmen to stand on. It is held up by a framework of steel tubes. After that the tilercan fix the rool tiles onto the roof so that they overlap each other. Whenthe roof is completed, the guttering and drainpipes are installed. They collect the rainwater that runs from the roof, and take it into the drains.A special crew then installs the windows. Once the house is covered with the roof and the windows are installed, many different workmen come and finish the house. Plumbers install water pipes to carry clean water into the house. They also lay pipes to carrywaste water away to sewers. At the same time electricianscan start their work as well. They fasten wires on the walls and put in all the lights and plug-sockets according to a special plan made by the draftsman. They have to observe special safety precautions.When all the wire and pipes are in place, the house is ready for the plasterers. They cover the walls and ceilings with plaster to form a hard and smoothsurface and leave it to the paintersand decoratorsto give the interior of the house its final appearance. After the interior of the house is completed, the façade ( the exterior ) is constructed
Exercise 1
Match the word in column A with its definition in column B
1 architect A. a person who measures the plot of land or site
2. surveyor B. workers who do the construction at the cite
3. workmen C. cover the walls and ceilings with plaster to form a smooth surface
4. plumber D. the surface layer of the earth
5. plasters E. a plat form of planks for the workmen to stand on
6. topsoil F. installs water pipes to carry clean water into the house
7. scaffold G. collect the rainwater that runs from the roof
8. drainpipes H. an inside part of the house
9. authority I. one who gives the client a rough estimate of the cost
10. interior J. a person who gives building permits and manges the construction
Exercise 2
Choose the best word or phrase in A, B, C or D to compete each of the following sentences
1. Large ………. And small private owners have been building new houses in almost cities and countryside
a. investors b. contractors c. builders d. workers
2. At the moment most cities nationwide, especially in …… countries, look like a large building site
a. foreign b. developed c. developing d. under-developing
3. The procedure for building a house is quite a ( an ) ……….. one.
a. fast b. easy c. simple d. complex
4. The …………… can also give the client a rough estimate of the cost
a. architect b. contractor c. workman d. builder
5. A ……….. is a person who measures the plot of land or site
a. architect b. surveyor c. contractor d. client
6. A building project should be applied tho the local building ……. For a planning permit
a. architect b. contractor c. authority d. company
7. After receiving a permit for the construction, the …… works out what will be needed to build the house and how much it will cost
a. architect b. builder c. contractor d. surveyor
8. Several building contractors can be invited to ……. Their tenders
a. sell b. evaluate c. buy d. submit
9. the client will choose the contractor offering the best …… for a reasonable price
a. quantities b. quality c. machines d. money
10. the contractor is the one who ….. the whole process of constructing a house
a. sells b. buys c. manages d. pays for
11. at the very beginning, the …. On the building site mark the shape of the house with wooden pegs and tape
a. workmen b. architects c. clients d. investors
12. at the cite, the ….. is dug up to prepare the site for laying the foundation
a. yard b. earth c. topsoil d. undersoil
13. after the foundation is laid and set, the workmen put a ….. layer on top of it to prevent moisture in the ground from passing to the rest of the house
a. waterproof b. sand c. brick d. wood
14. after the foundation is laid and set, the workmen put a waterprooflayer on top of the ……. To prevent moisture in the ground from passing to the rest of the house
a. ground b. foot c. wall d. foundation
15. ……….. must be built overlaping each otherto make the walls stronger
a. bricks b. concrete c. foundation d. walls
16. a carpenter is a man who dose the rough ………. On a house
a. concrete b. woodwork c. drainpipe d. scaffolding
17. a carpenter is a man who installs the beams and …….. that hold the ceilingup
a. roofs b. pillars c. joists d. floors
18. a …….. is a platform of planks for the workmen to stand on
a. formwork b. stair c. ladder d. scaffolf
19. the guttering and …… collect the rainwater that runs from the roof, and take it into the drains
a. drainpipes b. ceilings c. floors d. pipes
20. …….. install water pipes to carry clean water into the house
a. plumbers b. electricians c. architects d. workmen
21. when all the wires and pipes are in place, the house is ready for the ….
a. electricians b. builders c. plasterers d. plumbers
22. ……. Cover the walls and ceilings with plaster to form a hard and smoothsurface
a. plumbers b. electricians c. bricklayers d. plasters
23. when the house is completed, the client can ….. it
a. occupy b. build c. buy d. hire
24. after the …… of the house is completed, the façade ( the exterior) is constructed
a. outside b. interior c. exterior d. doorstep
25. contracts genrally provide for various ……. Liability periods of six, twelve or righteen months from completion
a. services b. facilities c. defects d. construction work
Exercise 3
Translate the sentences into Vietnamese
1. Detached house or bungalows are builtin the buburbs of the cities an village
2. investors usually have an idea of house types they want to build to meet their needs
3. after receiving a permit for the construction the architect works out what will needed to build the house and how much it will cost
4. the client will choose the contractor offering the bestquality for a reasonable price
5. In most cases, the walls of the house are too high for the bricklayer , carpenters and plasterers to reach, so a scaffold has to be made
3. roof structures
Pre-reading: discuss these question
1. what is the role of a house roof ?
2. what are the three important elements in designing a house roof ?
3. what are the important components in designing modern house roofs ?
4. what kinds of roofs are there ?
A roof covers the top part of a building and protects it from the effects of weather such as rain, heat, sunlight, cold or wind. The characteristics of a roof depend upon the purpose of the building it covers, the available roofing materials and the local traditions of construction and concepts of architectural design and practice
There are three elements to consider in a roof design: the available materials, the construction of the building and the durability of a roof. Tthe he materials of a roof may vary from wooden shingles or the bark of certain trees to slate, sheet metal and pre-cast concrete or creramictiles. Ceramic tiles have been the predominant roofing material for centuries. The construction of a roof is determined by its method of support, how the space underneath it is bridged and whether or not the roof is pitched. The pitch is the angle at which the roof rises from its lowest to highest point. Most roofs are slopedor pitched. The durability of a roof is a matter of concern because the roof is often the least accessible part of a building for purposes of repair and renewal, while its damage or destruction can have serious effects
Over the centuries, roof-building techniques have been refined to yield roofs of considerable strength anf durability. A wide variety of materials have been developed, and homeowners have a vast selection of material, colors, prices, and other choices. A contemporary roof, regardless of the shape or surface material, constist of a large number of components: wood framing, sheathing, underlayment,
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
Các kiến trúc sư, với sự hợp tác với nhà thiết kế, rút ra các kế hoạch sơ bộ để hiển thị kích thước của ngôi nhà, việc bố trí nội thất của các phòng và nơi tất cả các phụ kiện phải đi trong nhà. Các kiến trúc sư cũng có thể cung cấp cho khách hàng một ước tính sơ bộ chi phí. các kiến trúc sư nên hợp tác với một điều tra viên, những người sẽ đo thửa đất hoặc trang web. Cùng thể thay sẽ làm cho một kế hoạch, và các nhà đầu tư thì nên áp dụng đối với giấy phép quy hoạch cho cơ quan xây dựng địa phương.
Sau khi nhận được giấy phép để xây dựng các kiến trúc sư làm việc ra những gì sẽ cần thiết để xây dựng các anh nhà nó sẽ có giá bao nhiêu. Ở giai đoạn này, các kiến trúc sư hoặc các khách hàng mình nên tìm một nhà thầu xây dựng, cũng được biết đến như một người xây dựng. Một số nhà thầu xây dựng có thể được mời nộp hồ sơ dự thầu. Các khách hàng sẽ lựa chọn nhà thầu cung cấp chất lượng tốt nhất với giá cả hợp lý. Các kiến trúc sư thường hỗ trợ khách hàng của mình để vẽ lên một hợp đồng với nhà thầu xây dựng.
Các thủ tục thực hiện
các builder ia một trong những người quản lý toàn bộ quá trình xây dựng một ngôi nhà. Ông đã thuê thuyền viên độc lập được gọi là subcontractorsto thực hiện các loại công việc khác nhau, và ông thường xuyên nộp hóa đơn cho khách hàng.
Lúc đầu, các workmenon công trường xây dựng đánh dấu hình dạng của ngôi nhà với những miếng gỗ và băng. Tất cả mọi thứ ia sau đó sẵn sàng cho đào lên lớp đất mặt để chuẩn bị địa điểm cho việc đặt nền móng. Sau khi nền tảng được đặt và thiết lập, những người thợ đặt một lớp chống thấm nước trên đầu trang của nó để ngăn độ ẩm trong đất từ qua tới phần còn lại của ngôi nhà. Sau đó, các bricklayerscan bắt đầu xây dựng các bức tường. Để làm cho bức tường thứ mạnh hơn những viên gạch phải chồng lên nhau. Điều này được gọi là ràng buộc / liên kết. Khi các bức tường thẳng đứng được xây dựng, các carpenterscan bắt đầu công việc của họ. Một người thợ mộc ia một người đàn ông làm đồ gỗ thô vào một ngôi nhà, ví dụ như., Ông cài đặt các dầm và dầm mà giữ ceilingup
Trong hầu hết các trường hợp, các bức tường của ngôi nhà là quá cao đối với các thợ nề, thợ mộc và plasterers để tiếp cận, do đó, một giàn giáo đã được thực hiện. Một giàn giáo là một nền tảng của các tấm ván cho các công nhân đứng trên. Nó được tổ chức bởi một khung ống thép. Sau đó các tilercan sửa chữa gạch rool lên mái nhà để họ chồng chéo nhau. Whenthe mái nhà được hoàn thành, các máng xối và drainpipes được cài đặt. Họ thu thập nước mưa chảy từ mái nhà, và đưa nó vào hệ thống thoát nước.
Một đoàn đặc biệt sau đó cài đặt các cửa sổ. Khi ngôi nhà được bao phủ với các mái nhà và các cửa sổ được cài đặt, nhiều công nhân khác nhau đến và hoàn thành ngôi nhà. Thợ lắp đường ống nước để mang nước sạch vào nhà. Họ cũng đặt đường ống để carrywaste nước đi xuống cống. Đồng thời electricianscan bắt đầu công việc của họ là tốt. Họ buộc chặt dây điện trên tường và đưa vào tất cả các đèn và phích cắm điện Ổ cắm điện theo một kế hoạch đặc biệt được làm bởi những người thảo văn thư. Họ phải quan sát biện pháp phòng ngừa an toàn đặc biệt.
Khi tất cả các dây điện và ống dẫn được đưa ra, ngôi nhà đã sẵn sàng cho các plasterers. Họ bao gồm các bức tường và trần thạch cao để tạo thành một khó khăn và smoothsurface và để nó vào paintersand decoratorsto cho nội thất của ngôi nhà xuất hiện cuối cùng của nó. Sau khi nội thất của ngôi nhà được hoàn thành, mặt tiền (bên ngoài) được xây dựng
tập 1
trận đấu từ trong cột A với định nghĩa của nó trong cột B
1 kiến trúc sư A. một người đo thửa đất hoặc trang
2. trắc B. người lao động làm xây dựng tại các trích dẫn
3. thợ C. bao gồm các bức tường và trần thạch cao để tạo thành một bề mặt nhẵn
4. thợ sửa ống nước D. các lớp bề mặt của trái đất
5. plaster E. một hình thức plat ván cho các công nhân đứng trên
6. đất mặt F. cài đặt đường ống nước để mang nước sạch vào nhà
7. giàn giáo G. thu thập nước mưa chảy từ mái nhà
8. drainpipes H. một phần bên trong của ngôi nhà
9. quyền I. một người cung cấp cho khách hàng một ước tính sơ bộ chi phí
10. nội thất J. một người đưa giấy phép xây dựng và xây dựng manges
Bài tập 2
Chọn từ hoặc cụm từ tốt nhất trong A, B, C hoặc D để cạnh tranh mỗi câu sau đây
1. Lớn .......... Và chủ sở hữu tư nhân nhỏ đã được xây dựng ngôi nhà mới ở các thành phố và vùng nông thôn gần như
một. nhà đầu tư b. nhà thầu c. nhà xây dựng d. công nhân
2. Tại thời điểm này hầu hết các thành phố trên toàn quốc, đặc biệt là trong ...... nước, trông giống như một công trường xây dựng lớn
a. b nước ngoài. phát triển c. phát triển d. phát triển thử nghiệm
3. Các thủ tục để xây dựng một ngôi nhà là khá (một) ......... .. một.
A. b nhanh. dễ dàng c. đơn giản d. phức tạp
4. Các ............... cũng có thể cung cấp cho khách hàng một ước tính sơ bộ chi phí
a. kiến trúc sư b. nhà thầu c. thợ d. xây dựng
5. A ......... .. là một người đo thửa đất hoặc trang web
một. kiến trúc sư b. trắc địa c. nhà thầu d. khách hàng
6. Một dự án xây dựng phải được áp dụng tho các địa phương xây dựng ....... Đối với một kế hoạch cho phép
một. kiến trúc sư b. nhà thầu c. thẩm quyền d. công ty
7. Sau khi nhận được giấy phép xây dựng, các công trình ...... ra những gì sẽ là cần thiết để xây dựng các ngôi nhà và bao nhiêu nó sẽ chi phí
một. kiến trúc sư b. builder c. nhà thầu d. trắc
8. Một số nhà thầu xây dựng có thể được mời ....... Hồ sơ dự thầu
a. bán b. đánh giá c. mua d. nộp
9. khách hàng sẽ lựa chọn nhà thầu cung cấp tốt nhất ...... với một mức giá hợp lý
a. số lượng b. chất lượng c. máy d. tiền
10. các nhà thầu là một trong những người ... .. toàn bộ quá trình xây dựng một ngôi nhà
một. bán b. mua c. quản lý d. trả tiền cho
11. ngay từ đầu, các .... Trên công trường xây dựng đánh dấu hình dạng của ngôi nhà với những miếng gỗ và băng
a. b công nhân. kiến trúc sư c. khách hàng d. nhà đầu tư
12. tại các trích dẫn, các ... .. được đào lên để chuẩn bị địa điểm cho việc đặt nền tảng
một. sân b. đất c. đất mặt d. lớp dưới đất
13. sau khi nền tảng được đặt và thiết lập, những người thợ đặt một ... .. lớp trên đầu trang của nó để ngăn độ ẩm trong đất từ qua tới phần còn lại của ngôi nhà
một. b thấm nước. cát c. gạch d. gỗ
14. sau khi nền tảng được đặt và thiết lập, những người thợ đặt một waterprooflayer trên đầu trang của các ....... Để ngăn độ ẩm trong đất từ qua tới phần còn lại của ngôi nhà
một. mặt đất b. chân c. tường d. nền tảng
15. ......... .. Phải được xây dựng overlaping mỗi otherto làm cho các bức tường mạnh
a. gạch b. c bê tông. móng d. bức tường
16. một người thợ mộc là một người đàn ông liều các ......... thô. Trên một ngôi nhà
một. b bê tông. đồ gỗ c. ống thoát nước d. giàn giáo
17. một người thợ mộc là một người đàn ông đã cài đặt các dầm và ...... .. mà giữ ceilingup
a. mái b. trụ cột c. dầm d. tầng
18. một ...... .. là một nền tảng của các tấm ván cho các công nhân đứng trên
một. ván khuôn b. cầu thang c. thang d. scaffolf
19. các máng xối và ...... thu thập nước mưa chảy từ mái nhà, và đưa nó vào hệ thống thoát nước
một. drainpipes b. trần c. tầng d. Ống
20. ...... .. Cài đặt đường ống nước để mang nước sạch vào nhà
một. thợ ống nước b. thợ điện c. kiến trúc sư d. công nhân
21. khi tất cả các dây và ống dẫn được đưa ra, ngôi nhà đã sẵn sàng cho ....
a. thợ điện b. nhà xây dựng c. plasterers d. thợ ống nước
22. ....... Bao gồm các bức tường và trần thạch cao để tạo thành một khó khăn và smoothsurface
a. thợ ống nước b. thợ điện c. thợ nề d. thạch cao
23. khi ngôi nhà được hoàn thành, các khách hàng có thể ... .. nó
một. chiếm b. xây dựng c. mua d. thuê
24. sau khi ...... của ngôi nhà được hoàn thành, mặt tiền (bên ngoài) được xây dựng
một. b bên ngoài. nội thất c. ngoài d. Trước cửa nhà
25. hợp đồng cung cấp cho genrally khác nhau ....... Thời kỳ trách nhiệm pháp lý của sáu, mười hai hay tháng righteen từ ngày hoàn thành
một. dịch vụ b. Các cơ sở c. khiếm khuyết d. xây dựng công trình
tập 3
Dịch các câu vào Việt
1. Nhà hoặc nhà gỗ tách rời được dựng sẵn các buburbs trong những thành phố một làng
2. các nhà đầu tư thường có một ý tưởng của các loại nhà họ muốn xây dựng để đáp ứng nhu cầu của họ
3. sau khi nhận được giấy phép để xây dựng các kiến trúc sư làm việc ra những gì sẽ cần thiết để xây dựng các ngôi nhà và bao nhiêu nó sẽ chi phí
4. khách hàng sẽ lựa chọn nhà thầu cung cấp các bestquality với một mức giá hợp lý
5. Trong hầu hết các trường hợp, các bức tường của ngôi nhà là quá cao đối với các thợ nề, thợ mộc và plasterers để tiếp cận, do đó, một giàn giáo phải được thực hiện
3. cấu trúc mái
Pre-reading: thảo luận các câu hỏi
1. vai trò của một mái nhà là gì?
2. ba yếu tố quan trọng trong việc thiết kế một mái nhà là gì?
3. các thành phần quan trọng trong việc thiết kế mái nhà hiện đại là gì?
4. những loại mái nhà đang có?
Một mái nhà bao gồm các phần trên cùng của một tòa nhà và bảo vệ nó khỏi những tác động của thời tiết như mưa, nhiệt, ánh sáng mặt trời, lạnh hoặc gió. Các đặc tính của một mái nhà phụ thuộc vào mục đích của việc xây dựng nó bao gồm, các vật liệu sẵn có lợp mái nhà và các truyền thống của địa phương xây dựng và khái niệm về thiết kế kiến trúc và thực hành
Có ba yếu tố để xem xét trong một thiết kế mái nhà: các vật liệu sẵn có, xây dựng việc xây dựng và độ bền của một mái nhà. Tthe ông vật liệu mái nhà có thể thay đổi từ bệnh zona bằng gỗ hoặc vỏ cây nhất định đối với đá phiến, tấm kim loại và bê tông đúc sẵn hoặc creramictiles. Gạch men đã được các vật liệu lợp chiếm ưu thế trong nhiều thế kỷ. Việc xây dựng một mái nhà được xác định theo phương pháp của nó hỗ trợ, cách không gian bên dưới nó là cầu nối và có hoặc không có mái dốc được. Các sân là góc đó mái tăng từ mức thấp nhất đến điểm cao nhất. Hầu hết các mái nhà được slopedor dốc. Độ bền của một mái nhà là một vấn đề quan tâm vì mái nhà thường là phần dễ tiếp cận nhất của một tòa nhà cho mục đích sửa chữa và đổi mới, trong khi thiệt hại hoặc phá hủy của nó có thể có tác động nghiêm trọng
Qua nhiều thế kỷ, các kỹ thuật trên mái nhà xây dựng đã được tinh chế để mái nhà năng suất đáng kể sức mạnh và kiên độ bền. Một loạt các tài liệu đã được phát triển, và các chủ nhà có một lựa chọn lớn các chất liệu, màu sắc, giá cả, và sự lựa chọn khác. Một mái nhà hiện đại, bất kể hình dạng hoặc bề mặt vật liệu, constist của một số lượng lớn các thành phần: khung bằng gỗ, vỏ bọc, lớp lót bên dưới,
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2024 I Love Translation. All reserved.

E-mail: