Classification Date : Presenter : Manager : Kim Tea Hyun
"Project concept
" 1. Location : Lot N, No.6 street, Hoa Khanh indutrial zone, Da Nang city
2. Project scope : Repairing and Maintaining works for fire prevention and fighting system
3. Construction period : Sep 2014 to Oct 2014
"Working scope
" 1. To re-survey all Fire prevention and fire fighting system
2. To repair and renew the pipe line and damaged parts (if any)
3. To make the design drawing and document according to the current technical standards of Law on Fire prevention and fighting
4. Making the document of verifying the fire prevention and fighting equipment installed for the works which are verified by Fire prevention and fighting police, accepting the fire prevention and fighting system with the Fire prevention and fighting police agency; Making the documents for application and getting Cetification of Fire protection and fighting for all factory from Da Nang Fire prevention and fighting police.
5. To make the legal documents, as-built drawing for the whole fire prevention and fighting system of the works (according to the new design drawing and have approval from authority).
6. All legal documents related to getting Cetification of Fire protection and fighting should be in accordance with the current regulations of Law on Fire prevention and fighting.
"Quotation
condition
" 1. BOQ must be in English and Vietnamese languages (two sets : 01 English and 01 Vietnamese).
2. The submitted quotation includes : all necessary material and manpower, survey fee, water, electricity, etc for construction.
3. When submitting quotation, total working schedule and construction plan must be submitted.
4. All management of transportation, loading and unloading of material
5. All civil appeal on dust, noisy, ect. during construction.
Construction condition 1.Quotation should follow the bidding invitation lay out, drawings and general work specification.
2. Whenever interrupting other work procedure, compensate the damage on this.
3. When starting work, submit actually working plan and schedule to project manager for approval.
4.When submitting quotation, consider fully the bidding invitation lay out, drawings and all concerning
about works. When there is increase of quantity later, investor shall not accept this increase
and when there is decrease of quantity , investor will deduct the contract amount followed by actually quantity.
5. Contractor shall be careful to other work and nearby building. When there are some damage on this, Contractor has all responsibility and compensate for it.
6. Contractor has all responsibility on civil appeals, safety and environment issues.
7.Contractor shall submit the insurance certificate of labour about safety and hazard while working.
8. When working delayed. Investor will deduct 0.25% day of contract amount.
9. Warranty period : 1 year from the date of handing over (Retention 5% of the contract value)
10. Contractor shall be responsible for doing and providing all things of whatsoever nature or description which are not specifically included or mentioned in the Contract Documents but could be necessary for execution, completion of the works or services as required and specified in the Contract Agreement.
11. When Contractor is not submitting the quotation on due time, investor regards it has abandonment of the bidding
12. Cleaning and arrangement working area after working finished always.
Submitting place 1. To DAEWON DA NANG OFFICE (Tel : 08. 740. 4006) To : Mr Kim Tea Hyun
2. Address : 9th floor, Cantavil An Phu Complex area, No.1 Song Hanh street, Ha Noi highway, An Phu ward, District No.2, HCM city
3. Due date :
Attender for the biding explanation. DAEWON DA NANG CO., LTD CONTRACTOR Attender.
Sao Viet Mr Hoa 0935 181114
Thien Nhat Minh Mr Binh 0987 444448
SQ Viet Nam Mr Dung 0904 703902
Bao An Thanh Mr Tam 0905 776858
đang được dịch, vui lòng đợi..