I have received the PDF files, thank you.
We looked at the cost of producing the film.
At 150,000/sqm the margins are very low just on the cost of the film without
taking in to consideration transporting the film, machine
wear and tear maintenance and time to set up the files in the RIP.
We would have to charge 150,000/lineal metre. So the job you have sent me will be
3 cai x 1.6m x 0.429m x 150,000d = 720,000d
Let me know what you think.
Kind regards,
John