1. Which of these activities provides the biggest potential cost saving from the use of CAST?
A. Test management
B. Test design
C. Test execution
D. Test planning
Answer: c
2. Which of the following is true of the V-model?
A. It states that modules are tested against user requirements.
B. It only models the testing phase.
C. It specifies the test techniques to be used.
D. It includes the verification of designs.
Answer: D
3. Which of the following is NOT a white box technique?
A. Statement testing
B. Path testing
C. Data flow testing
D. State transition testing
Answer: D
4. Which of the following requirements is testable?
A. The system shall be user friendly.
B. The safety-critical parts of the system shall contain 0 faults.
C. The response time shall be less than one second for the specified design loaD.
D. The system shall be built to be portable.
Answer: C
5. Error guessing:
A. supplements formal test design techniques.
B. can only be used in component, integration and system testing.
C. is only performed in user acceptance testing.
D. is not repeatable and should not be useD.
Answer: A
6. Which one of the following statements about system testing is NOT true?
A. System tests are often performed by independent teams.
B. Functional testing is used more than structural testing.
C. Faults found during system tests can be very expensive to fix.
D. End-users should be involved in system tests.
Answer: D
7. Alpha testing is:
A. Post-release testing by end user representatives at the developer’s site.
B. The first testing that is performeD.
C. Pre-release testing by end user representatives at the developer’s site.
D. Pre-release testing by end user representatives at their sites.
Answer: C
8. Integration testing in the small:
A. Tests the individual components that have been developeD.
B. Tests interactions between modules or subsystems.
C. Only uses components that form part of the live system.
D. Tests interfaces to other systems.
Answer: B
9. Which one of the following describes the major benefit of verification early in the life cycle?
A. It allows the identification of changes in user requirements.
B. It facilitates timely set up of the test environment.
C. It reduces defect multiplication.
D. It allows testers to become involved early in the project.
Answer: C
10. Which of the following is a form of functional testing?
A. Boundary value analysis
B. Usability testing
C. Performance testing
D. Security testing
Answer: A
11. How would you estimate the amount of re-testing likely to be required?
A. Metrics from previous similar projects
B. Discussions with the development team
C. Time allocated for regression testing
D. a & b
Answer: D
12. Regression testing should be performed:
v) every week
w) after the software has changed
x) as often as possible
y) when the environment has changed
z) when the project manager says

A. v & w are true, x, y & z are false
B. w, x & y are true, v & z are false
C. w & y are true, v, x & z are false
D. w is true, v, x, y & z are false
Answer: C
13. When should testing be stopped?
A. when all the planned tests have been run
B. when time has run out
C. when all faults have been fixed correctly
D. it depends on the risks for the system being tested
Answer: D
14. Consider the following statements about early test design:
i. early test design can prevent fault multiplication
ii. faults found during early test design are more expensive to fix
iii. early test design can find faults
iv. early test design can cause changes to the requirements
v. early test design normally takes more effort

A. i, iii & iv are true; ii & v are false
B. iii & iv are true; i, ii & v are false
C. i, iii, iv & v are true; ii is false
D. i & ii are true; iii, iv & v are false
Answer: A
15. Non-functional system testing includes:
A. testing to see where the system does not function correctly
B. testing quality attributes of the system including performance and usability
C. testing a system function using only the software required for that function
D. testing for functions that should not exist
Answer: B
16. Which of the following is the main purpose of the integration strategy for integration testing in the small?
A. to ensure that all of the small modules are tested adequately
B. to ensure that the system interfaces to other systems and networks
C. to specify which modules to combine when, and how many at once
D. to specify how the software should be divided into modules
Answer: C
17. What is the purpose of a test completion criterion?
A. to know when a specific test has finished its execution
B. to ensure that the test case specification is complete
C. to set the criteria used in generating test inputs
D. to determine when to stop testing
Answer: D
18. Functional system testing is:
A. testing that the system functions with other systems
B. testing that the components that comprise the system function together
C. testing the end to end functionality of the system as a whole
D. testing the system performs functions within specified response times
Answer: C
19. Beta testing is:
A. performed by customers at their own site
B. performed by customers at the software developer's site
C. performed by an Independent Test Team
D. performed as early as possible in the lifecycle
Answer: A
20. Which of the following techniques is NOT a black box technique?
A. state transition testing
B. LCSAJ
C. syntax testing
D. boundary value analysis
Answer: B
21. The main focus of acceptance testing is:
A. finding faults in the system
B. ensuring that the system is acceptable to all users
C. testing the system with other systems
D. testing from a business perspective
Answer: D
22. The difference between re-testing and regression testing is:
A. re-testing ensures the original fault has been removed; regression testing looks for unexpected side-effects
B. re-testing looks for unexpected side-effects; regression testing ensures the original fault has been removed
C. re-testing is done after faults are fixed; regression testing is done earlier
D. re-testing is done by developers; regression testing is done by independent testers
Answer: A
23. Which of the following is NOT part of system testing?
A. business process-based testing
B. performance, load and stress testing
C. usability testing
D. top-down integration testing
Answer: D
24. Which of the following is not part of performance testing?
A. Measuring response times
B. Recovery testing
C. Simulating many users
D. Generating many transactions
Answer: B
25. Maintenance testing is:
A. Updating tests when the software has changed
B. Testing a released system that has been changed
C. Testing by users to ensure that the system meets a business need
D. Testing to maintain business advantage
Answer: B
26. Which of the following is the best source of Expected Outcomes for User Acceptance Test scripts?
A. Actual results
B. Program specification
C. User requirements
D. System specification
Answer: c
27. The most important thing about early test design is that it:
A. makes test preparation easier.
B. means inspections are not required.
C. can prevent fault multiplication.
D. will find all faults.
Answer: C

31. Which of the following is not part of performance testing:
A. Measuring response time
B. Measuring transaction rates
C. Recovery testing
D. Simulating many users
Answer: C
32. Which one of the following statements about system testing is NOT true?
A. System tests are often performed by independent teams.
B. Functional testing is used more than structural testing.
C. Faults found during system tests can be very expensive to fix.
D. End-users should be involved in system tests.
Answer: D
33. Software testing activities should start
A. As soon as the code is written
B. during the design stage
C. when the requirements have been formally documented
D. as soon as possible in the development life cycle
Answer: B

37. Which of the following is NOT part of system testing:
A. business process-based testing
B. performance, load and stress testing
C. requirements-based testing
D. top-down integration testing
Answer: D
38. To test a function, the programmer has to write a _________, which calls the function to be tested and passes it test data.
A. Stub
B. Driver
C. Proxy
D. None of the above
Answer: B
39. Which of the following statements is not true
A. performance testing can be done during unit testing as well as during the testing of whole system
B. The acceptance test does not necessarily include a regression test
C. Verification activities should not involve testers (reviews, inspections etC.
D. Test environments should be as similar to production environments as possible
Answer: C
40. Which of the following is NOT a type of non-functional test?
A. State-Transition
B. Usability
C. Performance
D. Reliability
Answer: A
41. Which of the following is not the integration strategy?
A. Design based
B. Big-bang
C. Bottom-up
D. Top-down
Answer:A

44. Use cases can be performed to test
A. Performance testing
B. Unit testing
C. Business scenarios
D. Static testing
Answer: C

47. Which of the following list contains only non-functional tests?
A. compatibility testing, usability testing, performance testing
B. System testing, performance testing
C. Load testing, stress testing, component testing, portability testing
D. Testing various configurations, beta testing, load testing
Answer: C
48. V-Model is:
A. A software development model that illustrates how testing activities integrate with software development phases
B. A software life-cycle model that is not relevant for testing
C. The official software development and testing life-cycle model of ISTQB
D. A testing life cycle model including unit, integration, system and acceptance phases
Answer: A
49. Maintenance testing is:
A. Testing management
B. Synonym of testing the quality of service
C. Triggered by modifications, migration or reti
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
1. Which of these activities provides the biggest potential cost saving from the use of CAST? A. Test managementB. Test designC. Test executionD. Test planningAnswer: c2. Which of the following is true of the V-model?A. It states that modules are tested against user requirements.B. It only models the testing phase.C. It specifies the test techniques to be used.D. It includes the verification of designs.Answer: D3. Which of the following is NOT a white box technique?A. Statement testingB. Path testingC. Data flow testingD. State transition testingAnswer: D4. Which of the following requirements is testable? A. The system shall be user friendly. B. The safety-critical parts of the system shall contain 0 faults. C. The response time shall be less than one second for the specified design loaD. D. The system shall be built to be portable. Answer: C5. Error guessing: A. supplements formal test design techniques. B. can only be used in component, integration and system testing. C. is only performed in user acceptance testing. D. is not repeatable and should not be useD. Answer: A6. Which one of the following statements about system testing is NOT true? A. System tests are often performed by independent teams. B. Functional testing is used more than structural testing. C. Faults found during system tests can be very expensive to fix. D. End-users should be involved in system tests. Answer: D7. Alpha testing is:A. Post-release testing by end user representatives at the developer’s site. B. The first testing that is performeD. C. Pre-release testing by end user representatives at the developer’s site. D. Pre-release testing by end user representatives at their sites. Answer: C8. Integration testing in the small: A. Tests the individual components that have been developeD. B. Tests interactions between modules or subsystems. C. Only uses components that form part of the live system. D. Tests interfaces to other systems. Answer: B9. Which one of the following describes the major benefit of verification early in the life cycle? A. It allows the identification of changes in user requirements. B. It facilitates timely set up of the test environment. C. It reduces defect multiplication. D. It allows testers to become involved early in the project. Answer: C10. Which of the following is a form of functional testing? A. Boundary value analysis B. Usability testing C. Performance testing D. Security testing Answer: A11. How would you estimate the amount of re-testing likely to be required? A. Metrics from previous similar projects B. Discussions with the development team C. Time allocated for regression testing D. a & bAnswer: D12. Regression testing should be performed: v) every week w) after the software has changed x) as often as possible y) when the environment has changed z) when the project manager says A. v & w are true, x, y & z are false B. w, x & y are true, v & z are false C. w & y are true, v, x & z are false D. w is true, v, x, y & z are false Answer: C13. When should testing be stopped? A. when all the planned tests have been run B. when time has run out C. when all faults have been fixed correctly D. it depends on the risks for the system being tested Answer: D14. Consider the following statements about early test design: i. early test design can prevent fault multiplication ii. faults found during early test design are more expensive to fix iii. early test design can find faults iv. early test design can cause changes to the requirements v. early test design normally takes more effort A. i, iii & iv are true; ii & v are false B. iii & iv are true; i, ii & v are false C. i, iii, iv & v are true; ii is false D. i & ii are true; iii, iv & v are false Answer: A15. Non-functional system testing includes: A. testing to see where the system does not function correctly B. testing quality attributes of the system including performance and usability C. testing a system function using only the software required for that function D. testing for functions that should not exist Answer: B16. Which of the following is the main purpose of the integration strategy for integration testing in the small? A. to ensure that all of the small modules are tested adequately B. to ensure that the system interfaces to other systems and networks C. to specify which modules to combine when, and how many at once D. to specify how the software should be divided into modules Answer: C17. What is the purpose of a test completion criterion? A. to know when a specific test has finished its execution B. to ensure that the test case specification is complete C. to set the criteria used in generating test inputs D. to determine when to stop testing Answer: D18. Functional system testing is: A. testing that the system functions with other systems B. testing that the components that comprise the system function together C. testing the end to end functionality of the system as a whole D. testing the system performs functions within specified response times Answer: C19. Beta testing is: A. performed by customers at their own site B. performed by customers at the software developer's site C. performed by an Independent Test Team D. performed as early as possible in the lifecycle Answer: A20. Which of the following techniques is NOT a black box technique? A. state transition testing B. LCSAJ C. syntax testing D. boundary value analysis Answer: B21. The main focus of acceptance testing is: A. finding faults in the system B. ensuring that the system is acceptable to all users C. testing the system with other systems D. testing from a business perspective Answer: D22. The difference between re-testing and regression testing is: A. re-testing ensures the original fault has been removed; regression testing looks for unexpected side-effects B. re-testing looks for unexpected side-effects; regression testing ensures the original fault has been removed C. re-testing is done after faults are fixed; regression testing is done earlier D. re-testing is done by developers; regression testing is done by independent testersAnswer: A23. Which of the following is NOT part of system testing? A. business process-based testing B. performance, load and stress testing C. usability testing D. top-down integration testingAnswer: D24. Which of the following is not part of performance testing? A. Measuring response times B. Recovery testing C. Simulating many users D. Generating many transactions Answer: B25. Maintenance testing is:A. Updating tests when the software has changed B. Testing a released system that has been changed C. Testing by users to ensure that the system meets a business need D. Testing to maintain business advantageAnswer: B26. Which of the following is the best source of Expected Outcomes for User Acceptance Test scripts? A. Actual results B. Program specification C. User requirements D. System specificationAnswer: c27. The most important thing about early test design is that it:A. makes test preparation easier.B. means inspections are not required.C. can prevent fault multiplication.D. will find all faults.Answer: C31. Which of the following is not part of performance testing:A. Measuring response timeB. Measuring transaction ratesC. Recovery testingD. Simulating many usersAnswer: C32. Which one of the following statements about system testing is NOT true?A. System tests are often performed by independent teams.B. Functional testing is used more than structural testing.C. Faults found during system tests can be very expensive to fix.D. End-users should be involved in system tests.Answer: D33. Software testing activities should startA. As soon as the code is writtenB. during the design stageC. when the requirements have been formally documentedD. as soon as possible in the development life cycleAnswer: B37. Which of the following is NOT part of system testing:A. business process-based testingB. performance, load and stress testingC. requirements-based testingD. top-down integration testingAnswer: D38. To test a function, the programmer has to write a _________, which calls the function to be tested and passes it test data.A. StubB. DriverC. ProxyD. None of the aboveAnswer: B39. Which of the following statements is not trueA. performance testing can be done during unit testing as well as during the testing of whole systemB. The acceptance test does not necessarily include a regression testC. Verification activities should not involve testers (reviews, inspections etC.D. Test environments should be as similar to production environments as possibleAnswer: C40. Which of the following is NOT a type of non-functional test?A. State-TransitionB. UsabilityC. PerformanceD. Reliability Answer: A41. Which of the following is not the integration strategy?A. Design basedB. Big-bangC. Bottom-upD. Top-downAnswer:A44. Use cases can be performed to test A. Performance testing B. Unit testingC. Business scenarios D. Static testingAnswer: C47. Which of the following list contains only non-functional tests?A. compatibility testing, usability testing, performance testingB. System testing, performance testingC. Load testing, stress testing, component testing, portability testingD. Testing various configurations, beta testing, load testingAnswer: C48. V-Model is:A. A software development model that illustrates how testing activities integrate with software development phasesB. A software life-cycle model that is not relevant for testingC. The official software development and testing life-cycle model of ISTQBD. A testing life cycle model including unit, integration, system and acceptance phasesAnswer: A49. Maintenance testing is:A. Testing managementB. Synonym of testing the quality of serviceC. Triggered by modifications, migration or reti
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
1. Mà trong số này hoạt động cung cấp tiết kiệm chi phí lớn nhất tiềm năng từ việc sử dụng CAST?
A. Kiểm tra quản lý
B. Thử nghiệm thiết kế
C. Kiểm tra thực hiện
D. Kiểm tra quy hoạch
Trả lời: c
2. Điều nào sau đây là đúng sự thật của V-mô hình?
A. Nó nói rằng mô-đun được kiểm tra đối với các yêu cầu của người dùng.
B. Nó chỉ mô hình giai đoạn thử nghiệm.
C. Nó chỉ định kiểm tra kỹ thuật được sử dụng.
D. Nó bao gồm các thẩm tra thiết kế.
Trả lời: D
3. Điều nào sau đây là không một kỹ thuật hộp trắng?
A. Tuyên bố thử nghiệm
B. Kiểm tra đường
C. Kiểm tra lưu lượng dữ liệu
D. Nhà nước kiểm tra chuyển tiếp
trả lời: D
4. Mà các yêu cầu sau đây có thể kiểm chứng?
A. Hệ thống sẽ được người dùng thân thiện.
B. Các bộ phận an toàn quan trọng của hệ thống phải có 0 lỗi.
C. Thời gian đáp ứng được ít hơn một giây cho việc thiết kế tải trọng quy định.
D. Hệ thống này được xây dựng để được cầm tay.
Trả lời: C
5. Lỗi đoán:
A. bổ sung các kỹ thuật thiết kế thử nghiệm chính thức.
B. chỉ có thể được sử dụng trong thành phần, tích hợp và thử nghiệm hệ thống.
C. chỉ được thực hiện trong thử nghiệm người dùng chấp nhận.
D. không lặp lại và không nên được sử dụng.
Trả lời: Một
6. Mà một trong những câu sau đây về hệ thống kiểm tra là không đúng?
A. Kiểm tra hệ thống thường được thực hiện bởi các nhóm độc lập.
B. Thử nghiệm chức năng được sử dụng nhiều hơn so với kiểm tra cấu trúc.
C. Lỗi tìm thấy trong quá trình kiểm tra hệ thống có thể rất tốn kém để sửa chữa.
D. Người dùng cuối cùng nên tham gia vào thử nghiệm hệ thống.
Trả lời: D
7. Thử nghiệm Alpha là:
A. Post-bản thử nghiệm của đại diện người sử dụng cuối cùng tại trang web của nhà phát triển.
B. Các thử nghiệm đầu tiên được thực hiện.
C. Pre-bản thử nghiệm của đại diện người sử dụng cuối cùng tại trang web của nhà phát triển.
D. Pre-bản thử nghiệm của đại diện người sử dụng cuối cùng tại trang web của họ.
Trả lời: C
8. Tích hợp thử nghiệm trong nhỏ:
A. Kiểm tra các thành phần riêng lẻ đã được phát triển.
B. Kiểm tra sự tương tác giữa các phân hệ hoặc hệ thống con.
C. Chỉ sử dụng các thành phần hình thành nên một phần của hệ thống sống.
D. Thử nghiệm giao diện với các hệ thống khác.
Trả lời: B
9. Mà một trong những điều sau đây mô tả các lợi ích chính của xác minh sớm trong vòng đời?
A. Nó cho phép xác định các thay đổi trong các yêu cầu của người dùng.
B. Nó tạo điều kiện kịp thời thiết lập của môi trường thử nghiệm.
C. Nó làm giảm nhân khiếm khuyết.
D. Nó cho phép xét nghiệm để tham gia sớm trong dự án.
Trả lời: C
10. Điều nào sau đây là một hình thức thử nghiệm chức năng?
A. Giá trị ranh giới phân tích
B. Khả năng sử dụng thử nghiệm
C. Hiệu suất thử nghiệm
D. An ninh kiểm tra
trả lời: A
11. Làm thế nào bạn sẽ ước lượng tái thử nghiệm khả năng được yêu cầu?
A. Số liệu từ các dự án tương tự trước đó
B. Thảo luận với các nhóm phát triển
C. Thời gian phân bổ cho thử nghiệm hồi quy
D. a & b
trả lời: D
12. Regression thử nghiệm nên được thực hiện:
v) mỗi tuần
w) sau khi phần mềm đã thay đổi
x) càng nhiều càng tốt
y) khi môi trường đã thay đổi
z) khi người quản lý dự án cho biết A. v & w là đúng sự thật, x, y & z là sai B. w, x & y là đúng sự thật, v & z là sai C. w & y là đúng sự thật, v, x & z là sai D. w là đúng, v, x, y & z là sai Trả lời: C 13. Khi thử nghiệm nên được dừng lại? A. khi tất cả các bài kiểm tra theo kế hoạch đã được chạy B. khi thời gian đã hết C. khi tất cả các lỗi đã được cố định một cách chính xác D. nó phụ thuộc vào những rủi ro cho hệ thống đang được thử nghiệm trả lời: D 14. Hãy xem xét các báo cáo sau đây về thiết kế thử nghiệm đầu: i. thiết kế thử nghiệm sớm có thể ngăn chặn lỗi nhân ii. lỗi tìm thấy trong quá trình thiết kế thử nghiệm đầu tiên là tốn kém hơn để sửa chữa iii. thiết kế thử nghiệm đầu tiên có thể thấy lỗi iv. thiết kế thử nghiệm sớm có thể gây ra những thay đổi các yêu cầu v. thiết kế thử nghiệm đầu tiên thường phải mất nhiều công sức A. i, iii & iv là đúng sự thật; ii & v là sai B. iii & iv là đúng sự thật; i, ii & v là sai C. i, iii, iv & v là đúng sự thật; ii là sai D. i & ii là đúng sự thật; iii, iv & v là sai trả lời: A 15. Thử nghiệm hệ thống không có chức năng bao gồm: A. thử nghiệm để xem nơi mà hệ thống không hoạt động chính xác B. thuộc tính chất lượng thử nghiệm của hệ thống bao gồm cả hiệu suất và khả năng sử dụng C. thử nghiệm một chức năng hệ thống chỉ sử dụng các phần mềm cần thiết cho rằng chức năng D. thử nghiệm cho các chức năng mà không nên tồn trả lời: B 16. Điều nào sau đây là mục đích chính của chiến lược tích hợp cho thử nghiệm tích hợp trong nhỏ? A. để đảm bảo rằng tất cả các mô-đun nhỏ được kiểm tra đầy đủ B. để đảm bảo rằng các giao diện hệ thống để hệ thống và các mạng khác C. để xác định những module để kết hợp khi nào và bao nhiêu một lúc D. để chỉ định cách các phần mềm nên được chia thành các module trả lời: C 17. Mục đích của một tiêu chí hoàn thành thử nghiệm là gì? A. cho biết khi một thử nghiệm cụ thể đã hoàn thành thực hiện của nó B. để đảm bảo rằng các đặc điểm kỹ thuật trường hợp kiểm tra hoàn tất C. để thiết lập các tiêu chuẩn được sử dụng trong việc tạo đầu vào thử nghiệm D. để xác định khi nào phải ngừng thử nghiệm trả lời: D 18. Thử nghiệm hệ thống chức năng là: A. thử nghiệm các chức năng hệ thống với các hệ thống khác B. thử nghiệm mà các thành phần bao gồm các chức năng hệ thống với nhau C. thử nghiệm cuối cùng để kết thúc chức năng của hệ thống như một toàn bộ D. thử nghiệm hệ thống thực hiện các chức năng trong thời gian đáp ứng quy định trả lời: C 19. Thử nghiệm Beta là: A. thực hiện bởi khách hàng tại trang web riêng của họ B. thực hiện bởi khách hàng tại trang web của nhà phát triển phần mềm của C. thực hiện bởi một nhóm thử nghiệm độc lập D. thực hiện càng sớm càng tốt trong vòng đời trả lời: A 20. Mà các kỹ thuật sau đây KHÔNG phải là một kỹ thuật hộp đen? A. kiểm tra nhà nước chuyển đổi B. LCSAJ C. kiểm tra cú pháp D. ranh giới phân tích giá trị trả lời: B 21. Trọng tâm chính của kiểm thử chấp nhận là: A. việc tìm kiếm lỗi trong hệ thống B. đảm bảo rằng hệ thống này là chấp nhận được đối với tất cả người dùng C. thử nghiệm các hệ thống với các hệ thống khác D. thử nghiệm từ một quan điểm kinh doanh trả lời: D 22. Sự khác biệt giữa tái kiểm tra và thử nghiệm hồi quy là: A. tái kiểm tra đảm bảo các lỗi ban đầu đã bị xóa; kiểm tra hồi quy tìm kiếm bất ngờ tác dụng phụ B. tái thử nghiệm tìm kiếm bất ngờ tác dụng phụ; kiểm tra hồi quy đảm bảo các lỗi ban đầu đã được gỡ bỏ C. tái kiểm tra được thực hiện sau khi lỗi được cố định; kiểm tra hồi quy được thực hiện trước đó D. tái kiểm tra được thực hiện bởi các nhà phát triển; kiểm tra hồi quy được thực hiện bằng cách kiểm tra độc lập trả lời: A 23. Điều nào sau đây là không một phần của hệ thống kiểm nghiệm? A. kinh doanh dựa trên quá trình thử nghiệm B. hiệu suất, tải và căng thẳng thử nghiệm C. khả năng sử dụng thử nghiệm D. top-down thử nghiệm tích hợp trả lời: D 24. Điều nào sau đây không phải là một phần của thử nghiệm hiệu suất? A. Đo thời gian phản ứng B. Thử nghiệm phục hồi C. Mô phỏng nhiều người sử dụng D. Tạo ra nhiều giao dịch trả lời: B 25. Kiểm tra bảo dưỡng là: A. Đang cập nhật bài kiểm tra khi các phần mềm đã thay đổi B. Thử nghiệm một hệ thống phát hành đã được thay đổi C. Thử nghiệm của người sử dụng để đảm bảo rằng hệ thống đáp ứng một doanh nghiệp cần D. Kiểm tra để duy trì lợi thế kinh doanh trả lời: B 26. Điều nào sau đây là nguồn tốt nhất của kết quả dự kiến cho tài nghiệm thu kịch bản? A. Kết quả thực tế B. Đặc điểm kỹ thuật chương trình C. Yêu cầu người sử dụng D. Đặc điểm kỹ thuật Hệ thống trả lời: c 27. Điều quan trọng nhất về thiết kế thử nghiệm đầu tiên là nó: A. làm cho chuẩn bị thử nghiệm dễ dàng hơn. B. có nghĩa là thanh tra không cần thiết. C. có thể ngăn chặn nhân lỗi. D. . sẽ tìm thấy tất cả các lỗi trả lời: C 31. Điều nào sau đây không phải là một phần của thử nghiệm hiệu suất: A. Đo thời gian phản ứng B. Đo giao dịch giá C. Phục hồi thử nghiệm D. Mô phỏng nhiều người sử dụng trả lời: C 32. Mà một trong những câu sau đây về hệ thống kiểm tra là không đúng? A. Kiểm tra hệ thống thường được thực hiện bởi các nhóm độc lập. B. Thử nghiệm chức năng được sử dụng nhiều hơn so với kiểm tra cấu trúc. C. Lỗi tìm thấy trong quá trình kiểm tra hệ thống có thể rất tốn kém để sửa chữa. D. Người dùng cuối cùng nên tham gia vào thử nghiệm hệ thống. Trả lời: D 33. Hoạt động kiểm thử phần mềm nên bắt đầu A. Ngay sau khi các mã được viết B. trong giai đoạn thiết kế C. khi các yêu cầu đã được chính thức ghi D. càng sớm càng tốt trong vòng đời phát triển trả lời: B 37. Điều nào sau đây là không một phần của hệ thống kiểm tra: A. kinh doanh dựa trên quá trình thử nghiệm B. hiệu suất, tải và căng thẳng thử nghiệm C. yêu cầu dựa trên thử nghiệm D. top-down thử nghiệm tích hợp trả lời: D 38. Để kiểm tra chức năng, các lập trình viên phải viết một _________, trong đó kêu gọi các chức năng để được kiểm tra và vượt qua nó có kiểm tra dữ liệu. A. Stub B. Lái xe C. Proxy D. Không có ở trên trả lời: B 39. Khẳng định nào sau đây là không đúng A. thực hiện thử nghiệm có thể được thực hiện trong quá trình kiểm tra đơn vị cũng như trong các thử nghiệm của toàn bộ hệ thống B. Việc nghiệm thu không nhất thiết phải bao gồm một thử nghiệm hồi quy C. Các hoạt động xác minh không nên liên quan đến kiểm tra (đánh giá, kiểm tra vv môi trường D. thử nghiệm nên càng giống với môi trường sản xuất có thể trả lời: C? 40. Điều nào sau đây là không một loại xét nghiệm không có chức năng A. Nhà Transition B . Usability C. Hiệu suất D. Độ bền trả lời: A? 41. Điều nào sau đây không phải là chiến lược hội nhập A. Thiết kế dựa B. Big-bang C. Bottom-up D. Top-down trả lời: A 44. Sử dụng các trường hợp có thể được thực hiện để kiểm tra A. Hiệu suất kiểm tra thử nghiệm B. Đơn vị kịch bản C. Business D. tĩnh thử nghiệm trả lời: C 47. Mà trong danh sách sau đây chỉ chứa các xét nghiệm chức năng không? A. kiểm tra tính tương thích, khả năng sử dụng thử nghiệm, kiểm tra hiệu suất B. Hệ thống kiểm tra, kiểm tra hiệu suất thử nghiệm C. Load, căng thẳng thử nghiệm, kiểm tra thành phần, tính di động thử nghiệm D. Kiểm tra cấu hình khác nhau, thử nghiệm beta, kiểm tra tải trọng trả lời: C 48. V-Model là: A. Một mô hình phát triển phần mềm để minh họa cách thức hoạt động thử nghiệm tích hợp với giai đoạn phát triển phần mềm B. Một phần mềm mô hình vòng đời mà không có liên quan để kiểm tra C. Sự phát triển phần mềm chính thức và thử nghiệm mô hình vòng đời của ISTQB D. Một mô hình vòng đời thử nghiệm bao gồm cả đơn vị, tích hợp, hệ thống và các giai đoạn chấp nhận trả lời: A 49. Kiểm tra bảo dưỡng là: A. Quản lý thử nghiệm B. Từ đồng nghĩa của kiểm tra chất lượng dịch vụ C. Kích hoạt bởi sự thay đổi, di chuyển hoặc Reti















































































































































































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.