1.5. Soil investigation, topographical survey and site preparationOWNER will sign a contract for soil investigation and topographical survey based on the drill mesh of 200m for the new expansion areas including lands located inside and outside of the existing refinery’s battery limit and also the sea area for new SPM and will hand over the result to CONTRACTOR by the end of October 2015 as OWNER’s plan.CONTRACTOR shall take total responsibility for accuracy and completeness of information that is required for FEED work regarding the soil investigation and topographical survey within contract timeframe, it consists of, but not limited to, as follows:(1) Verify the result of the soil investigation and topographical survey that will be handed over by OWNER.(2) Prepare specifications, issue Invitations to Bid, evaluate bids, subcontract award and manage subcontracts for any additional site topographical survey, soil investigation (geotechnical) and marine survey for the new expansion areas including lands located inside and outside of the existing refinery’s battery limit and also the sea area for new SPM for preparation of FEED package.(3) Develop specification for site requirements including design documents for site leveling and preparation;(4) Investigate possibilities to speed up DQRE PROJECT’s site preparation.(5) CONTRACTOR shall select and mobilize the marine engineering subcontractor during the basic of design (BOD) phase.(6) The comprehensive soil investigation and site topographical survey reports shall be an integral part of the FEED documentation.1.6. Resettlement and site preparation packageOWNER and Local authorities will be responsible for carrying out local people resettlement, mines clearance and site leveling and preparation.Design documents for site leveling and preparation shall be carried out and submitted by the CONTRACTOR. These documents shall be timely provided to the OWNER in accordance with an agreed schedule to ensure that OWNER can complete the site preparation works at the end of FEED stage as current schedule.
đang được dịch, vui lòng đợi..