some basic principles in the construction and:- horizontal by vertical, vertical surfaces do not overlap grout- mortar construction to achieve strength, viscosity standards and - regulations of the design-irrigated wet bricks before building-have full grout, average length 10 mm circuit, the circuit stood staggered 50mm- style houses along 1 level 3 or 5 along 1 horizontal- when the rain stopped construction due to storm cover to the wall is not affected*compliance of construction and acceptance of TCVN 4085-1985 and the records required in the design, bidding documents
đang được dịch, vui lòng đợi..
