Lift MCC and RCC, place on proper plinth supports, level the cabinets/ Nâng MCC và RCC, Build partition wall, able to support weight of MCC, in control roomSecure MCC and RCC to wallsGet cable trays and/or stand fabricatedGet all cable trays straight and installed, cables off groundInstall A/C in control roomFinish train pin fabricationInstall complete train on trackOrder/Get approved AB replacement partsReceive AB replacement parts, install in rideFull-train sensor alignment, full testing of Hang 10 componentsSwap compressor with Iron Horse, permanently secure it to floor, repairLightning protection (grounding) of trackGrounding of control systemAir line potential re-routing/air line protective conduit neededTighten and fully inspect all bolts and weldsGet and distribute NDT report for weldsOrder/Get approved Norgren replacement partsReceive and install Norgren (or equivalent) pneumatic partsOrder and install PC replacement batteryClean all tape and adhesive from track (required before train run)Clean site of all debris and garbage (required before train run)Clean mortar from transfer track cylinder (storage side, nearest station)Electrical box covers/Norgren parts needed from USA not VN?Turck transfer track pin prox sensor and clogged silencer recheckRun train around with dummies pre-Vekoma?Confirm schedule for Vekoma T&CSeal and mount open electrical box under lift (lighting or sound?)Troubleshoot compressor issuesBrushes need to be screwed into decking in stationMove fencing/add locked gate, to enclose control panel room for maintenance access Queue extension shield needs gap blocked to comply with safety envelope (emailed photo 08)Queue tunnel needs to be extended on ride high track side to comply with safety envelope (emailed photo 12)Audio rack needs to be relocated to storage room on station for future photo operation (emailed photo 09)Ride exit missing a gate installed next to operator booth. Gate swing direction toward down ramp and hardware NOTES AS PER DDP MINIGAME SUPPLEMENTARY PLANS. (emailed photo 10)Close all perimeter fence gaps greater than 10 cm (emailed photo 11 & 18)All ground to bottom fence rail must have no greater than 10 cm gap (emailed photo 13)Height Measurement sign coloring is not correct. Two green colors not separatedNeed to move regulation and height measurement signageGap below wall in transfer station needs to be reduced to 10cm or less (emailed photo 17)Vekoma spare pillows neededVekoma T&C/Run fault freeOperations training
đang được dịch, vui lòng đợi..