EPC Contractor obtains an approved deviation for Central Control Room Cables againstEPC Project Requirement 44.16.6.1 liThe Contractor shall provide cable trays andconduits for the power, control and instrumentation cables to and from the equipmentin his scope of supply
đang được dịch, vui lòng đợi..